|
|
TEST ACTION APPLICABILITY 4 Turn the ignition off. All Yes → Repair the short to ground in the (G60) Oil Pressure Signal circuit. No → Go To 5 5 Measure the resistance between the (G60) Oil Pressure Signal circuit and the (K900) All Yes → Repair the short between the (K900) Sensor ground and the (G60) Oil Pressure Signal circuit. No → Go To 8 6 Turn the ignition off. All Yes → Go To 7 No → Repair the open in the (K7) 5-volt Supply circuit. Perform POWERTRAIN VERIFICATION TEST VER - 2. 7 Measure the resistance between ground and the (K7) 5-volt Supply circuit in the Oil All Yes → Repair the short to ground in the (K7) 5-volt Supply circuit. Perform POWERTRAIN VERIFICATION TEST VER - 2. No → Go To 8 8 NOTE: Before continuing, check the PCM harness connector terminals for All Repair Replace and program the Powertrain Control Module per Service 127 DRIVEABILITY - GAS P0522-OIL PRESSURE CIRCUIT LOW — Continued |