Dubai Building Code (2021) - page 2

 

  Index      Manuals     Dubai Building Code (2021)

 

Search            copyright infringement  

 

   

 

   

 

Content      ..      1      2      3      ..

 

 

 

Dubai Building Code (2021) - page 2

 

 



Dubai Building Code

Part A: General

A 13

A.5.2.3 

Gross area and net area

The terms “gross area” (GA) and “net area” (NA) are 

used by the DBC to calculate occupant load in a floor 

or space. They are defined in A.2 and further described 

and illustrated in 

Part B

A.5.2.4 

Building height

Building height is a key variable that is checked by 

the Authorities for compliance with the DBC, DCR/

affection plans, UAE FLSC 

[Ref. A.1]

 and, where 

applicable, DCAA restrictions on building heights 

located in Aviation easement areas due to overhead 

flight paths. 
Each definition of building height is slightly different 

as they are used to regulate different issues. For this 

reason, Consultants shall check building height against 

the DBC, DCR/affection plans, UAE FLSC 

[Ref. A.1]

 

and, where applicable, DCAA regulations 

[Ref. A.6]

.

Dubai Building Code

Part A: General

A 14

A.6  Navigating the DBC

A.6.1 

Division into Parts

The DBC is divided into Parts as described in Figure A.2. 

Each Part is subdivided into sections by topic.
Minimum requirements for sustainability are embedded 

within the relevant Parts of the DBC. Developers and 

Consultants are encouraged to apply the rating system 

adopted by the relevant Authority to assess their 

projects and exceed these minimum requirements. 

Fire safety requirements are given in the relevant 

Parts of the DBC and cross referenced to UAE FLSC 

[Ref. A.1]

. The aim of this cross-referencing is to help 

Consultants navigate and coordinate the requirements 

of the two documents. Where an element of UAE FLSC 

is not applicable in Dubai, or the DBC contains additional 

information not in UAE FLSC, this is indicated in the 

text.

Figure A.2  How to use and navigate the DBC

Part H

Indoor environment

Part E

Building envelope

Part J

Security

Part B

Architecture

Part C

Accessibility

Part K

Villas

Part F

Structure

Part D

Vertical transportation

Part G

Incoming utilities

Dubai Building Code

Part A: General

A 15

A.6.2 

Performance statements

The overarching objectives of the DBC, its intention 

and regulatory scope, are set out in A.1. 
Each Part of the DBC starts with a set of performance 

statements. These set out the broad outcomes that 

the completed building is expected to achieve, and 

are provided to explain the intent of the prescriptive 

design requirements within the Part. If the prescriptive 

design requirements of the Part are followed, then the 

performance statements of the Part are deemed to be 

met and will be accepted by the Authority.

A.6.3 

References

Each Part has a section for essential references and 

further reading. The requirements of the DBC and 

the essential references form the prescriptive design 

requirements of the DBC and will be enforced by the 

Authority. Websites and webpages shall be checked 

regularly for updates.

NOTE: Where websites and webpages have been cited 

throughout the DBC, they are provided for ease of 

reference and are correct at the time of publication. 

Changes to the location of a webpage or website, or its 

contents, cannot be guaranteed.

A.6.4 

Definitions

In addition to the common definitions in A.2, each Part 

has a section for definitions.

A.6.5 

Annexes

Any annex material is included at the end of the Part 

to which it relates. Annex material contains further 

explanatory material.

Dubai Building Code

Part A: General

A 16

A.7  Adoption of DBC

Projects in design or construction that have a final 

approved design from the Authority do not need to 

conform to the DBC.

Projects in design without a final approved design shall 

conform to the DBC. The requirements of the DBC are 

based on regulations enforced prior to its publication 

and in many instances the DBC is less stringent. For 

example, requirements unrelated to health, safety, 

welfare and environment have generally been removed 

from the regulations. Therefore, it is expected that 

there will be benefits to Developers and Owners in 

adopting the DBC.

A.8  Alternative solutions

The DBC is intended to be a prescriptive design code. 

Performance statements are provided at the start of 

each Part to describe the outcomes that the completed 

building is expected to achieve. 
The performance statements form a set of overarching 

regulations that convey the requirements of the  

DBC (see A.6.2). 
The preferred method of meeting the performance 

statements of the DBC is to follow the prescriptive 

design requirements in each Part. 
The inclusion of performance statements sets out the 

intent of the DBC and future-proofs it, supporting 

a possible transition to a more performance-based 

regulatory system in the future.
Alternative solutions which meet the performance 

statements of the DBC are permitted:
a)  for projects that cannot reasonably meet the 

prescribed requirements; and

b)  for changes to existing buildings where the 

requirements of the DBC would result in a 

disproportionate cost to the Owner/Developer.

The Authority will decide if an alternative solution is 

permitted. 
An alternative solution shall meet the intent of 

the performance statements and provide at least 

an equivalent level of performance to all of the 

prescriptive design requirements. 

Alternative solutions shall be applied to a performance-

based design holistically such that a change from 

one Part of the DBC does not reduce the building’s 

performance in other aspects.
Alternative solutions for changes to existing buildings 

shall demonstrate that the existing conditions are 

maintained to the current level of compliance or 

improved to meet the safety levels of the DBC and  

UAE FLSC 

[Ref. A.1]

The Authority will decide whether or not a 

performance-based design is equivalent to the 

prescriptive design requirements. The responsibility 

is on the Consultant to demonstrate that the 

performance-based design is required and that 

it is at least equivalent to the prescriptive design 

requirements.
The DBC lists preferred international codes and 

standards in each Part (see A.4.2). Where permitted 

by the Authority, alternative standards can be used 

provided that the comparable standard meets the 

intent of the DBC. 

Dubai Building Code

Part A: General

A 17

A.9  Maintenance of DBC

A.9.1 

General

The DBC is an interactive document available 

electronically. 
The DBC will typically be maintained and updated on a 

two- to three-year cycle. If necessary, addendums will 

be issued between cycles. It is therefore important that 

Consultants, Contractors and Engineers check back 

regularly to ensure that they are following the latest 

version of the DBC. 

A.9.2 

Latest changes to DBC

This edition is the first edition of the DBC.

Amended content in future editions will be clearly 

indicated. For example, new content will be side lined in 

the first edition in which it is published.

No content of the DBC, in part or whole, shall be 

copied, printed, sold or reproduced in any format.

A.11  Coordinate system

The coordinate system used by the Authority is Dubai 

Local Transverse Mercator (DLTM). The reference 

point for levelling is Port Rashid.

Dubai Building Code

Part A: General

A 18

A.12.1  Dimensions

All dimensions in the figures and diagrams of the 

DBC are given in millimetres without units, unless the 

distance exceeds 1,000 mm, and then it is given in 

metres with units (m). Dimensions that are not stated 

as “maximum” or “minimum” are absolute.
All dimensions are subject to conventional industry 

tolerances, except where the requirement is stated as a 

range with specific minimum and maximum end points.

A.12.2  Units

All quantities shall be in metric units with the units 

defined.

All engineering shall be performed in dynamically 

consistent units. One of the two systems shown in 

Table A.4 should be used. Use of dimensions between 

analysis models, drawings and/or building information 

modelling (BIM) models shall be fully coordinated and 

consistent.

A.12.3  Calculations

Where the required number of elements (e.g. parking 

or sanitary provisions) to be provided is determined by 

calculations of ratios or percentages, and this results in 

remainders or fractions, the next greater whole number 

of such elements shall be provided.

Unit

SI-system symbol 

(preferred units)

System mm-t-s

System mm-kg-ms

Symbol

Conversion from SI 

units

Symbol

Conversion from SI 

units

Length

m

mm

10

3

mm

10

3

Mass

kg

t

10

−3

kg

1

Time

s

s

1

ms

10

3

Temperature

o

C

o

C

1

o

C

1

Energy

J

mJ

10

3

J

1

Acceleration

m/s

2

mm/s

2

10

3

mm/ms

2

10

−3

Area

m

2

mm

2

10

6

mm

2

10

6

Frequency

Hz

Hz

1

ms−

1

10

−3

Velocity

m/s

mm/s

10

3

mm/ms

1

Volume

m

3

mm

3

10

9

mm

3

10

9

Density

kg/m

3

t/mm

3

10

−12

kg/mm

3

10

−9

Stress

N/m

2

N/mm

2

10

−6

kN/mm

2

10

−9

Force

N

N

1

kN

10

−3

Moment

Nm

Nmm

10

3

kNmm

1

Stiffness

N/m

N/mm

10

−3

kN/mm

10

−6

Table A.4  Preferred units 

A.12  Dimensions, units and calculations

Dubai Building Code

Part B: Architecture

B 2

B.1  Performance statements

Performance statement

The performance statement will be met 

by following the requirements of:

 

The building shall be appropriately 

integrated with the surrounding natural 

and built environment.

B.4, B.9 and B.10

The building shall facilitate the safety, 

convenience and welfare of building 

occupants as they move in and around 

the building, including access and 

egress. 

B.4, B.5, B.6, B.9 and B.11

The building shall provide appropriate 

access and safe circulation for vehicles 

within the site and building.

B.7 and B.9

The building shall provide minimum 

communal provisions and facilities for 

the welfare of occupants. 

B.8 and B.9

The building shall be provided with 

adequate and accessible solid waste and 

recycling storage to safeguard people 

from injury or illness caused by infection 

or contamination.

B.8.5 and B.9

Dubai Building Code

Part B: Architecture

B 3

B.2 

Definitions

B.2.1 

Terms

Accessibility: 

Ease of independent approach, entry, 

evacuation and/or use of a building and its services 

and facilities by all of the building’s potential users, 

regardless of disability, age or gender, and with an 

assurance of individual health, safety and welfare.

Accessible: 

Site, building, facility or portion thereof 

that conforms to 

Part C

.

Advertising:

 Any identification or description or 

drawing or any other means to be fitted or erected or 

printed or written or drawn, either directly or indirectly, 

or any building or structure or plot, whose purpose is 

to draw attention to any business, product, service, etc.

Affection plan:

 Plan of the plot or site issued by the 

Authority, showing information that includes (but is 

not limited to) the plot boundaries, plot dimensions, 

plot areas, setbacks and surroundings as well as the 

land uses. Also called site plan.

Amenity space: 

Public or private area within the 

boundaries of a plot or a development site for the 

building occupant’s recreation or convenience (such as 

landscaped areas, patios, swimming pools, play areas, 

prayer rooms, exercise areas and similar uses).

Annex:

 Building or installation, attached to or 

independent from the main building, the use of which 

is secondary or complementary to the function of the 

main building.

Arcade: 

Roofed corridor that leads to any building, 

faces a street or open courtyard, or links more than 

one building. Usually formed through a series of arches 

supported on columns or piers (see Figure B.1).

Figure B.1 

Arcade

Authorized use: 

Plot use or building occupancy 

authorized according to the classification of lands 

in Dubai noted in the official affection plan or 

development regulation.

Balcony: 

Covered or uncovered occupied projection or 

partial projection outside the external walls, attached 

to the building and accessed from the building's 

interior spaces (see Figure B.2).

Assembly: 

Occupancy classification associated with 

the gathering of people for deliberation, worship, 

entertainment, eating, drinking, amusement, awaiting 

transportation, or similar uses.

Atrium: 

Large-volume space created by a floor opening 

or series of floor openings, connecting two or more 

storeys or exceeding 15 m in height from finished floor. 

The space is covered at the top of the opening(s) and 

used for purposes other than an enclosed stairway, 

an elevator hoistway, an escalator opening or a utility 

shaft.

Figure B.2 

Balcony

Basement floor: 

Storey of a building wholly or partly 

below the gate level that is not the first storey above 

gate level. A basement slab soffit level is not higher 

than 1,200 mm above the building gate level.

Dubai Building Code

Part B: Architecture

B 4

Bathroom: 

Room containing a water closet, a 

washbasin, and either a bathtub, a shower, or both. 

Bi-separator:

 Piece of equipment fitted to the end of a 

refuse chute which allows the user to deposit multiple 

waste streams, such as recycling and residual waste, 

into a single refuse chute. 

Boundary wall/fence: 

Free-standing structure 

constructed from approved materials surrounding a 

plot, resting on the ground and rising above ground 

level and used for confinement and/or screening for 

safety or security or division purposes.

Building: 

Structure for the use or occupancy of people 

or for shelter.

Building element: 

Component of a building, which 

might or might not be of fire resistance rated 

construction and is constructed of approved materials. 

Building envelope:

 Physical barrier between the 

exterior and the conditioned environment of a building 

to resist air, water, moisture, heat, cold, light, and noise 

transfer. For an air-conditioned building, the building 

envelope comprises the elements of a building that 

separate conditioned spaces from the exterior. Crown 

extensions to the façade to cover plant screen cladding 

are part of the building envelope. The building envelope 

does not include the physical barrier below ground.

Building height, total:

 Vertical distance measured from 

the approved road edge level at the plot main access to 

the highest roof surface or element.

Building height:

 Vertical distance measured from the 

approved road edge level at the plot main access to the 

mean finished level of the building roof. 

Building occupants:

 Persons using the building. 

Building projection:

 Projection or protrusion that 

extends outside the vertical external wall of the floor 

below, such as balconies.

Building setback:

 Horizontal distance between the 

nearest part of any building or structure on the plot 

above ground and the plot boundary, measured 

perpendicular to the plot boundary.

Built environment: 

External and internal environments 

and any element, component or fitting that is 

commissioned, designed, constructed and managed for 

use by people.

Bulky waste:

 Waste, such as furniture, which is usually 

too large for regular waste collections.

Business: 

Occupancy used for the transaction of 

business other than retail, usually used for office, 

professional or service-type transactions, including 

storage of records and accounts.

Canopy:

 Building projection that provides weather 

protection, identity or decoration and is partially 

or wholly supported by the building to which it is 

attached. 

Carpool vehicle:

 Shared vehicle used by people who 

each have a car but travel together to save cost, to 

reduce driving stress and to promote other socio 

environmental benefits.

Chimney: 

Primarily vertical structure containing one 

or more flues, for the purpose of carrying gaseous 

products of combustion and air from a fuel-burning 

appliance to the outdoor atmosphere.

Chute: 

Vertical shaft or sloping channel provided for 

building utilities and services. 

Circulation: 

Means of passage for pedestrians in and 

around the built environment, including (but not 

limited to) corridors, hallways, courtyards, stairways 

and stair landings.

Clear width: 

Free unobstructed space for access.

Clinic: 

Buildings (or portions thereof) used to provide 

medical care on less than a 24 h basis. 

Corridor: 

Enclosed component that defines and 

provides a path of travel.

Dubai Building Code

Part B: Architecture

B 5

Courtyard:

 Open, uncovered space, unobstructed to 

the sky, bounded on three or more sides by exterior 

building walls or other enclosing devices as shown in 

Figure B.3.

Curb: 

Raised edge on a roadway, concrete floor slab 

 

or around roof plant.

Daylighting:

 Illumination of interior spaces using 

natural light.

Department store:

 Store, exhibition, building, or part 

of a building used for the retail sale of a broad variety 

of items.

Designated preferred parking spaces: 

Parking spaces 

that are closest to the main entrance of a building, 

excluding accessible spaces, or parking spaces closest 

to the pedestrian exit from the parking area.

Figure B.3 

Courtyard

Entrance: 

Access point to a building, portion of a 

building or facility. An entrance includes the approach 

walk, the vertical access leading to the entrance 

platform, the entrance platform itself and the entry 

door(s) or gate(s).

Environmental impact assessment (EIA):

 Process  

of predicting, identifying and evaluating the likely 

impacts (initial and cumulative), both beneficial and 

adverse, of a project on the environment including the 

potential effects of the environment on the project.

Exhibition: 

Space or structure used for the display  

of products or services.

Exit access:

 Portion of a means of egress that leads to 

an exit.

Exit discharge:

 Portion of a means of egress between 

the termination of an exit and a public way.

Exit passageway:

 Exit component that is separated 

from other spaces of a building or structure by fire 

resistance rated construction and opening protectives, 

providing a protected path of egress travel in a 

horizontal direction to exit discharge or public way 

or outside building. Additional uses for the exit 

passageway include stair transfer in upper floors 

 

as well as to reduce travel distance to an exit by having 

an exit passageway lead to a stair of exit discharge. 

(a) all sides bounded courtyard

(b) 3 sides bounded courtyard

Development: 

General term for the construction, 

erection or placing of a building or structure; the 

making of an addition or alteration to a building or 

structure; a significant change in use or in intensity of 

use of any building or structure. 

Development control regulations (DCR):

 Document 

that shows planning regulations (such as height, 

land use, area, setbacks, building lines) for the full 

development, and each plot in a subdivision plan, as 

issued by the relevant planning Authority or  

master Developer.

Door: 

Combination of a door leaf or leaves, frame, 

hardware, and other accessories, positioned in an 

opening in a wall and intended primarily for access  

and egress.

Driveway:

 Access to a required off-street parking  

and loading facility area.

Education: 

Occupancy used for educational purposes, 

including training centres and universities. 

Element:

 Component or space of a building,  

facility or site.

Elevator lobby:

 Landing from which occupants directly 

enter an elevator car(s) and into which occupants 

directly enter upon leaving an elevator car(s).

Enclosed parking:

 Parking occupancy that is partially 

or wholly enclosed on all sides, and that does not 

qualify as open parking.

Dubai Building Code

Part B: Architecture

B 6

Exterior stairway:

 Stairway that is open on at least one 

side, except for required structural columns, beams, 

handrails and guardrails. The adjoining open area can 

be either yards, courtyards or public ways.  

The other sides of the exterior stairway can be closed.

External wall: 

Wall, load bearing or non-load bearing, 

that is used as an enclosing wall for a building and 

might form part of the building envelope.

Facility:

 All or any portion of the buildings, structures, 

site improvements, equipment, roads, walks, 

passageways, parking lots or other property located  

at the site.

Feeding room or lactation room:

 Private space where a 

nursing mother can nurse a child or lactate.

Fixed seating:

 Furniture or fixture designed and 

installed for the use of sitting, and secured in place. 

Includes bench-type seats and seats with or without 

backs or arm rests.

Flight:

 Continuous run of stair treads from one landing 

to another.

Flood or flooding:

 General and temporary condition 

of partial or complete inundation of normally dry land 

from:
a) 

the overflow of inland or tidal waters;

b)  the unusual and rapid accumulation or runoff  

of surface waters from any source.

Floor finish:

 Exposed floor surfaces of buildings 

including coverings applied over a floor or stair, 

including risers.

Floor height:

 Vertical distance from top to top of two 

successive finished floor surfaces. For the topmost 

storey, from the top of the floor finish to the top of the 

ceiling joists or, where there is no ceiling, to the top of 

the roof surface.

Floor or storey: 

Portion of a building located between 

the upper surface of a floor and the upper surface of 

the floor or roof next above.

Fuel dispensing facilities:

 Facility where motor fuels 

are stored and dispensed from fixed equipment into 

the fuel tanks of motor vehicles or marine craft or into 

approved containers, including all equipment used in 

connection therewith.

Gate level: 

 Defined height on the plot boundary at the 

vehicular or pedestrian access point to the plot. It is an 

elevation difference between the road level (existing or 

future) and the level of the plot’s access point.
The gate level of a plot shall be a minimum height 

of +300 mm from the edge of the road or a slope of 

between 2-5% from the edge of the road to the plot’s 

access point.

Glazed element: 

Individual element within a building 

envelope that lets in light, including windows, plastic 

panels, clerestories, skylights, doors that are more than 

one half glass, and glass block walls.

Glazing: 

Glass that is installed as one of the 

components of a wall, floor, ceiling or roofing system.

Gross area (GA):

 Floor area within the inside perimeter 

of the exterior walls of a building. The measurement 

excludes shafts and courtyards, but includes corridors, 

stairways, ramps, closets, base of atria (or similar 

voids) and the thickness of interior walls, columns or 

other features. 

Ground floor:

 First floor in the building above the gate 

level. 

Guard room: 

Room, unit, or residential space on the 

same plot of land as the main building, or located 

within the main building, designated for the occupancy 

of the guard.

Guardrail:

 Vertical protective barrier erected along 

elevated walking surfaces, exposed edges of stairways, 

balconies and similar areas that minimizes the 

possibility of fall from elevated surfaces to lower level.

Habitable space: 

Space in a building for living, sleeping 

or eating involving occupancy for continuous period of 

time. Bathrooms, toilet rooms, closets, halls, storage 

or utility spaces and similar areas are not habitable 

spaces.

Handrail:

 Horizontal or sloping rail intended for 

handhold and grasping by hand for guidance or 

support (see Figure B.4).

Dubai Building Code

Part B: Architecture

B 7

Hardscape:

 Area of a project site, excluding buildings, 

made with hard materials, including roads, car parks, 

patios, courtyards and walkways.

Hazardous waste: 

Waste material that can cause 

substantial harm to humans, properties and/

or the environment due to its inherent hazardous 

characteristics. Hazardous waste takes the form of 

solid, liquid, sludge, gas or any combination thereof. 

Healthcare:

 Occupancy used to provide medical, 

psychiatric, surgical, therapeutic treatment for people.

Helipad: 

Dedicated structural surface used for the 

landing, taking off, taxiing and parking of helicopters.

High-rise building: 

Building height greater than or 

equal to 23 m and up to 90 m, measured in accordance 

with the UAE FLSC 

[Ref. B.1]

. A more detailed 

definition is given in UAE FLSC.

Hospital: 

Building or portion thereof used on a 24 h 

basis for the medical, psychiatric, obstetrical or surgical 

care of four or more inpatients.

Hotel: 

Building or groups of buildings under the 

same management in which there are sleeping 

accommodations for lodging with or without meals for 

people on a transient basis.

Hotel apartments:

 Collection of apartments or studios 

that are rented to guests by the day, the week, the 

month or the year.

Hotel establishment:

 Hotels, guest houses, hotel 

apartments or resorts.

Hotel suite:

 Separate guest unit in a hotel that 

contains one or more bedrooms with a living room and 

other services.

Housekeeper’s room: 

Attached or separate room or 

unit on the same plot of land as the main building, 

designated for the residence of housekeepers or other 

maintenance staff such as gardeners, guards and 

drivers. 

Hybrid vehicle:

 Vehicle using two different forms 

of power, such as an electric motor and an internal 

combustion engine, or an electric motor with a battery 

and fuel cells for energy storage.

Illuminance: 

Amount of light falling onto a surface area.

Industrial/factory/workshop:

 Occupancy in which 

products are manufactured or in which processing, 

assembling, mixing, packaging, finishing, decorating, or 

repair operations are conducted.

01

02

03

04

Figure B.4 

Stair components

Key

01: Handrail

02: Tactile surface

03: Tread

04: Riser

Dubai Building Code

Part B: Architecture

B 8

Intersection: 

Crossing of two or more roads.

Kiosk: 

Temporary or permanent structure of 

lightweight construction occupied as a retail outlet, 

food outlet or service outlet. Kiosks are generally 

located at malls, shopping centres, assembly areas and 

exhibition centres.

Kitchen: 

Place for the preparation of meals and 

beverages. 

Labour accommodation:

 Building used for group 

accommodation for workers of a company or a firm, 

for which the sanitary facilities and other services are 

common.

Landing: 

Floor area at the top of a flight of stairs or 

between two flights of stairs, or a platform or part of a 

floor structure at the end of a ramp or at the entrance 

to an elevator car.

Land use:

 Activities, operations, or purposes that are 

employed in a particular geographic area; the specific 

manner in which a plot of land is utilized. Land use 

is usually regulated through zoning and planning 

regulations.

Level: 

Ground or floor surface, or part of a surface, 

having a slope of not more than 2% at any point and in 

any direction.

Line of sight:

 Imaginary line from the eye to a 

perceived object or view.

Loading area:

 Area used for loading or unloading 

of vehicles, located entirely on private property and 

provided with permanent independent access.

Lobby:

 Entrance or foyer to a space or building which 

acts as a transition area.

Local road: 

A roadway with the primary function 

of providing access to adjacent properties and to 

roadways of a higher functional classification.

Local species:

 Local plants and plants adapted to the 

local environment.

Low-rise building:

 Building height less than or up to  

15 m, measured in accordance with the UAE FLSC 

 

[Ref. B.1]

. A more detailed definition is given in 

 

UAE FLSC. 

Low-depth underground building: 

Building up to 7 m 

below or having up to two basements below the level of 

exit discharge, measured in accordance with the UAE 

FLSC 

[Ref. B.1]

. A more detailed definition is given in 

UAE FLSC. 

Main building:

 Building used for the main or prime 

functional use within the plot.

Mall:

 Pedestrian area within a building that serves as 

access for multiple tenants with levels that are open to 

each other. A covered mall has an enclosed or roofed 

common pedestrian way. An open mall has an unroofed 

common pedestrian way. 

Massing:

 Overall mass or size of a building or project, 

its physical volume or magnitude.

Masterplan: 

Comprehensive plan to guide the long-

term physical development of a specific area based 

on identified objectives, strategies, and timelines 

for implementation. Includes plans for land use, 

community facilities and utilities, transportation of 

goods and people, and energy use and conservation. 

Zoning ordinances and policies are developed for 

different areas or zoning districts based on the 

masterplan.

Means of egress: 

Continuous and unobstructed route 

from any point in a building or structure to a public 

way.

Mechanical parking:

 Parking areas employing parking 

machines, lifts, elevators or other mechanical devices 

for vehicles moving from and to street level. Public 

occupancy is prohibited above street level.

Mezzanine floor:

 Intermediate level or levels between 

the floor and ceiling of any storey equal to or less than 

one-third of the floor it is contained in. A partial floor 

greater than one-third of the floor it is contained in is a 

floor, not a mezzanine. 

Mid-rise building:

 Building height greater than 15 m 

but less than 23 m, measured in accordance with the 

UAE FLSC 

[Ref. B.1]

. A more detailed definition is 

given in UAE FLSC. 

Mixed use building:

 Building or structure containing 

two or more occupancies.

Dubai Building Code

Part B: Architecture

B 9

Mosque, Awqat mosque:

 Mosque building dedicated 

for the daily five prayers, usually located in the 

surrounding area of residential neighbourhoods.

Mosque, Eid Musalla:

 Non-roofed open Musalla used 

for Eid prayer congregation.

Mosque, Jumaa mosque:

 Mosque building dedicated 

for the daily five prayers and the Friday prayer 

attended by a large number of worshippers.

Neighbour: 

Any adjacent plot excluding roads and 

sikkas.

Net area (NA):

 Actual occupied area, not including 

unoccupied accessory areas such as corridors, 

stairways, ramps, toilet rooms, mechanical rooms and 

closets.

Net floor height:

 Net distance between the finished 

floor level (FFL) of a floor and the exposed surface of 

the floor celling. 

Nosing:

 Projecting front edge of a stair tread or 

landing that can be rounded, chamfered or otherwise 

shaped.

Occupancy:

 Purpose for which a building or portion 

thereof is used or intended to be used.

Occupant load:

 Total number of persons that might 

occupy a building or portion thereof. 

Occupiable space:

 Room or enclosed space designed 

for human occupancy in which individuals congregate 

for amusement, labour, educational or similar purposes.

Office:

 Building or space within a building in which 

business, clerical, or professional activities are 

conducted. 

Open parking:

 Parking occupancy where each parking  

level has permanent wall openings for natural 

ventilation purposes. The exterior sides of the 

structure have uniformly distributed openings on two 

or more sides. The area of such openings in external 

walls on a level is not less than 20% of the total 

perimeter wall area of each level. The total width of 

all of the openings considered to be providing natural 

ventilation is not less than 40% of the perimeter of the 

level.

Open space: 

Portion of a plot or a building level that 

is set aside for public or private use and that is not 

occupied by rooms or equipment. The space may 

be used for passive or active recreation or may be 

reserved to protect or buffer natural areas.

Ornamental elements: 

Elements that are added to the 

building for purpose of beautification or for expressing 

a certain message or a symbol.

Pantry: 

Place for food preparation process or storage.

Parking:

 Building, structure, or portion thereof used for 

the parking, storage, or both, of motor vehicles.

Parking bay:

 Area occupied by a single vehicle 

depending on the position in which the vehicle is 

parked.

Parapet wall:

 Part of a wall entirely above the roof line.

Paved:

 Use of blacktop, asphalt, concrete or other 

similar substance to create a smooth surface, including 

bituminous penetration, but not the use of dirt, clay, 

slag or stone.

People of determination: 

People with specific needs 

or disabilities, who are suffering from a temporary or 

permanent, full or partial deficiency or infirmity in their 

physical, sensory, mental, communication, educational 

or psychological abilities.

Pergola:

 Shading device using solid material normally 

used for ornamentation or for shading (see Figure B.5).

01

Figure B.5 

Pergola

Key

01: Pergola

Dubai Building Code

Part B: Architecture

B 10

Planning regulations:

 Control by planning Authorities 

for the use of land and buildings, the height and 

massing of buildings, the density of population, and 

the relation of a plot’s building coverage to open space, 

the size and location of yards and setbacks, and the 

provision of any ancillary facilities such as parking.

Plot: 

Area of land that is:

a) 

clearly defined (by landmarks, coordinates, distinct 

number, and the lengths of its sides and location);

a)  intended for construction under any approved plan 

or division project, or by any other method; and 

a)  legally authorized to be used for construction or 

building as one unit.

Plot area:

 Total area of a plot between its boundary 

lines as measured on a horizontal plane.

Plot boundary: 

Boundary dividing one plot from 

another, or from a street or any public place.

Plot coverage:

 Horizontal area occupied by all main 

and annex buildings on the same plot, calculated from 

the external surfaces of external walls or useful roofed 

balconies in the ground or upper floors, whichever have 

more floor projections.

Podium (tower base): 

Lower group of floors of a tower 

which might or might not include the ground floor, and 

have different planning requirements from the typical 

floors of the tower.

Post-consumer recycled content:

 Waste material 

generated by households or any other public or private 

facilities in their role as end-users of the product, 

which can no longer be used for its original intended 

purpose.

Prayer room: 

Dedicated room or space in buildings 

used to perform Islamic prayers which might or might 

not be used for group prayers. 

Pre-consumer recycled content:

 Material diverted from 

the waste stream during the manufacturing process. 

Reutilization of materials (i.e. rework, regrind or scrap 

generated in a process and capable of being reclaimed 

within the same process that generated it) is excluded.

Project: 

Construction of a permanent building, or any 

other civil work on a leased property including any 

modifications or installations in pre-built facilities.

Public use:

 Availability of interior or exterior rooms, 

spaces or elements for use by the public. Public use can 

be provided at a building or facility that is privately or 

publicly owned.

Public way:

 Street, alley, or other plot of land open 

to the outside air, leading to a street, that has 

been deeded, dedicated or otherwise permanently 

appropriated for public use, and has a clear width and 

height of not less than 3 m.

Ramp:

 Inclined solid flat plane that is steeper than 5% 

from the horizontal.

Recovery:

 Processing waste to serve a useful purpose 

by replacing other materials which would otherwise 

have been used to fulfil that function. Examples include 

using waste to generate energy, or converting organic 

waste into compost.

Recycling:

 Processing used materials into new products 

in order to prolong the life of useful material, reduce 

the consumption of fresh raw materials, reduce energy 

usage, and reduce air and water pollution by reducing 

the need for “conventional” waste disposal.

Reflectance: 

Measure of light reflected in a given 

direction by a surface and which is expressed in a unit 

term from 0 to 100 scale, respectively, that represents 

a grey scale progression from the notional extremes of 

total light absorption (black) to total light reflection 

(white).

Refuse chute:

 Passage, commonly used in high-rise 

buildings, through which waste is carried by means of 

gravity to a waste container at the lower end. 

Regulations:

 Rules and statutes set by permitting or 

other governmental Authorities.

Residential: 

Occupancy that provides sleeping 

accommodation with independent cooking and 

bathroom facilities where people live on a permanent 

basis.

Dubai Building Code

Part B: Architecture

B 11

Residential unit:

 Single unit providing complete, 

independent living facilities for one or more persons, 

including permanent provisions for living, sleeping, 

eating, cooking and sanitation. An apartment can be a 

type of residential unit.

Retail: 

Occupancy used for the stocking, display and 

sale of goods, wares or merchandise.

Reuse:

 Activity that lengthens the life of an item, 

typically consisting of returning the item to active use 

in the same or related capacity.

Right of way (ROW):

 Strip of land occupied or intended 

to be occupied by a road, sidewalk, crosswalk, railroad, 

electric transmission line, oil or gas pipeline, water line, 

sanitary storm sewer, and other similar uses; the right 

of one to pass over the property of another.

Riser: 

Near-vertical element in a set of stairs, forming 

the space between one step and the next (see Figure 

B.4).

Road or street: 

Public or private road allocated for 

vehicles or pedestrian use or both, except for sikka as 

defined in land use classification and regulations in 

Dubai.

Roof: 

Floor or part of, located at the top level of the 

building and usually used for machinery and services 

equipment and/or providing building amenities and 

open spaces.

Roof deck:

 Flat or sloped surface not including its 

supporting members or vertical supports.

Self-closing (of a door or other opening protective 

device): 

Equipped with a device that enables closure 

from any position, and against any latch fitted, after 

having been opened.

Service corridor:

 Fully enclosed passage used for 

transporting of goods and services.

Service entrance:

 Entrance intended primarily for 

delivery of goods or services.

Shading device: 

Projecting fixture that extends outside 

the external wall of any building, or a cover (such as 

a louver), to protect any door or window from rain or 

solar effect.

Shaft:

 Enclosed unoccupied space extending through 

one or more stories of a building, connecting vertical 

openings in successive floors, or floors and roof.

Showroom:

 Space allocated for conducting a trading 

business, such as displaying commodities for purpose 

of wholesale or retail sale.

Sidewalk:

 Hard-surfaced walk or raised path along and 

parallel to the side of the street for pedestrians.

Signage:

 Displayed verbal, symbolic and pictorial 

information.

Sikka:

 Public or private path separating two adjacent 

plots or a group of adjacent plots, that can be used by 

pedestrians as a primary or secondary access to any 

plot.

Site:

 Plot of land bounded by a plot line or a designated 

portion of a public right-of-way. A site can be a single 

plot or multiple plots together.

Skylight or overhead glazing:

 Glass or other 

transparent or translucent glazing material installed at 

a slope of 15° or more from vertical.

Solar reflectance index (SRI):

 Index that combines 

reflectivity and emissivity, measuring a material’s 

ability to reject solar heat. SRI is defined such that a 

standard black (reflectance 0.05 and emittance 0.90) is 

0 and a standard white (reflectance 0.80 and emittance 

0.90) is 100. Materials with higher SRI absorb less heat 

and can reduce heat island effect.

Space:

 Identifiable area including room, toilet, hall, 

assembly area, entrance, storage room, alcove, 

courtyard or lobby.

Staff accommodation:

 Building or part thereof in 

which sleeping units are provided and/or rented, and 

with private toilets and shared cooking facilities, for 

joint occupancy by staff members affiliated with a 

university, hospital, school or similar institutions. 

Stage: 

Raised area within a building used for the 

presentation of music, plays or other entertainment; 

the head table for special guests; the raised area for 

lecturers and speakers; boxing and wrestling rings; 

theatre stages; and similar purposes.

Dubai Building Code

Part B: Architecture

B 12

Stair: 

Change in elevation, consisting of one or more 

risers.

Staircase: 

Space inside the building within which the 

stairs are erected.

Stairway:

 One or more flights of stairs, either 

exterior or interior, with necessary landings and 

platforms connecting them to form a continuous and 

uninterrupted passage from one level to another.

Structure: 

Constructed, erected material or 

combination of materials which requires being located 

on the ground or attached to something located on the 

ground.

Student accommodation:

 Building or part thereof 

in which sleeping units are provided for occupancy 

by university, school or other educational institute’s 

students and which is regulated by such institution.

Studio:

 Independent residential unit with combined 

living room and bedroom and space provision for food 

preparation and sanitation.

Super high-rise building:

 Building height greater than 

90 m, measured in accordance with the UAE FLSC 

[Ref. B.1]

. A more detailed definition is given in 

 

UAE FLSC. 

Swimming pool: 

Constructed pool for swimming, 

bathing or wading whether above or below the ground 

surface regardless of depth or water surface area.

Tandem parking:

 Two or more parking bays with one of 

the spaces placed behind the other.

Terrace: 

Covered or uncovered platform or roof, 

protected by a guardrail or parapet wall and supported 

by the structure of the floor below.

Toilet stall: 

Cubicle within a public toilet constructed 

with demountable partitions or walls surrounding a 

water closet. 

Tread: 

Stepping space in a stair flight to set the foot 

(see Figure B.4). 

Vehicle access: 

Roadway, usually paved, intended to 

provide ingress and egress of vehicular traffic from a 

public right-of-way to a building entrance or parking 

area.

Vehicle barrier: 

Component or system of components, 

near open sides of a parking floor or ramp or building 

walls that act as restraints for vehicles.

Warehouse:

 Occupancy used primarily for the storage 

or sheltering of goods, merchandise, products, or 

vehicles. 

Waste: 

Unwanted or unusable materials which are 

discarded after their primary use.

Waste room:

 Room dedicated for the purpose of 

holding, prior to disposal, waste generated in the 

building. This room can be located within the plot limits 

or within building enclosure, subject to the approval of 

Authorities. 

Waste segregation:

 Separation or sorting of waste 

materials into their respective fractions, such as the 

separation of recyclables.

Water closet:

 Toilet bowl and its attached accessories.

Wayfinding: 

System of providing appropriate 

information to assist a person to pass through the built 

environment towards a specific destination. Wayfinding 

includes orienting oneself, knowing one’s destination, 

following the best route, recognizing one’s destination 

and finding one’s way back out. 

Wind towers: 

Shelter with 50% of its area open to the 

sky usually constructed to enhance the architectural 

beauty of a building or to suit a certain climate need.

Dubai Building Code

Part B: Architecture

B 13

B.2.2 

Acronyms and abbreviations

Ch.

Chapter

DCR

Development Control Regulations

DBC

Dubai Building Code

DCAA

Dubai Civil Aviation Authority

DHA

Dubai Health Authority

DHCA

Dubai Healthcare City Authority

DCD

Dubai Civil Defence

DEWA

Dubai Electricity and Water Authority

DM

Dubai Municipality

DM PH&SD

Dubai Municipality, health and safety 

department

DTCM

Department of Tourism and Commerce 

Marketing

EIA

environment impact assessment

EIAR

environment impact assessment report

EIAS

environment impact assessment summary

EMC

electromagnetic compatibility 

FFL

finished floor level

FGI

Facility Guidelines Institute 

G

ground floor

GA

gross area

IBC

International Building Code

LPG

liquefied petroleum gas 

MEP

mechanical, electrical and plumbing

NA

net area

RCC

reinforced concrete 

RMU

ring main unit

RTA

Roads and Transport Authority

SRI

solar reflectance index

TIA

traffic impact assessment

TIS

traffic impact study

UAE FLSC

United Arab Emirates Fire and Life Safety Code 

of Practice

Dubai Building Code

Part B: Architecture

B 14

BS EN 14010:2003+A1:2009, Safety of machinery 

– Equipment for power driven parking of motor 

vehicles – Safety and EMC requirements for design, 

manufacturing, erection and commissioning stages
DIN 30722-1, Roller contact tipper vehicles, roller 

containers – Part 1:Roller contact tipper vehicles up to 

26 t, roller containers type 1570 made from steel
DIN 30722-2, Roller contact tipper vehicles, roller 

containers – Part 2: Roller contact tipper vehicles up to 

32 t, roller containers type 1570 made from steel.
DIN 30722-3, Roller contact tipper vehicles, roller 

containers – Part 3: Roller contact tipper vehicles up to 

12 t, roller containers type 900 made from steel
ISO 14021, Environmental labels and declarations 

– Self-declared environmental claims (Type II 

environmental labelling)
PD ISO/TS 22002-2, Prerequisite programmes on 

food safety – Catering

Ref. B.1

 UAE MINISTRY OF INTERIOR GENERAL 

COMMAND OF CIVIL DEFENCE, 2018. UAE Fire and 

Life Safety Code of Practice (UAE FLSC). United Arab 

Emirates: Ministry of Interior General Command of 

Civil Defence.

Ref. B.2

 ROADS AND TRANSPORT AUTHORITY, 

2017. RTA Railway Protection Code for the Emirate of 

Dubai, Seventh Edition. Dubai: Roads and Transport 

Authority.

Ref. B.3

 DUBAI HEALTH AUTHORITY, 2012. Hospital 

regulation. Dubai: Dubai Health Authority. 

Ref. B.4

 DUBAI HEALTH AUTHORITY, 2012. 

Standards for day surgery centers. Dubai: Dubai  

Health Authority.

Ref. B.5

 DUBAI HEALTH AUTHORITY, 2012. 

Outpatient care facilities regulation. Dubai: Dubai 

Health Authority. 

Ref. B.6

 DUBAI HEALTH AUTHORITY, 2012. Clinical 

laboratory regulation. Dubai: Dubai Health Authority.

Ref. B.7

 DUBAI HEALTH AUTHORITY, 2012. 

Diagnostic imaging services regulation. Dubai: Dubai 

Health Authority.

Ref. B.8

 DUBAI HEALTH AUTHORITY, 2013. Dental 

laboratory regulation. Dubai: Dubai Health Authority.

Ref. B.9

 DUBAI HEALTH AUTHORITY, 2014. School 

clinic regulation. Dubai: Dubai Health Authority.

Ref. B.10

 DUBAI HEALTH AUTHORITY, 2016. 

Regulation for oncology services. Dubai: Dubai Health 

Authority.

Ref. B.11

 DUBAI HEALTH AUTHORITY, 2016. Optical 

center and optometry services. Dubai: Dubai Health 

Authority.

B.3.1 

Essential references

ASCE/SEI 7-16, Minimum design loads and associated 

criteria for buildings and other structures

ASTM F1346-91, Standard performance specification 

for safety covers and labelling requirements for all 

covers for swimming pools, spas and hot tubs

BS 1703, Refuse chutes and hoppers – Specification

BS EN 840-1, Mobile waste and recycling containers 

– Containers with 2 wheels with a capacity up to 400 l 

for comb listing devices – Dimensions and design
BS EN 840-2, Mobile waste and recycling containers – 

Containers with 4 wheels with a capacity up to 1,300 l 

with flat lid(s), for trunnion and/or comb lifting devices 

– Dimensions and design
BS EN 840-3, Mobile waste and recycling containers – 

Containers with 4 wheels with a capacity up to  

1,300 l with dome lid(s), for trunnion and/or comb 

lifting devices – Dimensions and design
BS EN 840-4, Mobile waste and recycling containers – 

Containers with 4 wheels with a capacity up to  

1,700 l with flat lid(s), for wide trunnion or BG- and/or 

wide comb lifting devices – Dimensions and design
BS EN 12574-1, Stationary waste containers – 

Containers with a capacity up to 10,000 l with flat or 

dome lid(s), for trunnion, double trunnion or pocket 

lifting devices – Dimensions and design

B.3  References

 

 

 

 

 

 

 

Content      ..      1      2      3      ..