Dubai Building Code (2021) - page 3

 

 

Dubai Building Code

Part B: Architecture

B 15

Ref. B.20

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Dubai hotel 

classification – Budget hotel criteria. Dubai: 

Department of Tourism and commerce marketing.

Ref. B.21

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel 1 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.22

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel 2 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.23

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel 3 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.24

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel 4 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.25

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel 5 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.26

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel apartment 

standard criteria. Dubai: Department of Tourism and 

commerce marketing.

Ref. B.27

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel apartment 

deluxe criteria. Dubai: Department of Tourism and 

commerce marketing.

Ref. B.28

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Hotel apartment 

superior criteria. Dubai: Department of Tourism and 

commerce marketing. 

Ref. B.29

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Resort 3 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.30

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Resort 4 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.31

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Resort 5 star 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.32

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Guest house 

“standard” criteria. Dubai: Department of Tourism and 

commerce marketing.

Ref. B.33

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Guest house “deluxe” 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.12

 DUBAI HEALTH AUTHORITY, 2013. 

Regulation for renal dialysis services. Dubai: Dubai 

Health Authority.

Ref. B.13

 DUBAI HEALTH AUTHORITY, 2019. DHA 

Health facility guidelines. Part A – Administrative 

provisions. Dubai: Dubai Health Authority. 

Ref. B.14

 DUBAI HEALTH AUTHORITY, 2019. Health 

facility guidelines. Part B – Health facility briefing and 

design.  Dubai: Dubai Health Authority.

Ref. B.15

 DUBAI HEALTH AUTHORITY, 2019. Health 

facility guidelines. Part C – Access, mobility, OH&S. 

Dubai: Dubai Health Authority.

Ref. B.16

 DUBAI HEALTH AUTHORITY, 2019. Health 

facility guidelines. Part D – Infection prevention and 

control. Dubai: Dubai Health Authority.

Ref. B.17

 DUBAI HEALTH AUTHORITY, 2019. DHA 

Health facility guidelines. Part E – Engineering. Dubai: 

Dubai Health Authority.

Ref. B.18

 DUBAI HEALTH AUTHORITY, 2019. Health 

facility guidelines. Part F – Feasibility, planning and 

costing. Dubai: Dubai Health Authority.

Ref. B.19

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2019, Hotel classification 

criteria for hotels, guest houses and hotel apartments, 

Dubai: DTCM. Available from: 

 

www.dubaitourism.gov.ae/en/services

.

Dubai Building Code

Part B: Architecture

B 16

Ref. B.42

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2010. DM-PH&SD-P4-TG17 – 

Guidelines for first aid requirement. Dubai: Public 

Health and Safety Department.

Ref. B.43

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020.  DM-PH&SD-GU81-PSPS2 – 

Public swimming pools safety guidelines. Dubai: Public 

Health and Safety Department.

Ref. B.44

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-PH&SD-GU80-PRSPS2 – 

Private swimming pools safety guidelines. Dubai: Public 

Health and Safety Department.

Ref. B.45

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2019. DM-PH&SD-P7-TG01 – 

Guidelines for swimming pool safety. Dubai: Public 

Health and Safety Department.

Ref. B.46

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, undated. Technical Guidelines. Dubai: 

Public Health and Safety Department. Dubai: Public 

Health and Safety Department. Available from: 

 

www.dm.gov.ae/municipality-business/health-and-

safety/technical-guidelines-list/

Ref. B.47

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-PH&SD-GU13-FCC2 – 

Technical guidelines for fitness centres compliance. 

Dubai: Public Health and Safety Department.

Ref. B.48

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-H & SD-GU02-SEPA – 

Guideline for safety in events/play area. Dubai: Public 

Health and Safety Department.

Ref. B.49

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-PH&SD-GU15-EIC2 

–Technical guidelines for educational institutes 

compliance.

Ref. B.50

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-PH&SD-GU19-CSMC2 – 

Technical guidelines for compliance of spa and massage 

centers. Dubai: Public Health and Safety Department.

Ref. B.51

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-PH&SD-GU73-SUL2 – 

Technical guideline on safe use of ladders. Dubai: Public 

Health and Safety Department.

Ref. B.52

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2020. DM-PH&SD-P4-TG26 – Safety 

and health requirements for laundry operations. Dubai: 

Public Health and Safety Department.

Ref. B.53

 PUBLIC HEALTH AND SAFETY 

DEPARTMENT, 2018. DM-PH&SD-P7-WI06 – Health 

requirements for health clubs. Dubai: Public Health and 

Safety Department.

Ref. B.54

 FOOD CONTROL DEPARTMENT, FOOD 

STUDIES & PLANNING SECTION, 2015. The general 

hygiene requirements of food establishments. Dubai: 

Food Control Department.

Ref. B.34

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. Youth hostel 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.35

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2014. University campus 

criteria. Dubai: Department of Tourism and commerce 

marketing.

Ref. B.36

 DEPARTMENT OF TOURISM AND 

COMMERCE MARKETING, 2019. Licensing and 

classification manual for hotels, guest houses and 

hotel apartments in the Emirate of Dubai. Dubai: 

Department of Tourism and commerce marketing.

Ref. B.37

 ROADS AND TRANSPORT AUTHORITY. 

Dubai Access management manual. Dubai: Roads and 

Transport Authority.

Ref. B.38

 ROADS AND TRANSPORT AUTHORITY, 

2017. Geometric design manual for Dubai Roads. 

Dubai: Roads and Transport Authority.

Ref. B.39

 International commission on illumination,  

CIE 115:2010, Lighting of roads for motor and 

pedestrian traffic

Ref. B.40

 ROADS AND TRANSPORT AUTHORITY, 

2013. Dubai trip generation and parking rates manual. 

Dubai: Roads and Transport Authority.

Ref. B.41

 INTERNATIONAL CODE COUNCIL, 2015. 

International Building Code. Washington: International 

Code Council.

Dubai Building Code

Part B: Architecture

B 17

Ref. B.55

 DUBAI MUNICIPALITY, 2019. Planning 

guidelines for public amenities. Dubai: Dubai 

Municipality. 

Ref. B.56

 FACILITY GUIDELINES INSTITUTE, 2014. 

Guidelines for design and construction of hospitals 

and outpatient facilities 2014. USA: American Hospital 

Association.

Ref. B.57

 GOVERNMENT OF DUBAI, 2003. Local 

Order No. (11), Public health and safety of the society 

in the Emirate of Dubai. Dubai: Dubai Municipality.

Ref. B.58

 GOVERNMENT OF DUBAI, 2009. 

Administrative resolution No. (29) prescribing the 

adoption of “Manual of regulating smoking in public 

places”. Dubai: Dubai Municipality.

B.3.2 

Further reading

There is no further reading in this Part.

Dubai Building Code

Part B: Architecture

B 18

B.4  General architectural provisions

B.4.1 

General requirements

Buildings shall be designed according to the planning limitations and provisions 

required by the Authorities, as stipulated in development control regulations (DCR) 

and/or affection plans. Limitations on development include, but are not limited to: 

a)  authorized use of the building; 
b)  building setbacks; 
c) 

floor to area ratio; 

d)  access locations; 
e)  the gate level; 
f)  building service lines. 
Buildings located in heritage areas shall respect the identity of these areas and shall 

adhere to any conservation requirements imposed by the Authorities. 
The building or development should take the following into account:
1)  Arabic and Islamic cultural identity; 
2) 

local architectural character, especially for buildings of cultural significance; 

3)  the building’s relationship with the surrounding environment; 
4)  the building’s compatibility with the planning limitations and urban planning 

themes of surrounding developments. 

The massing of the proposed building should take into account the visual privacy of 

adjacent structures and buildings in the surrounding properties and neighbourhoods, 

as well as the privacy of different uses and occupancies within the same development.

B.4.2 

Development limitation

B.4.2.1 

Gate level

The gate level is a defined height on the plot boundary at the vehicular or pedestrian 

access point to the plot. It is an elevation difference between the road level (existing 

or future) and the level of the plot’s access point.
The gate level of a plot shall be a minimum height of +300 mm from the edge of the 

road or a slope of between 2-5% from the edge of the road to the plot’s access point.

The gate level, and the levels of the plot’s corners, are calculated based on Dubai 

Roads and Transport Authority’s (RTA) standard cross-section of road right of way 

(ROW), next to the plot. 

Dubai Building Code

Part B: Architecture

B 19

09

10

08

2%-5%

Figure B.6 

Building height

Key

01: Plot limit

02: Roof level

03: Last floor

04: Total building height

05: Building height

B.4.2.2 

Building height

Building heights shall follow the DCRs and affection plans. 
Buildings plots located in areas requiring Dubai Civil Aviation Authority (DCAA) 

approval (as noted in the affection plan, DCR or DCAA map) shall meet the 

Authority’s requirements and the height limitation imposed. 
Building height shall be calculated from the approved road edge level at the main plot 

access to the average finished floor level (FFL) of the roof as shown in Figure B.6. 

The total building height is the vertical distance measured from the approved road 

edge level at the main plot access to the highest roof surface or element.

Building ground should be elevated from adjacent roads to protect from flooding. 

Elevated access points shall also meet the requirements in 

C.5.

06: Gate level

07: Road edge level

08: Roof structure

09: Ground floor

10: Basement

Dubai Building Code

Part B: Architecture

B 20

66 m

01

1

2

3

5

6

7

8

9

10

11

4

Figure B.7 

Example of allowable building height calculation

Key

01: Maximum allowable total building height

To calculate the total allowable building height, the allowable number of floors, 

 

as defined by the affection plan or DCR, shall be multiplied by 6 m per floor. 

 

This does not impose restrictions on single floor heights.
Example: For a building with G+10 floors limit, the maximum allowable height shall be 

calculated as 11 (the number of floors) × 6 m (the factor) = 66 m maximum building 

height. See Figure B.7.

Parts of buildings and installations may exceed the maximum allowable height 

provided that this increase does not conflict with DCAA or DCR requirements. These 

parts include:
a)  ornamental elements such as minarets, dome and towers that are embellished  

in traditional and aesthetic patterns;

b)  chimneys and smokestacks, water reservoirs, elevator shafts, stairways, radio  

and television aerials, wind towers, pergolas, helipads and roof shading devices;

c)  advertisement boards conforming to Authority regulations for advertising  

(see 

E.10.9

 for restrictions on advertising within façades).

When helipads are provided on buildings, they shall conform to standard 

specifications approved by DCAA.

Dubai Building Code

Part B: Architecture

B 21

Table B.1  Setback calculation table

Building height by number  

of floors

Setback from neighbour (X)  

(see Figure B.8) (m)

Setback from road  

(see Figure B.9) (m)

Basement

Ground (G)

G+1 to G+3

0

G+4

3.75 

0

G+5

4.50 

0

G+6

5.25 

0

G+7

0

G+8

6.75 

0

G+9

7.50 

0

G+10 and above 

7.50 

0

B.4.2.3 

Building setbacks 

The building setback requirements in the affection plan or DCR shall take precedence 

over the setback requirements in this section. 

When setback limitations for the plot or development are not defined, setbacks shall 

be calculated from the plot limit to the face of buildings in accordance with Table B.1. 

Setbacks shall be calculated from ground floor and above.

Allowance for zero setback from neighbours shall be according to each affection plan 

or development DCR. Zero setback between two neighbouring retail plots is allowed 

unless otherwise defined in the affection plan or DCR. This only applies when both 

plots have retail use classification and for dedicated retail occupancy floors.

Figure B.8 

Setback from neighbours 

Key

01: Plot

X: Setback from neighbour (see Table B.1)

Plot limit

x x

01

01

01

Figure B.9 

Zero setback facing road

Key

01: Plot 

Plot limit

Dubai Building Code

Part B: Architecture

B 22

Setbacks are shown in plan view in Figure B.10. 

Setbacks shall also allow for fire separation between 

buildings and fire truck access routes. To prevent 

external fire spread, the building, shall be physically 

separated from adjacent plots/buildings or external 

walls and openings of the building shall be fire 

resistance rated (see Sections 2.7 and 2.8, Ch. 1 of 

UAE FLSC 

[Ref. B.1]

).

Fire truck access shall be provided between buildings 

and around buildings as required by Ch. 2 of UAE 

FLSC 

[Ref. B.1]

. This vehicle access might need to be 

accommodated within the plot limits.
Where high-rise and super high-rise buildings (as 

defined by UAE FLSC 

[Ref. B.1]

) are built on a podium 

and the distance from fire truck accessway to the 

façade of the high-rise/super high-rise exceeds 30 m, 

fire truck access to the podium shall be provided as 

required by Section 2.8, Ch. 2 of UAE FLSC 

[Ref. B.1]

Setbacks from sikkas shall be calculated from the 

centre of the sikka (see Figure B.11). When the sikka 

width is more than 6 m, the maximum applicable width 

from the centre of the sikka is 3 m. If the building 

setback from the plot limit is found to be 1.5 m or less, 

no setback is required. 
Plots neighbouring cemeteries shall provide a minimum 

setback of 3 m.
Plots adjacent to metro stations or metro 

infrastructure shall conform to the RTA railway 

protection code for the emirate of Dubai 

[Ref. B.2]

.

X

Y

X

02

01

02

03

04

Figure B.10 

Setback plan

Key

01: Building footprint

02: Neighbour

03: Allowable projection

04: Road

X: Setback from neighbour (see Table B.1)

Y: Setback from centre of sikka

Plot limit

Setback line

Figure B.11 

Setback from sikka 

Key

01: Plot

Y: Setback from centre of sikka

Plot limit

Y

Y

01

01

Dubai Building Code

Part B: Architecture

B 23

Figure B.12 

Setbacks between buildings in same plot

Key

01: Building footprint

02: Neighbour

03: Allowable projection

04: Road

X: Setback from neighbour, internal setback between buildings

Y: Setback from centre of sikka

Plot limit

Setback line

X

X

X

X

02

02

01

01

03

04

Y

The distance between multiple buildings on the same plot shall be equal to the 

setback required for both buildings from a neighbouring building plot, identified as (X) 

in Figure B.12, measured from the least horizontal distance between buildings. This 

distance shall be not less than 3 m between buildings height of ground floor only.

Dubai Building Code

Part B: Architecture

B 24

Figure B.13 

Allowed construction within setback

Key

01: Building footprint – above ground

02: Basement & building substructure

03: Sikka

04: Road

05: RMU rooms substations

06: Security or guard rooms

Plot limit

Setback line

03

02

01

05

06

04

The following structures shall be allowed within 

setbacks up to the plot limit as shown in Figure B.13: 

a)  plot boundary wall/fence; 
b)  site enhancement landscape and hardscape; 
c)  ring main unit (RMU) rooms and substations as 

required by service Authorities;

d)  basement and building substructure; 
e)  pergolas and light weight parking shading 

structures; 

f)  uncovered car parking and roadways;
g)  security and/or guard rooms;
h)  retail structures on plots where the neighbour is 

also a retail occupancy. 

Such arrangements shall not obstruct exit discharge to 

fire vehicle access way/public road (if any).

Dubai Building Code

Part B: Architecture

B 25

B.4.2.4 

Building areas 

B.4.2.4.1   Gross area (GA)

Gross area (GA) is the floor area within the inside 

perimeter of the external walls of a building. The 

measurement excludes shafts and courtyards, but 

includes corridors, stairways, ramps, closets, base of 

atria (or similar voids) and the thickness of interior 

walls, columns or other features.

GA is illustrated in Figure B.14. The highlighted areas 

are those included in the definition.
GA is used for occupant load calculations as defined in 

Table B.2, elevator exemptions in 

Part C

, in addition to 

other requirements in the DBC.

01

01

02

03

05

04

01

01

06

01

01

01

01

01

01

01

01

Figure B.14 

GA plan

Key

01: Residential unit

02: Elevator lobby

03: Corridor

04: Balcony

05: Service room

06: Staircase

Dubai Building Code

Part B: Architecture

B 26

Figure B.15 

Example of net area for different occupancies

Key

01: Meeting room 1

02: Lobby

03: Ballroom

04: Prayer room

05: Toilets

06: Meeting room 2

07: Restaurant

08: Kitchen

01

02

03

04

05

06

07

08

B.4.2.4.2   Net area (NA)

Net area (NA) is the actual occupied area, not 

including unoccupied accessory areas such as corridors, 

stairways, ramps, toilet rooms, mechanical rooms and 

closets.  

The calculation of NA is illustrated in the sample plan 

shown in Figure B.15. 
NA is used for occupant load calculations as defined 

in Table B.2 and parking rates defined in B.7.2.6.1, in 

addition to other requirements in the DBC. 

Dubai Building Code

Part B: Architecture

B 27

B.4.2.5 

Balconies, building projections and terraces

B.4.2.5.1   Limitations

A balcony, building projection or terrace (see Figure B.16 and Figure B.17) can be 

provided along the whole or part of the building façade constructed on the side of 

the plot that overlooks a road or neighbours. Balconies, building projections and 

terraces shall meet the following requirements and limitations. 
a)  The affection plan or DCR shall take precedence over the provisions in this 

subclause. 

b)  A balcony or projecting building element shall be situated at an elevated level 

from ground floor, not less than 3 m from FFL of sidewalks and footpaths as 

shown in Figure B.16. 

c)   Projections from vehicle roads shall be set back a minimum of 0.6 m from 

the edge of vehicle road, or a height clearance of not less than 5.5 m shall be 

maintained from road level as shown in Figure B.16.

d) 

Projections above fire truck accessways shall be not less than 4.5 m in height from 

road level in accordance with Section 2, Ch. 2 of UAE FLSC 

[Ref. B.1]

e)  Projections outside the plot boundary are permitted on the road-facing side when 

the width of road in which the balcony or projection protrudes exceeds 9 m.

f) 

Balconies and building projections shall be limited to 10% of the facing street 

width beyond the plot limit and 1.8 m maximum projection into the ROW as 

shown in Figure B.16.

g)  The minimum horizontal distance of balconies and building projections from other 

adjacent buildings, structures or neighbouring plots shall maintain the minimum 

required setback (see Figure B.17).

Plots adjacent to metro stations or metro infrastructure shall conform to the RTA 

railway protection code for the emirate of Dubai 

[Ref. B.2]

.

Privacy of neighbouring plots should be taken into account when setting the location 

and orientation of balconies. 
A privacy partition shall be provided between connected balconies of different 

residential units.

Dubai Building Code

Part B: Architecture

B 28

10% of x

1.8 m

01

0.6 m

x

03

02

5.5 m

3 m

1.8 m

3 m

Figure B.16 

Projection from ROW

Key

01: Road level

02: Sidewalk level

03: Plot limit

X: Road width

Dubai Building Code

Part B: Architecture

B 29

Figure B.17 

Projections within setbacks

Key

01: Plot limit, if applicable

02: Neighbour

03: Minimum required setback

04: Ground level

3 m

01

02

03

04

B.4.2.5.2   Guardrails for fall protection

Guardrails are required for any space, walking or standing which is elevated 760 mm 

above the FFL, with the exception of:

a)  the loading side of loading docks;
b)  the audience side of stages and raised platforms, including stairs leading up to the 

stage and raised platforms;

c) 

raised stage and platform floor areas, such as runways, ramps and side stages;

d)  vertical openings in the performance area of stages and platforms;
e)  elevated walking surfaces associated with stages and platforms for access/use of 

special lighting or equipment; and

f)  along vehicle service pits not accessible to the public.

The guardrail height from FFL (or lowest stepping feature, A in Figure B.18) shall be 

not less than 1,200 mm. 

The separation distance between vertical posts or members (see Figure B.18), curved 

frames or design features, of balcony, guardrail or handrail shall not allow the passage 

of a 100 mm diameter sphere.

Horizontal climbable elements are not permitted within 865 mm height of the 

bottom of the guardrail, i.e. (B) in Figure B.18.
If the design requires any gap between finished floor surface and the bottommost 

horizontal component of the railing (see Figure B.18), the gap shall be not more than 

100 mm. 
The balcony, handrail, guardrail assembly shall be able to withstand the loads 

specified in ASCE/SEI 7-16.

If the design demands usage of glass panels in the balcony construction, such glass 

shall provide containment and withstand the loads specified in ASCE/SEI 7-16 

 

(see 

E.9.2

).

Dubai Building Code

Part B: Architecture

B 30

01

02

100

≥ 

1,200

≥ 

865

100

Figure B.18  Guardrail specifications

Key

01: Gaps more than 100 mm not acceptable

02: Stepping feature within 865 mm of base of guardrail not acceptable

100

01

02

100

≥ 

1,200

≥ 

865

100

(a) Guardrail with stepping feature within 865 mm from FFL

(b) Guardrail without stepping feature within 865 mm from FFL

Dubai Building Code

Part B: Architecture

B 31

03

02

01

01

05

04

07

02

06

Figure B.19 

Plot coverage

Key

01: Building

02: Pergola

03: Non-functional projection

04: Parking canopy

05: Parking

06: Annex building

07: Roof eaves

Plot limit

B.4.2.6 

Plot coverage

Plot coverage shall be calculated as the horizontal area occupied by all main and 

annex buildings on the same plot, calculated from the external surfaces of external 

walls or useful roofed balconies in the ground or upper floors, whichever have more 

floor projections.
The following shall be excluded (see Figure B.19): 

a)  lightweight structures such as a canopy, parking shade(s), pergola(s); and
b)  ornamental and non-accessible building projections such as roof eaves, window 

shades.

B.4.2.5.3   Access doors

Balconies and terraces shall not have self-closing, self-latching or self-locking doors, 

which can accidentally lock people outside in the balcony or terrace.

Dubai Building Code

Part B: Architecture

B 32

B

B

A

A

Figure B.20 

Building exit separation 

Key

A: Building diagonal distance 

B: Direct distance between exit doors 

NOTE:

B = 1/3 A for sprinklerled buildings 

B = 1/2 A for unsprinklered buildings

B.4.3 

Building floors general requirements

B.4.3.1 

Ground floor

Ground floor use allowance shall conform to planning regulations. A building 

 

or facility may have more than one ground floor where a split-level entrance 

 

has been provided and where a building plot has significant level difference.
The ground floor shall be connected to the adjacent public ways by lobbies. 

 

The number and location of exits discharging directly from the building to outside 

shall conform to Section 3.10, Ch. 3 of UAE FLSC 

[Ref. B.1]

. The points of exit 

discharge shall be separated from each other on plan by one third (sprinklered 

buildings) or one half (unsprinklered buildings) of the largest measurements  

of the building diagonal distance (see Figure B.20).

An emergency command centre conforming to Table 1.9, Ch. 1 and Section 2.9,  

Ch. 2 of UAE FLSC 

[Ref. B.1]

 shall be provided in malls, amusement park, high-rise 

and super high-rise buildings. The emergency command centre may be shared with  

a security room, rest area or control room, provided that it meets emergency 

command centre specifications.
The emergency command centre shall be at ground floor and separated from the 

remainder of the building by a 1 h fire barrier constructed in accordance with Ch. 1 

 

of UAE FLSC 

[Ref. B.1]

. The entrance to the emergency command centre shall  

be on the exterior of the building along the fire accessway or if this is not feasible, 

 

at the main entrance lobby of the building. Emergency command centres shall meet 

the minimum room sizes specified in B.5.2. 

Dubai Building Code

Part B: Architecture

B 33

1.2 m

01

02

03

04

Figure B.21 

Basement height from gate level

Key

01: Upper floor

02: Ground floor

03: Basement floor

04: Gate level

B.4.3.2 

Basements

The space use shall conform to planning regulations.

Basement floors shall not extend beyond the plot limits.

The basement shall be connected to the building by means of vertical circulation 

(staircases/elevators) in accordance with Ch. 1 to Ch. 10 of UAE FLSC 

[Ref. B.1]

The basement slab soffit level shall not extend 1.2 m above the building gate level as 

shown in Figure B.21.

B.4.3.3 

Podium

Building podiums shall conform to planning regulations. 

When podium floors are used for habitable and occupiable spaces, these spaces 

 

shall be designed as indoor spaces with building envelope, acoustic treatment  

and ventilation/thermal comfort as required by 

Part E

 and 

Part H

Dubai Building Code

Part B: Architecture

B 34

Figure B.22 

Roof coverage and setback

Key

01: Staircase or elevator room 

02: Roof structure not more than 50% of the roof area

03: Roof

1.5 m

1.5 m

1.5 m

01

02

03

B.4.3.4 

Roof 

The space use shall conform to planning regulations. 
Accessible roofs shall be provided with life safety 

features such as fall protection and guardrails in 

accordance with B.4.2.5.2.

Water proofing and thermal insulation material shall be 

fitted on the roof deck in order to protect it from water 

leaks (see 

E.7.3.2

) and solar gain effects (see 

E.5.2.3

).

Structures at roof level shall not exceed 50% of the 

roof floor area as shown in Figure B.22. 

Roof structures shall be set back a minimum of 

1.5 m from the building envelope. Staircases and 

elevator rooms are excluded from the 1.5 m setback 

requirement, but they shall be calculated as part of the 

50% construction area.
Roof structures occupying more than 50% of the roof 

floor area or not provided with setback shall be treated 

as a regular floor. 

Dubai Building Code

Part B: Architecture

B 35

B.5  Minimum space requirements

B.5.1 

Occupant loads

Occupant load factors shall be determined in accordance with Table B.2.

Occupancy

Use 

Occupant load factor 

(m

2

 per person unless 

otherwise stated)

Area used for 

calculation  

Assembly

Concentrated 

– ballrooms, 

multipurpose- 

assembly halls 

0.65

Net area

Mosques, prayer halls 

and prayer rooms

0.9 for prayer area

Net area

Less concentrated 

– outdoor buildings, 

restaurants, dining 

areas, seated waiting 

areas

1.4

Net area

Conference rooms, 

meeting rooms

1.4

Net area

Exhibition halls, 

production studios 

1.4

Net area

Bench seating

455 mm linear

Net area

Fixed seating spaces 

(cinemas, theatres and 

similar)

According to number of 

fixed seats provided

Net area

Waiting areas – 

standing 

0.65

Net area

Kitchens (e.g. in 

restaurants, not private 

residential)

9.3

GA

Library – reading areas

4.6 

Net area

Library – stack areas

9.3

GA

Occupancy

Use 

Occupant load factor 

(m

2

 per person unless 

otherwise stated)

Area used for 

calculation  

Assembly

Swimming pools – 

water surface

4.6

GA

Swimming pools – deck

2.8

GA

Exercise room – 

without equipment 

1.4

GA

Exercise room – with 

equipment

4.6

GA

Stages

1.4

Net area

Gaming, amusement 

arcades

1.0

GA

Skating rinks

4.6

GA

Food courts – seating 

areas

1.4

Net area

Airport waiting areas

1.4

GA

Airport baggage claim

1.9

GA

Art galleries, museums 5.0

GA

Business 

Office – enclosed 

offices, low 

concentration

9.3

GA

Office – open offices, 

high concentration

4.6

GA

Table B.2  Occupant load factor per person

Dubai Building Code

Part B: Architecture

B 36

Occupancy

Use 

Occupant load factor 

(m

2

 per person unless 

otherwise stated)

Area used for 

calculation  

Retail

Retail shops 

5.6

GA

Department stores, 

multi-level retail

3.7

GA

Floors used for goods 

not accessed by public

27.9

GA

Mall

Mall – less than 

 

14,000 m

2

 in area

2.8

Gross leasable area in 

accordance with UAE 

FLSC 

[Ref. B.1]

Mall – more than 

14,000 m

2

 in area

3.3

Gross leasable area in 

accordance with UAE 

FLSC 

[Ref. B.1]

Industrial 

Factories

9.3

GA

Storage

Warehouse

27.9

GA

Educational 

Classrooms

1.9

Net area

Laboratories, vocational

4.6

Net area

Residential

Accommodation, 

shared sleeping spaces

5.0

Net area

Labour accommodation 

– sleeping spaces

3.7

Net area

Healthcare

Refer to DHA 

regulations and 

guidelines 

[Ref. B.3 to 

Ref. B.18]

The occupant load factors in Table B.2 generally align with UAE FLSC 

[Ref. B.1]

 with 

the exception of residential. However, exit widths and number of exits from a room, 

space, floor and building shall be calculated using the occupant load factors in Table 

3.13, Ch. 3 of UAE FLSC 

[Ref. B.1]

Any space or building not listed in Table B.2 above shall conform to the occupant load 

factors noted in Table 3.13, Ch. 3 of UAE FLSC 

[Ref. B.1]

Table B.2  Occupant load factor per person (continued)

Dubai Building Code

Part B: Architecture

B 37

Occupancy/use

Minimum area (m

2

)

Minimum dimension – length 

and width of a room (m) 

Residential living space 

(bedroom, living room)

10.5

3 (See Figure B.23)

Residential studio (including 

bathroom and kitchen space)

21

3

Housekeeper’s/guard rooms 

(single occupancy only exclusive 

of toilet area)

4.5

2.1

Retail shop

2.4

Retail showroom

9

Enclosed office

2.4

Enclosed kitchen 

5.4

1.8

Bathroom and toilets 

Shall meet fixture clearances noted in B.8.1.5

Toilet stalls 

Shall conform to B.8.1.4

Hotel establishment 

Refer to applicable DTCM classification criteria 

 

[Ref. B.19 to Ref. B.36]

Healthcare facilities 

Refer to DHA regulations and guidelines 

[Ref. B.3 to Ref. B.18]

Fire pump rooms

Refer to Table 1.9, Ch. 1 of UAE FLSC 

[Ref. B.1]

 for minimum room 

sizes dependent upon equipment selected and other requirements 

such as proximity to exit stairways.

Emergency command centre

19 

Table B.3  Minimum room sizes

3.0 m

3.0 m

≥ 

10.5 m2

Figure B.23 

Minimum residential living space dimensions

B.5.2 

Minimum room sizes

The net area and clear dimension of a room/space shall be not less than the 

minimum sizes given in Table B.3. Minimum sizes for some other occupancies are 

given in B.9.

Key

A: Room area

Dubai Building Code

Part B: Architecture

B 38

The manoeuvring space between kitchen counters or adjacent to a single-sided 

kitchen counter shall be not less than 1.2 m, as shown in Figure B.24.

B.5.3 

Minimum clear heights

The clear height of a space shall be not less than the minimum values given in 

Table B.4.

The clear heights shall be calculated from FFL to any structural suspended element 

or ceiling soffits, as shown in Figure B.25.

Occupancy

Use

Minimum clear heights (m)

Assembly

Awqat mosque prayer hall

3.8

Jumaa mosque prayer hall

5.0

Prayer rooms 

2.7

Ballrooms, multipurpose assembly halls 

2.7

Business

Offices 

2.5

Retail, mall

Retail shops/stores, showrooms

2.5

Educational 

Schools, nurseries and kindergartens – 

classrooms 

2.7

Healthcare

Refer to DHA regulations and 

guidelines 

[Ref. B.3 to Ref. B.18]

Residential, 

hotel 

Living and bedroom spaces 

2.7

Table B.4  Minimum clear heights

Dubai Building Code

Part B: Architecture

B 39

Occupancy

Use

Minimum clear heights (m)

Industrial

Industrial equipment areas

Minimum headroom for industrial 

equipment access shall conform to 

Table 3.4, Ch. 3 of UAE FLSC 

[Ref. B.1]

.

Common 

areas

Parking – for light vehicles

2.3

Corridors, passageways and elevator lobbies  2.3
Occupiable spaces (other than listed above) 2.3
Washrooms and toilets 

2.3

Storage and utility space 

2.3

Stairways 

2.03 m above the stair treads and  

2.3 m above the stair landings  

(see B.6.4.1.15)

Means of egress

2.3

In not more than 50% of the ceiling 

area, protruding objects may extend 

below the minimum clear ceiling height, 

where a minimum headroom of 2.03 m 

from FFL shall be provided.

Fire pump room

2.5 (see Table 1.9, Ch. 1 of UAE FLSC 

[Ref. B.1]

)

Table B.4  Minimum clear heights (continued)

Dubai Building Code

Part B: Architecture

B 40

B.6  Circulation requirements and openings

B.6.1 

Walking surfaces 

All walking surfaces, including accessible routes, shall 

conform to the requirements of 

C.5

 & 

C.7.2

.

Changes in level in means of egress of more than 13 

mm, but not more than 535 mm, shall be achieved 

either by a ramp conforming to 

C.5.9.1

 or by a stair 

conforming to B.6.4.1.

B.6.2 

Corridors

B.6.2.1 

Minimum clear widths

The clear width of corridors shall be not less than 

the values given in Table B.5. Where a corridor forms 

part of an accessible route, it shall also meet the 

requirements specified in 

C.5

Occupancy/use

Minimum clear corridor width (m)

Assembly, other public use buildings

1.5 for single loaded corridors 
1.8 for double loaded corridors

Residential (common corridor) 

1.5 for single sided residential units 
1.8 for double sided residential units

(See Figure B.26 as example for corridor arrangement 

 

in residential building)

Retail

1.8 

Mall and retail areas > 3,600 m

2

 GA per 

floor (pedestrian way)

6 for double sided units
3 for single sided units

Healthcare 

Refer to Dubai Health Authority’s (DHA) regulation and guidelines 

[Ref. B.3 to Ref. B.18]

 for 

specific requirements and UAE FLSC 

[Ref. B.1]

Educational 

2.1 for single sided classroom
3 for double sided classroom

Business – Offices 

1.5 for single loaded corridors 
1.8 for double loaded corridors

Hotel establishment 

(common corridor)

1.5 for single loaded corridors
1.8 for double loaded corridors

Refer to DTCM classification criteria 

[Ref. B.19 to Ref. B.36]

  

for specific requirements.

Internal corridors inside residential and 

hotel apartment units

1.0  

(See Figure B.26 as example for corridor arrangement in residential building)

Service corridors

1.2

Corridors in all buildings 

Section 5, Ch. 3 of UAE FLSC 

[Ref. B.1]

 mandates minimum clear corridor widths per 

occupancy type. 

Exit passageways 

If applicable, Table 3.8, Ch. 3 of UAE FLSC 

[Ref. B.1]

 mandates minimum clear exit passageway 

widths. 

Table B.5  Minimum clear corridor widths 

NOTE: Retail units under a single roof or not fire separated and having a ground floor GA of more than 3,600 m

2

, irrespective of the number of storeys, 

are treated as a mall in accordance with Ch.1 of the UAE FLSC 

[Ref. B.1]

.

Dubai Building Code

Part B: Architecture

B 41

1.0 m

 

1.8 m 

01

02

01

Figure B.26 

Corridor arrangement in residential building example 

Key

01: Apartment

02: Public corridor

Dubai Building Code

Part B: Architecture

B 42

B.6.2.2 

Fire resistance rating

Exit access corridors shall be 1 h fire resistance rated when required by Table 1.11a, 

Ch. 1 of UAE FLSC 

[Ref. B.1]

Exit passageways shall achieve the fire resistance rating and construction 

requirements of Table 3.8, Ch. 3 of UAE FLSC 

[Ref. B.1]

B.6.2.3 

Kiosks in mall pedestrian ways

Kiosks are allowed along a mall pedestrian way under the following conditions 

prescribed by Table 1.9, Ch. 1 of UAE FLSC 

[Ref. B.1]

.

a)  The minimum corridor width between the kiosks and the adjacent shop or 

construction shall be 3 m as shown in Figure B.27.

b)  The minimum horizontal separation distance between 2 adjacent kiosks shall be 

not less than 6 m. 

c)  The maximum area of a single kiosks or group of kiosks shall be 18 m

2

 collectively, 

or 28 m

2

 in an open mall.

d) 

Kiosks shall conform to the fire safety system provisions and construction 

materials required of Table 1.9 and Section 7.1.40, Ch. 1 of UAE FLSC 

[Ref. B.1]

B.6.3 

Elevator lobbies

Elevator lobby design shall conform to 

Part D

Figure B.27  Kiosk provision within malls

Key

01: Kiosk

02: Adjacent construction

03: Corridor width

6 m

3 m

3 m

01

01

01

02

03

03

02

Dubai Building Code

Part B: Architecture

B 43

B.6.4 

Vertical circulation in buildings 

B.6.4.1 

Stairways

B.6.4.1.1   General

The minimum number of exit stairways, stairway width, stairway separation, 

exit discharge arrangements and fire resistance rating of the staircase shall 

 

be determined in accordance with Ch. 3 of UAE FLSC 

[Ref. B.1]

The architectural requirements of a stairway design in this subsection align with 

or exceed UAE FLSC 

[Ref. B.1]

.

At least one protected exit stairway shall extend to all roofs.

B.6.4.1.2   Exit staircase construction

Exit stairways shall be enclosed in fire resistance rated reinforced concrete (RCC) 

staircase construction when required by Table 3.4, Ch. 3 of UAE FLSC 

[Ref. B.1]

except staircases serving low-rise buildings or low-depth underground buildings 

where 2 h fire resistance rated blockwork construction is permitted.

RCC staircases with separate cores but a common RCC divider are acceptable only 

in low-rise and mid-rise buildings, provided that the whole staircase conforms  

to building construction type and separation distance between exits.

B.6.4.1.3  Stairway width

All stairways shall have a clear width of not less than 1,200 mm. The minimum width 

of an exit stair shall be determined in accordance with Section 4, Ch. 3 of UAE FLSC 

[Ref. B.1]

 depending upon the number of occupants it serves. 

The required width of a stairway shall be measured from wall to the clear available 

width of the step (see Figure B.28). The maximum projections of handrails allowed 

in this required width is 100 mm on each side, at a height of 865 mm to 965 mm  

(see Figure B.28).

Dubai Building Code

Part B: Architecture

B 44

B.6.4.1.4   Stair risers and treads

Stair riser height as measured in Figure B.29 shall be in the range 100 mm 

to 180 mm.

Riser heights shall be as uniform as possible throughout each stair flight between 

landings. Where riser heights are adjusted to meet acceptable stair treads, flights 

 

and arrangements, there shall be no more than 10 mm difference in riser height 

within a single flight.

Stair treads shall have a depth of not less than 280 mm.

The tread slope shall not exceed 21 mm/m (2% slope).

Tread depth shall be as uniform as possible throughout the stair. There shall be 

no more than 10 mm difference in tread depth within a single flight.
Further recommendations on riser height and tread depth provided for regular use 

stairs and external steps are given in B.6.4.1.6.

Figure B.29 

Stair risers

Key

01: Stair risers = A – B

02: Stair risers = A + B

Dubai Building Code

Part B: Architecture

B 45

B.6.4.1.5   Landings

The height between landings shall be not more than 

3,660 mm.
Every stair shall have a landing at the door opening. 

The landing width shall be not less than the required 

stairway width.
A staircase door shall not encroach in its swing into 

more than one half of the landing width  

(see Figure B.30).

The landing width shall not decrease in width along the 

direction of egress travel.
The landing width is not required to exceed 1,200 mm 

in the direction of travel, provided that the stairway has 

a straight run.

The landing slope shall not exceed 21 mm/m 2% slope.

Key

01: Greater than or equal to tread depth

02: Finish wall

03: Intermediate landing

04: Dual guardrail

05: Continuous handrail

06: Top landing

07: Return of handrail to wall required

A: Minimum stairway width

Dubai Building Code

Part B: Architecture

B 46

B.6.4.1.6   Regular use and external stairs

The following requirements and recommendations apply to stairs used for daily 

circulation and external stepping.
a) Building entrance steps, landscaping steps and external circulation shall meet the

requirements given in Table B.6.

b)

For regular use stairs in buildings, where the stairs serve as a primary means of

vertical circulation, conformity to Table B.6 is recommended.

Table B.6 

Stair flight and steps

Stair element

Requirement for stairs

Tread depth 

≥300 mm

Riser height

150 mm to 165 mm (see Figure B.31)

Number of steps 

2 steps min.
14 steps max.

The step edge shall present a slip-resistant surface with a minimum reflectance 

contrast of 30 LRV points against the step surface (see Figure B.32).

It is recommended that a warning surface is provided at the descending edge of each 

stair flight, in accordance with B.6.4.1.14 and as shown in Figure B.32. The warning 

surface shall conform to the requirements in 

Part C

.

Illumination along the whole flight of stairs should be not less than 200 lux.

 

 

 

 

 

 

 

 

Content      ..     1      2      3      4      ..