Dubai Building Code (2021) - page 1

 

  Index      Manuals     Dubai Building Code (2021)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..      1       2         ..

 

 

 

Dubai Building Code (2021) - page 1

 

 



Dubai Building Code

Part A: General

A 2

A.1  Introduction

The objective of the Dubai Building Code (DBC) is to unify building design across 

Dubai, and to create a building code that is easy to use and clearly mandates the 

minimum requirements for:
a)  the health, safety, welfare and convenience of people in and around buildings; 
b)  the health, safety, welfare and convenience of people who might be affected by 

buildings; 

c)  building design to reduce the impact on the surrounding environment; and
d)  the sustainable development of buildings.
The content of the DBC is based on the following inputs:
1)  existing regulations and technical requirements produced by the various 

Authorities and Service Providers;

2)  interviews with Government Authorities, Service Providers, Master Developers, 

Consultants and other stakeholders to understand gaps or inconsistencies 

between existing regulations;

3)  benchmarking to international and regional codes.
The DBC is arranged under themes to integrate all relevant elements of building 

design. 
The regulations stipulated in the DBC are the minimum requirements for building 

design. Nothing in the DBC prevents a building design that achieves higher standards 

than the minimum set out in the DBC.

Dubai Building Code

Part A: General

A 3

A.2 

Definitions

A.2.1 Terms

Addition:

 Increase to a building’s gross area or built-up area, and/or 

height or depth.

Architect:

 Physical or legal person in charge of designing or 

supervising building works, or both, and licensed to practise the 

architecture profession in Dubai in accordance with the applicable 

legislation. 

Authority:

 Any ministry, department, entity, or federal or local 

government institution in Dubai or any department in licensing 

Authorities related to the implementation and the provisions of the 

DBC. 

Building lifecycle:

 Series of stages through which a building passes 

during its lifetime, from initial design, through construction, 

commissioning, handover, 

and operation, to final demolition and 

recycling of 

demolished materials/systems.

Built-up area:

 Total constructed area in a building or structure 

measured from the external walls of the building, inclusive of 

balconies, terraces and other projections, as well as any other 

covered spaces such as covered parking structures, circulation 

corridors, 

loading/unloading bays, basements, service floors, 

indoor 

swimming pools and any other permanent structures on the plot.

Building:

 Structure for the use or occupancy of people or for shelter.

Change of use:

 Alteration to the use of a building to accommodate an 

alternative occupancy to that which it was originally designed.

Civil Engineer:

 Physical or legal person in charge of designing or 

supervising civil engineering works, or both, and licensed to practise 

the engineering profession in Dubai in accordance with the applicable 

legislation.

Consultant:

 Physical or legal person in charge 

of providing consulting advice during design or construction, or both 

and licensed to practise consulting in Dubai in accordance with the 

applicable legislation.

Contractor:

 Physical or legal person in charge of carrying out 

construction works and licensed to practise contracting activities in 

Dubai in accordance with the applicable legislation. 

Developer:

 Person or entity who prepares land for building sites, 

constructs buildings, creates residential subdivisions or private 

enterprises, and rehabilitates existing buildings.

Development:

 General term for the construction, erection or placing 

of a building or structure; the making of an addition or alteration to a 

building or 

structure; a significant change in use or in intensity of 

use 

of any building or structure. 

Development control regulations (DCR):

 Document that shows 

planning regulations (such as height, land use, area, setbacks, 

building lines) for the full development, and each plot in a 

subdivision plan, as issued by the relevant planning Authority or 

master developer. 

Engineer:

 Physical or legal person in charge of designing or 

supervising construction works, or both, and licensed to practise the 

engineering profession in Dubai in accordance with the applicable 

legislation.

Existing building:

 Building that is completed, including commissioning 

and handover. The DBC applies to 

renovation, modification, 

reconstruction, addition to, or 

change of use of an existing building.

Floor area ratio (FAR):

 Ratio of gross floor area (GFA) 

to plot area.

Gross area (GA):

 Floor area within the inside perimeter 

of the exterior 

walls of a building. The measurement excludes shafts and courtyards, 

but includes corridors, stairways, ramps, closets, base of atria (or similar 

voids) and the thickness of interior walls, columns or other features. 

NOTE: This section gives common definitions that apply throughout the DBC. Each Part also has a section for terms specific to that Part.

Dubai Building Code

Part A: General

A 4

Gross  oor area (GFA):

 Measurement used by 

Planning Authorities in 

Dubai to define the floor area ratio (FAR), where FAR is the ratio of 

GFA to plot area. The building GFA is the sum of the GFA of all floors, 

measured to the exterior surface of the external wall thickness and 

from the centrelines of the common walls joining two spaces. The 

measurement excludes external wall features such as corniches, 

brackets, and façade cladding materials. 

Habitable space:

 Space in a building for living, sleeping or eating 

involving occupancy for continuous period of time. Bathrooms, toilet 

rooms, closets, halls, storage or utility spaces and similar areas are not 

habitable spaces. 

Heritage building:

 New or existing building in a heritage area. The 

heritage department of the Authority controls the elevation 

design and façade treatment of buildings in these areas.

Historical building:

 Existing building of historical importance where the 

original character of the building is to be retained.

Masterplan:

 Comprehensive plan to guide the long-

term physical 

development of a specific area based on identified objectives, 

strategies, and timelines 

for implementation. Includes plans for land 

use, community facilities and utilities, transportation of goods and 

people, and energy use and conservation. Zoning ordinances and 

policies are developed for different areas or zoning districts based 

on the masterplan.

Modi ication:

 Fit-out of a space or unit, or change to a 

service system 

or building element.

Net area (NA):

 Actual occupied area, not including unoccupied 

accessory areas such as corridors, stairways, ramps, toilet rooms, 

mechanical rooms and closets. 

Occupiable space:

 Room or enclosed space designed for human 

occupancy in which individuals congregate for amusement, labour, 

educational or similar purposes.

Owner:

 Any person, entity, firm or corporation having 

any legal or 

equitable interest in the property in whose name the plot or building is 

registered as Owner, including persons who have a long-term lease for a 

specified period; the Main or Sub-Developer in relation 

to unsold lands 

and buildings.

Performance-based design:

 Design that follows prescriptive 

design requirements, but an aspect(s) of which is based on an 

alternative solution that is equivalent to or better than the 

prescriptive design requirements.

Plot:

 Area of land that is:

a)

clearly defined (by landmarks, coordinates, distinct

 

number, and the 

lengths of its sides and location);

a) intended for construction under any approved plan

 

or division 

project, or by any other method; and

a) legally authorized to be used for construction or

 

building as one 

unit.

Plot area:

 Total area of a plot between its boundary lines as 

measured on a horizontal plane.

Prescriptive design:

 Design that meets the 

requirements entirely.

Project:

 Construction of a permanent building, or any other civil work 

on a leased property including any 

modifications or installations in 

pre-built facilities.

Reconstruction:

 Modification that is not standalone. It 

affects adjacent 

egress routes or systems that are not part of the reconstructed area, 

such that a larger part of the building might need to be closed down or 

not occupied for a period of time.

Renovation:

 Change to linings/finishes or 

strengthening of 

structure. It does not involve any 

reconfiguration of internal 

spaces. 

Townhouse:

 Multiple villas connected by one or more walls to a series 

of similar villas.

Villa:

 Separate building located on a separate plot 

allocated with all its 

floors for the dwelling of one 

single family and an independent car 

parking space in addition to independent external open space.

Dubai Building Code

Part A: General

A 5

A.3  References

NOTE: This section gives references that apply throughout the DBC. Each Part also 

has a section for references specific to that Part.

Ref. A.1

 UAE MINISTRY OF THE INTERIOR GENERAL COMMAND OF CIVIL 

DEFENCE, 2018. UAE Fire and Life Safety Code of Practice (UAE FLSC). United Arab 

Emirates: Ministry of the Interior General Command of Civil Defence.

Ref. A.2

 GOVERNMENT OF DUBAI, 2017. Dubai universal design code. Dubai: 

Government of Dubai. 

Ref. A.3

 DUBAI HEALTH AUTHORITY, 2012. Regulations (various). Dubai: Dubai 

Health Authority. Available at: 

 

www.dha.gov.ae/en/HealthRegulation/Pages/FacilityRelated.aspx.

Ref. A.4

 DUBAI HEALTH AUTHORITY, 2019. DHA Health facility guidelines – Part A 

to Part F. Dubai: Dubai Health Authority. Available at: 

 

www.dubaitourism.gov.ae/en/services.

Ref. A.5

 DEPARTMENT OF TOURISM AND COMMERCE MARKETING, 2019. DTCM 

Hotel classification criteria for hotels, guest houses and hotel apartments. Dubai: 

DTCM. Available at

classification.dubaitourism.ae

.

Ref. A.6

 DUBAI CIVIL AVIATION AUTHORITY Application for a no-objection 

certificate to construct a building (above and below 300 m) in Aviation Easement 

areas. Dubai: DCAA. Available at:  

www.dcaa.gov.ae/services/building-constructions/construct-building

.

Ref. A.7

 GREAT BRITAIN, 2015. The Construction (Design and Management) 

Regulations. London: The Stationery Office.

Dubai Building Code

Part A: General

A 6

ASCE

American Society of Civil Engineers

BIM

building information modelling 

BS EN

British Standard European Norm

Ch.

chapter 

DTCM

Department of Tourism and Commerce 

Marketing 

DBC

Dubai Building Code 

DCAA

Dubai Civil Aviation Authority 

DCR

Development Control Regulations 

DDA

Dubai Development Authority 

DEWA

Dubai Electricity and Water Authority

DHA

Dubai Health Authority 

DM

Dubai Municipality 

DLTM

Dubai Local Transverse Mercator

DSOA

Dubai Silicon Oasis Authority 

Emicool

Emirates District Cooling LLC

Empower

Emirates Central Cooling Systems Corporation

FAR

floor area ratio

G

ground floor

GA

gross area

GFA

gross floor area

IACAD

Islamic Affairs and Charitable Activities 

Department 

KHDA

Knowledge and Human Development Authority

MEP

mechanical, electrical and plumbing

NA

net area

A.3.1 

Acronyms and abbreviations

A.3.2 

Verbal forms used within the DBC

RTA

Roads and Transport Authority 

SI

International system of units

SIRA

Security Industry Regulatory Agency 

TRA

Telecommunications Regulatory Authority 

Trakhees 

Department of Planning and Development – 

Ports Customs and Freezone Corporation 

UAE FLSC

UAE Fire and Life Safety Code of Practice 

May

The associated text is permitted

Shall

The associated text is mandatory

Should

The associated text is recommended

Dubai Building Code

Part A: General

A 7

A.4  Relationship of DBC to other local and international regulations

A.4.1 Local regulations

The DBC incorporates, unifies and replaces the 

regulations 

related to building design published by Dubai Municipality 

(DM), Dubai Development Authority (DDA), Department of 

Planning and 

Development – Ports Customs and Freezone 

Corporation (Trakhees) and Dubai Silicon Oasis Authority 

(DSOA).

Regulations related to building design by Dubai Electricity and Water 

Authority (DEWA) and Islamic Affairs and Charitable Activities 

Department (IACAD) are incorporated or cross-referenced by the 

DBC.

Regulations related to building design by the Security Industry 

Regulatory Agency (SIRA) are summarized and cross-referenced in 

Part J

.

Federal regulations also remain in place. The DBC follows the Federal 

regulations of Telecommunications 

Regulatory Authority (TRA) and the 

Ministry of Interior Civil Defence. The TRA regulations are given in 

G.11

. The UAE Fire and Life Safety Code (UAE FLSC) 

[Ref. A.1]

 is 

cross-referenced throughout the DBC.

Accessibility requirements of the Dubai Universal Design Code 

[Ref. 

A.2]

 applicable to building design are incorporated in 

Part C

 and replace 

these aspects of the Dubai Universal Design Code. 

The Dubai Health Authority (DHA) regulations 

 

[Ref. A.3 and Ref. A.4]

, along with the relevant Federal 

regulations, 

shall be followed for the design of all healthcare facilities. 

The Department of Tourism and Commerce Marketing (DTCM) sets 

out the requirements to achieve star ratings for hotels, resorts, hotel 

apartments and guest houses 

[Ref. A.5]

. Achieving the minimum 

requirements of the DBC does not guarantee a rating from DTCM. 

DTCM should be consulted at the earliest stage of design.

The Knowledge and Human Development Authority (KHDA) and the 

Ministry of Education both license 

education facilities, but they do not 

provide separate design requirements. Education facilities are 

approved by the main Authorities in accordance with the DBC.

Roads and Transport Authority (RTA) regulations in relation to the 

right of way are referenced by the DBC as appropriate.

Dubai Civil Aviation Authority (DCAA) regulates 

maximum 

building heights within the flight path. 

Regulations related to permitting, procedures, construction and design 

of non-building elements such as infrastructure, transportation 

systems, and the public realm remain, and can be obtained from, the 

relevant Authority. 

Planning development regulations published by Developers or 

Planning Authorities are not replaced by the DBC. The DBC 

contains planning regulations in 

Part B

, but these shall be followed 

only where 

plot-specific planning development regulations are 

unavailable.

A.4.2 International codes and standards

The DBC relies on international codes and standards, mainly BS EN 

and American codes. These codes and standards shall be used in their 

latest edition except where the DBC lists an edition. 

NOTE: As an example, Part F (Structures) mandates 

the 2016 

edition of ASCE/SEI 7. 

An edition is mandated in the DBC for one of two reasons.

a)

The DBC refers to sections, tables and figures

within that version of the international code or standard and 

therefore the cross-references might not apply to later editions. 

b) The edition has been reviewed for its applicability

to Dubai. 

Dubai Building Code

Part A: General

A 8

A.4.3 

Hierarchy of codes and standards

The hierarchy of the adopted codes and standards is 

defined as follows.

a)

The DBC and UAE Fire and Life Safety Code of

Practice (UAE FLSC) 

[Ref. A.1]

 together form the

main regulations for building design in Dubai. The

UAE FLSC is referenced throughout the DBC.

b) The DBC follows the SIRA regulations for

the design of security. These regulations are

summarized and referenced in 

Part J

.

c)

The DBC follows the Federal regulations of TRA

for the design of telecommunications. These

regulations are documented in 

G.11

.

d) The international codes and standards for design,

material and product specification listed under the

heading of “Essential references” in each Part, and

referenced in the relevant sections of each Part, are

also requirements of the DBC.

e)

Documents listed under the heading of “Further

reading” in each Part are provided for information

as useful guides to building design.

Where there is conflict between the DBC and reference 

model codes or standards, the most restrictive/highest 

performance requirements shall be met.

Where there is a conflict between a general 

requirement and a specific requirement of the DBC 

or its referenced codes/standards then the specific 

requirement applies.

A.4.4 

Safe by design

The principle of “safe by design” requires the 

Consultant to address the health and safety of all 

occupants, Contractors and users of the building.  

This includes Contractors, maintenance staff, 

occupants, visitors and demolition teams throughout 

the building lifecycle.
This process is documented in a risk register where 

the Consultant acknowledges the risk, investigates 

mitigation measures and provides a design solution 

which reduces the risk to a practicable level, while also 

taking account of cost, constructability, other project 

goals, etc. 
Safe by design principles are not mandated by the 

first edition of the DBC, but are likely to be enforced 

in future revisions. Consultants should familiarize 

themselves with these principles by reference to the 

Construction Design and Management Regulations 

[Ref. A.7]

.

Dubai Building Code

Part A: General

A 9

A.5  Scope and application of the DBC

A.5.1 

General

The DBC applies to new buildings and changes to existing buildings as described in 

Table A.1, except where an alternative solution is permitted (see A.8).

Change to an 

existing building

Description

Applicable codes

Renovation

Change to linings/finishes or 

strengthening of structure. It does not 

involve any reconfiguration of internal 

spaces. 

DBC and UAE FLSC 

[Ref. A.1]

 apply 

to interior finish changes or building 

envelope changes.

Modification

Fit-out of a space/unit, or change to a 

service system or building element.

DBC and UAE FLSC 

[Ref. A.1]

 apply to 

the fit-out or change.

Reconstruction

Modification that is not stand-alone. 

It affects adjacent egress routes 

or systems that are not part of the 

reconstruction area such that a larger 

part of the building might need to 

be closed down or not occupied for a 

period of time.

DBC and UAE FLSC 

[Ref. A.1]

 apply 

to the reconstruction and any areas of 

the building which are impacted by the 

reconstruction. 

Change of use

Change of use or occupancy of part or 

all of the building.

DBC and UAE FLSC 

[Ref. A.1]

 apply 

to the change of use and any areas of 

the building which are impacted by the 

change of use, e.g. existing exit stairs 

and routes, vertical transport, quantity 

and type of sanitary provisions.

Addition

An increase in the building’s gross area 

or built-up area, and/or height or depth.

DBC and UAE FLSC 

[Ref. A.1]

 apply to 

the addition. 
If the addition relies on the remainder of 

the existing building for escape, vertical 

transport, etc., the existing building 

shall also be assessed against the DBC 

and UAE FLSC 

[Ref. A.1]

Occupancy 

Use

Assembly

Amusement park, theatre, cinema, restaurant, museum, art gallery, place of 

worship, library, exhibition and conference centre, etc.

Business

Office, professional services, government centre, post office, bank, etc.

Educational

University, college, school, kindergarten, nursery, educational institute

Hotel establishment

Hotel, resort, guesthouse, hotel apartment 

Residential

Apartment, studio, student accommodation, labour accommodation, staff 

accommodation
Villas and townhouses

Parking

Open, enclosed, mechanical

Retail

Shopping centre, department store, shop, kiosk, showroom, stores

Mall

Open mall, enclosed mall

Industrial

Factory, workshop

Storage

Warehouse

Table A.1  Existing building and application of the DBC

Table A.2  Occupancies and use types 

The DBC applies to the occupancies and use types described in Table A.2.

Dubai Building Code

Part A: General

A 10

The DBC does not apply to:
a) infrastructure such as road and rail bridges, tunnels, culverts, metro stations,

hydraulic structures, buried and overhead utilities, power stations, antennas and

masts, wind turbines and nuclear facilities;

b) marine structures such as canals, dams, dikes, levies, piers, jetties and wharves;
c)

oil and gas structures such as petrochemical facilities, oil refineries, liquefied

natural gas terminals, oil platforms and tanks;

d) structures such as tents, cranes, storage racks, scaffolding, formwork and

falsework;

e)

structures subject to specific loading conditions such as stadia, grandstands, silos

and chimneys.

The DBC does not apply to historical buildings where the original character of the 

building is to be retained. Buildings considered to be historical shall conform to the 

guidelines of the relevant Authority as appropriate. 
Buildings in heritage areas or considered to be heritage buildings shall follow the 

DBC. The heritage department of the Authority controls the elevation design and 

façade treatment.
Villas and townhouses are addressed in 

Part K.

A.5.2 

Floor area and building height de initions in DBC

A.5.2.1 

Gross  oor area (GFA)

Gross floor area (GFA) is used by Planning Authorities in Dubai to define the floor area ratio (FAR), where FAR 

is the ratio of GFA to plot area. The building GFA is the sum of the GFA of all floors, measured to the exterior 

surface of the external wall 

thickness and from the centrelines of the common walls joining two spaces. The 

measurement excludes external wall features such as corniches, brackets, and façade cladding materials. 

GFA is calculated based on Table A.3. 

GFA might be in development control regulations (DCR). Consultants shall calculate GFA using the DBC 

definition and Table A.1 unless GFA is stated in the DCR.

Dubai Building Code

Part A: General

A 11

Space or area

Included or excluded in GFA

Habitable and occupiable spaces including 

sanitary facilities

Included

Mezzanine floors

Included

Lobbies

Included

Corridors

Included

Stairs

Included

Basements in buildings other than villas

Habitable and occupiable spaces including 

sanitary facilities to be included 

Basements in villas

Excluded

Attic spaces

Attic spaces less than 2.15 m height and used for 

services only to be excluded

Parking

Excluded

Parking lobbies

Excluded

Internal roads

Excluded

Loading areas

Excluded

Mechanical and service rooms

Excluded

Mechanical ducts

Excluded

Elevator shaft at elevator recall floor

Included

Elevator shafts at other floors

Excluded

Elevator machine rooms

Excluded

Mechanical, electrical and plumbing plant floors

Excluded

Shafts

Excluded

Refuse chutes

Excluded

Waste rooms

Excluded

Storage below ground

Excluded

Table A.3 

Areas included in GFA

Space or area

Included or excluded in GFA

Storage on ground and above

Included

Prayer room and ablution area

Excluded

Gym with gross area ≤50% of roof area

Excluded 

Gym with gross area >50% of roof area

The gross area of the gym exceeding 50% is 

included*

Swimming pools (indoor and outdoor) including 

services (showers, toilets, lockers, changing 

rooms, etc.)

Excluded

Arcades (open, non-air conditioned)

Excluded

Base of double height volumes and atria

Included

Void of double height floors and atria

Excluded

Floor voids

Excluded

Terraces

Excluded

Balconies

Excluded

NOTE: * This rule is associated with the roof area but it applies to gyms located anywhere in the 

building.

Dubai Building Code

Part A: General

A 12

A.5.2.2 

Built-up area 

Built-up area is used also by Planning Authorities. It 

is defined as the total constructed area in a building 

or structure measured from the external walls of the 

building, inclusive of balconies, terraces and other 

projections as well as any other covered spaces such 

as covered parking structures, circulation corridors, 

loading/unloading bays, basements, service floors, 

indoor swimming pools and any other permanent 

structures on the plot. Calculation of total built-up area 

shall exclude the following: 
a) shafts, courtyards and yards including mechanical,

electrical and plumbing (MEP) shafts, refuse chutes

and similar;

b) non-covered outdoor landscape and hardscape

surfaces and courtyards;

c) lightweight outdoor shading structures such as

pergolas and standalone canopies.

An example calculation using a sample plan is shown in 

Figure A.1.

Figure A.1  Total built-up area (highlighted areas are included in area definition) 

09

04

05

06

10

12

14

15

01

02

03

07

11

05

16

17

18

08

06

13

Key

01: Gym

02: Lobby

03: Ballroom

04: Prayer room

05: MEP

06: Corridor

07: Staff toilets

08: Staff

09: Meeting room

10: Service corridor

11: Electrical

12: Restaurant

13: Back-of-house

14: Kitchen

15: Service block

16: Pergolas

17: Parking canopy

18: Plot limit

 

 

 

 

 

 

 

 

Content      ..      1       2         ..

 

 

//////////////////////////