Iveco EuroCargo (12 to 26 t). Manual - part 59

 

  Index      Iveco     Iveco EuroCargo (12 to 26 t) - service repair manual 2003 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  57  58  59  60   ..

 

 

Iveco EuroCargo (12 to 26 t). Manual - part 59

 

 

E

URO

C

ARGO

T

ECTOR

12-26 t

GEARBOX 2870.9

79

Base - February 2003

Gearbox
2870.9

Page

DESCRIPTION

81

. . . . . . . . . . . . . . . . . . . . . . . . . .

SPECIFICATIONS AND DATA

82

. . . . . . . . . . . . .

TIGHTENING TORQUES

85

. . . . . . . . . . . . . . . . .

TOOLS

86

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

GEARBOX 2870.9

DISENGAGEMENT/RE-ENGAGEMENT

91

. . . .

-

Disengagement

91

. . . . . . . . . . . . . . . . . . . . . . . .

-

Re-engagement

91

. . . . . . . . . . . . . . . . . . . . . . . .

GEARBOX DISASSEMBLY

93

. . . . . . . . . . . . . . . . .

-

Checks

97

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

GEARBOX ASSEMBLY

98

. . . . . . . . . . . . . . . . . . . .

-

Bearings pre-load adjustment for secondary shaft

98

-

Idle-Reverse Gear switch adjustment

104

. . . . . . . .

PRIMARY SHAFT DISASSEMBLY

105

. . . . . . . . . . . .

PRIMARY SHAFT ASSEMBLY

107

. . . . . . . . . . . . . . .

MOTION INLET SHAFT DISASSEMBLY

107

. . . . . .

MOTION INLET SHAFT ASSEMBLY

108

. . . . . . . . .

-

Motion inlet shaft bearing adjustment

108

. . . . . . .

SECONDARY SHAFT DISASSEMBLY

108

. . . . . . . .

SECONDARY SHAFT ASSEMBLY

108

. . . . . . . . . . .

INTERNAL DRIVE SHAFT DISASSEMBLY

108

. . . . .

INTERNAL DRIVE SHAFT ASSEMBLY

109

. . . . . . . .

EXTERNAL DRIVE CASE DISASSEMBLY

109

. . . . . .

EXTERNAL DRIVE CASE ASSEMBLY

110

. . . . . . . . .

EPICYCLIC REDUCTION GEAR ASSEMBLY

113

. . .

-

Operating diagrams about pneumatic epicyclic
reduction gear drive circuit

113

. . . . . . . . . . . . . . .

DISASSEMBLY

115

. . . . . . . . . . . . . . . . . . . . . . . . . . .

-

Checks

117

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

ASSEMBLY

118

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

E

URO

C

ARGO

T

ECTOR

12-26 t

GEARBOX 2870.9

81

Base - February 2003

DESCRIPTION

The 2870.9 gearshift is of the mechanic type, with nine speeds and engagement of the 1

st

, 4

th

, 5

th

, 8

th

and 9

th

speeds by means of

free-ring synchronizing rings, whereas the 2

nd

, 3

rd

, 6

th

and 7

th

speeds are engaged by means of a double-cone synchronizing gear.

The reverse gear engagement is with quick-engagement sliding sleeve.

It is composed of a front section, comprising five ratios and reverse gear, and of a rear section comprising two ratios obtained through
epicyclic reduction gear.
The gear switch is carried out mechanically through double-”H” control; the epicyclic reduction gear engagement is carried out
mechanically with pneumatic switching.
The gearbox is equipped with an oil pump for its lubrication.

Figure 1

2870.9 GEARBOX LONGITUDINAL SECTION AND REVERSE GEAR SHAFT SECTION

78684

SEC A-A

E

URO

C

ARGO

T

ECTOR

12-26 t

82

GEARBOX 2870.9

Base - February 2003

GEARBOX

2870.9

Type

Mechanical

Gears

9 forward gears and reverse gear

Gears engagement

control

Mechanical

Power takeoff

Upon request

Gears engagement:

1

st

2

nd

3

rd

4

th

5

th

Free-ring synchronizer

Double-cone synchronizer

Free-ring synchronizer

4

th

5

th

6

th

7

th

h

h

Free-ring synchronizer

Double-cone synchronizer

8

th

9

th

Reverse gear

Free-ring synchronizer

Quick-connection type

eve se gea

Gears anti-

disengagement

Quick connection type

Sliding sleeve holding through rollers and springs.

Gears

With helical teeth

Gear ratio

First

1 : 13.200

Second

1 : 9.036

Third

1 : 6.473

Fourth

1 : 4.691

Fifth

1 : 3.548

Sixth

1 : 2.547

Seventh

1 : 1.824

Eighth

1 : 1.322

Ninth

1 : 1.000

Reverse gear

1 : 11.650

E

URO

C

ARGO

T

ECTOR

12-26 t

GEARBOX 2870.9

83

Base - February 2003

Oil type

Amount

TUTELA ZC 90

4.5 Kg. (5lt)

Fixed hubs assem-

bly temperature

100

o

C

÷ 130

o

C

Secondary shaft

bearings

With tapered rollers

Secondary shaft

bearings

pre-loading

adjustment

Through rings

Secondary shaft

pre-loading

adjustment rings

thickness

2.5 - 2.7 - 2.8 - 2.9 - 3.1 - 3.2
3.3 - 3.4 - 3.5 - 3.6 - 3.7 - 3.8

Supplied in a kit

Secondary shaft

bearings assembly

temperature

85

o

C

Motion entry shaft

bearings adjusting

rings thicknesses

2.40 - 2.45 - 2.50 - 2.55 - 2.60 -

2.65 - 2.70 - 2.75 - 2.80

 

 

 

 

 

 

 

Content   ..  57  58  59  60   ..