City of Calexico
2022-23 Budget
Capital Projects
Development Impact Fees
Funds #430-436
Purpose of Fund
Development Impact Fees finance the cost of public improvements, public services, and community amenities connected to new
development pursuant to the State Mitigation Fee Act (Government Code section 66000) and the Calexico Municipal Code (Title 3 Chapter
32). Expenditures are limited to capital projects and cannot be used to fund operations or ongoing maintenance.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$ 3,383,749
$ 3,184,710
$ 3,022,669
$ 2,969,569
Annual Activity
Revenues
Development Impact Fees
#430 - Libraries
7,045
9,519
3,200
-
#431 - Parks/Recreation
22,281
20,416
12,400
-
#432 - Parking In Lieu
4,809
263
-
-
#433 - General Government
8,049
3,548
3,000
-
#434 - Traffic
46,923
17,286
12,200
-
#435 - Police
12,698
9,706
7,400
-
#436 - Fire
8,725
9,845
7,700
-
110,530
70,583
45,900
-
Expenditures
-
Capital Outlay
#990 Library Facilities:
#430 - Libraries
-
121,894
-
130,000
Parking Lot resurface,
Computers, Equipment
#431 - Parks/Recreation
261,287
3,404
85,000
340,000
#978 Cordova Park
#432 - Parking In Lieu
-
-
-
265,000
#91-918 Downtown Lots
#433 - General Government
273
64,250
14,000
250,000
#994 City Hall & ADA
#434 - Traffic
-
43,076
-
-
#91-901 Message Boards
#434 - Traffic
-
-
-
500,000
#968 Cole Road
#434 - Traffic
-
-
-
1,303,082
#980 East Facilities Plan
#435 - Police
48,009
-
-
-
#436 - Fire
-
-
-
-
309,569
232,624
99,000
2,788,082
-
-
-
Net Annual Activity
(199,039)
(162,041)
(53,100)
(2,788,082)
Ending Fund Balance
#430 - Libraries
243,004
130,628
133,828
3,828
#431 - Parks/Recreation
408,745
425,757
353,157
13,157
#432 - Parking In Lieu
264,793
265,056
265,056
56
#433 - General Government
340,713
280,010
269,010
19,010
#434 - Traffic
1,830,662
1,804,872
1,817,072
13,990
#435 - Police
239,403
249,109
256,509
256,509
#436 - Fire
(142,610)
(132,764)
(125,064)
(125,064)
The Fire Fund deficit
$ 3,184,710
$ 3,022,669
$ 2,969,569
$
181,487
is due to purchase
Balance Sheet
-
-
-
-
of Fire apparatus.
Cash
$
3,425,858
$ 3,161,683
The Fire deficit
Due from (to) other funds
(142,610)
$
(132,764)
is expected to be
Accounts Payable
(98,538)
$
(6,250)
cleared through future
$
3,184,710
$ 3,022,669
fee collections.
Proposed Budget June 14, 2022
159
City of Calexico
2022-23 Budget
Capital Projects
Development Projects
Funds #452-64
Purpose of Fund
The City has a series of eight funds established to track revenues collected related to specific development agreements. Funds are
committed to financing plans and improvements at the development sites. Several projects are on hold pending further development
activity.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$ 2,936,863
$ 2,973,732
$ 2,976,684
$ 2,976,684
Annual Activity
Revenues
Development Projects
#452 - Cole Road
28,580
1,562
-
-
#453 - NW Ind EDA Project
6,112
334
-
-
#454 - NW Area - Jasper
17
1
-
-
#455 - NW Area - Yourman
159
9
-
-
#456 - NW Area - W Cole
2,144
117
-
-
#457 - E Area Fac Plan
16,995
929
-
-
54,006
2,952
-
-
Expenditures
Project #
#452 - Cole Road
16,800
-
-
1,573,683
#968
#453 - NW Ind EDA Project
338
-
-
336,000
#955
#454 - NW Area - Jasper
-
-
-
-
#970
#455 - NW Area - Yourman
-
-
-
-
#971
#456 - NW Area - W Cole
-
-
-
118,000
#976
#457 - E Area Fac Plan
-
-
-
935,773
#980
#460/1 - Corsair, LLC
-
-
-
-
#989
17,138
-
-
2,963,457
Net Annual Activity
36,868
2,952
-
(2,963,457)
Ending Fund Balance
$ 2,973,732
$ 2,976,684
$ 2,976,684
$
13,227
Balance Sheet
Cash
$
2,973,732
$
2,976,684
Receivables
-
-
Due To Other Funds
-
-
Available Fund Balance
$
2,973,732
$
2,976,684
-
-
Fund Balance by Project
#452 - Cole Road
$
1,573,683
$
1,575,246
$
1,575,246
$
1,562
#453 - NW Ind EDA Project
336,525
336,859
336,859
859
#454 - NW Area - Jasper
919
920
920
920
#455 - NW Area - Yourman
8,770
8,779
8,779
8,779
#456 - NW Area - W Cole
118,061
118,178
118,178
178
#457 - E Area Facilities
935,773
936,702
936,702.21
929
$
2,973,732
$
2,976,684
$
2,976,684
$
13,227
-
-
-
-
Proposed Budget June 14, 2022
160
City of Calexico
2022-23 Budget
Capital Projects
New River Projects
Grant Funds #474, 475, 476
Purpose of Funds
The City receives federal and state grants to implement a portion of the larger New River Improvement Project established in the New River
Improvement Strategic Plan. Fund #474 reports State grant activity. Fund #476 reports Federal grant activity. Fund #475 reports the State Calexico
REACH project.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
-
$
-
$
-
$
-
Annual Activity
Revenues
Grant Revenue - Federal #476
701
3,852
1,267,702
-
Grant Revenue - State #474
(571)
4,136
393,017
28,000,000
Grant Revenue - State #475
-
139,139
321,000
-
130
147,128
1,981,719
28,000,000
Expenditures
Capital Outlay
903 New River Parkway - Fed
701
3,852
1,267,702
-
903 New River Parkway - State
(571)
4,136
393,017
-
91-902 Calexico REACH
-
139,139
321,000
28,000,000
130
147,128
1,981,719
28,000,000
Net Annual Activity
-
-
-
-
Ending Fund Balance
$
-
$
-
$
-
$
-
Balance Sheet
Cash
$
690
$
694
Current Receivables
38,659
182,286
Due to Other Funds
(38,659)
(121,485)
Current Payables
(690)
(61,495)
Unearned Revenues
-
-
Available Fund Balance
0
$
-
Proposed Budget June 14, 2022
161
City of Calexico
2022-23 Budget
Debt Service
Measure D 2012 Bond
Fund #301
Purpose of Fund
In 2012, the Imperial County Local Transportation Authority issued LTA Sales Tax Revenue Bonds on behalf of the City in the
amount of $15,4010,000. Debt service for the bonds is paid from an allocation of Measure D tax collections. This debt service
fund reports the annual payment of debt service to the bond holders.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
2,006,097
$
2,022,555
$
2,080,917
$
2,080,917
Annual Activity
Revenues
Measure D Tax
1,110,215
1,185,014
1,132,800
1,130,750
Investment Income
35,743
448
-
-
1,145,958
1,185,462
1,132,800
1,130,750
Expenditures
-
-
-
Bond Trustee and Disclosure Fees
-
-
2,000
2,000
Debt Service
1,129,500
1,127,100
1,130,800
1,128,750
1,129,500
1,127,100
1,132,800
1,130,750
-
-
-
Net Annual Activity
16,458
58,362
-
-
Ending Fund Balance
$
2,022,555
$
2,080,917
$
2,080,917
$
2,080,917
Balance Sheet
Restricted cash held by fiscal agent
$
1,131,408
$
1,131,310
Debt Service Reserve
Restricted cash held by fiscal agent
891,148
949,608
Principal and Interest Payment Accounts
Available Fund Balance
$
2,022,555
$
2,080,917
Proposed Budget June 14, 2022
162
City of Calexico
2022-23 Budget
Debt Service
Measure D 2018 Bond
Fund #302
Purpose of Fund
In 2018, the Imperial County Local Transportation Authority issued LTA Sales Tax Revenue Bonds on behalf of the City in the
amount of $12,375,000. Debt service for the bonds is paid from an allocation of Measure D tax collections. This debt service
fund reports the annual payment of debt service to the bond holders.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
5,292
$
6,644
$
6,675
$
6,675
Annual Activity
Revenues
Measure D Tax
659,850
665,220
659,050
662,450
Bond Proceeds
-
-
-
Bond Premium
-
-
-
-
Investment Income
3,026
32
-
-
662,876
665,252
659,050
662,450
Expenditures
-
-
-
Transfer to Capital Fund
-
-
-
-
Costs of Issuance
-
-
-
-
Bond Trustee and Disclosure Fees
1,675
1,570
2,000
2,000
Debt Service
659,850
663,650
657,050
660,450
661,525
665,220
659,050
662,450
-
-
-
Net Annual Activity
1,351
32
-
-
Ending Fund Balance
$
6,644
$
6,675
$
6,675
$
6,675
Balance Sheet
Cash
$
-
$
-
Restricted cash held by fiscal agent
6,644
6,675
$
6,644
$
6,675
Proposed Budget June 14, 2022
163
City of Calexico
2022-23 Budget
Debt Service
Measure H Bond
Funds # 310
Purpose of Fund
In 2014, the City issued Measure H Sales Tax/Lease Revenue Bonds to fund capital improvements including a Fire Station, park
improvements, and a contribution to the Calexico school District swimming pool project. Debt service for the bonds is paid from
an allocation of Measure H sales tax collections. This debt service fund reports the annual payment of debt service to the bond
holders.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
1,000,359
$
998,831
$
998,039
$
998,039
Annual Activity
Revenues
Transfer In- Measure H Fund #120
996,077
997,154
999,600
998,000
Investment Income
1,473
53
-
-
997,550
997,208
999,600
998,000
Expenditures
-
-
-
Bond Trustee Fee and Disclosure
3,877
2,200
4,200
4,000
Debt Service
995,200
995,800
995,400
994,000
999,077
998,000
999,600
998,000
-
-
-
Net Annual Activity
(1,528)
(792)
-
-
Ending Fund Balance
$
998,831
$
998,039
$
998,039
$
998,039
Balance Sheet
Restricted cash held by fiscal agent
$
998,831
$
998,039
Debt Service Reserve
Accounts Payble
-
-
Available Fund Balance
$
998,831
$
998,039
Proposed Budget June 14, 2022
164
City of Calexico
2022-23 Budget
Enterprise Funds
Water
Airport
Wastewater
Proposed Budget June 14, 2022
165
City of Calexico
2022-23 Budget
Public Works
Water Operations
Fund #513
Purpose of Fund
The Water Fund provides domestic potable water service to 8,000 residential and commercial customers. A user fee study was prepared in
2018-19 to adjust customer service fees to meet the Water System's long-term financial requirements. Bonds were issued in 2020 that
include a covenant to set user rates to provide revenues, net of operating expenses, of 125% of annual debt service. Surplus operating
revenues are transferred to the CIP fund to provide for ongoing capital requirements.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$ 3,000,000
$ 3,000,000
$ 3,000,000
$
3,000,000
Annual Activity
Revenues
Customer Service Fees
7,524,309
7,852,878
8,000,000
8,160,000
2% Annual Increase
Other fees/charges
412,687
191,463
290,000
490,000
2020-21: Suspended
Investment Income
66,673
2,879
10,000
10,000
late/disconnection fees
8,003,670
8,047,219
8,300,000
8,660,000
for Covid relief; resumed
-
-
-
-
fees January 2022
Expenditures
Salaries and Benefits
2,295,666
2,592,231
3,242,873
3,746,602
Materials/Supplies
958,290
994,197
1,098,900
1,128,900
Repairs/Maintenance
100,987
173,536
194,800
194,800
Contracts/Professional Services
243,861
292,641
453,200
453,200
General Liability Insurance
181,872
166,015
214,577
241,986
Administration/Office Costs
111,930
111,289
145,500
145,500
City-wide Cost Allocation
595,000
684,694
585,032
643,906
Land Lease
176,460
179,989
183,589
189,096
Capital Outlay
4,275
-
-
-
Transfer - Debt Service/Vehicles
50,143
48,176
48,176
48,176
Subtotal, Operating Budget
4,718,485
5,242,768
6,166,647
6,792,166
% Increase
14%
11%
18%
10%
Transfer - Debt Service/Bonds
974,782
841,094
827,150
825,150
Transfer - Capital Fund
2,310,403
1,963,358
1,306,203
1,042,684
8,003,670
8,047,219
8,300,000
8,660,000
-
-
-
-
Net Annual Activity
-
-
-
-
Ending Fund Balance
$ 3,000,000
$ 3,000,000
$ 3,000,000
$
3,000,000
Operating Reserve
Balance Sheet
Debt Service Coverage
Cash
$
607,531
$
202,997
8,660,000
Revenues
Customer Accounts Receivable, net
2,748,533
3,142,753
(6,792,166)
Operating Expenditures
Current Payable
(124,756)
(112,869)
1,867,834
Net
Customer Deposits
(231,308)
(232,881)
825,150
Debt Service Transfer
Available Fund Balance
$ 3,000,000
$ 3,000,000
226%
Proposed Budget June 14, 2022
166
City of Calexico
2022-23 Budget
Public Works
Water Debt Service
Fund #514
Purpose of Fund
This fund reports on status of the Water System's Water Revenue Bond debt service and vehicle leases. During 2020, the prior 2007
bonds were retired and new 2020 bonds were issued to fund the 5-year CIP program.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
990,768
$
989,179
$
(0)
$
(0)
Annual Activity
Revenues
Transfer In - #513 - Bonds
974,782
841,094
827,150
825,150
Transfer In - #513 - Vehicles
50,143
48,176
48,176
48,176
Transfer In - #516 Retire 2007 Bonds
-
8,000,000
-
-
Debt Proceeds - 2020 Bond Issue
-
17,687,906
-
-
Debt Proceeds - Vehicle Leases
20,962
-
-
-
Investment Income
1,223
6
-
-
1,047,110
26,577,182
875,326
873,326
-
-
-
-
Expenditures
Debt Service - Current Bonds
972,623
918,298
823,150
821,150
Debt Service - Vehicle Leases
50,143
48,176
48,176
48,176
Debt Service - Retire 2007 Bonds
-
11,671,982
-
-
Trustee Fees/Disclosure Costs
1,815
10,500
4,000
4,000
2020 Bond Cost of Issuance
-
396,350
-
-
Transfer to Capital Fund - 2020 Bonds
-
14,521,055
-
-
Transfer to Capital Fund - New Leases
24,118
-
-
-
1,048,699
27,566,361
875,326
873,326
-
-
-
Net Annual Activity
(1,589)
(989,179)
-
-
Ending Fund Balance
$
989,179
$
(0)
$
(0)
$
(0)
Balance Sheet
Restricted Cash/Debt Reserve
$
989,179
$
-
Available Fund Balance
$
989,179
$
-
Proposed Budget June 14, 2022
167
City of Calexico
2022-23 Budget
Public Works
Water Development Impact Fees
Fund #515
Purpose of Fund
This fund reports on status of Water Development Impact Fees. Revenues are transferred to pay for Capital Projects when eligible capital
costs are incurred.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
-
$
-
$
-
$
-
Annual Activity
Revenues
Development Fees are
Development Impact Fees
45,233
47,723
25,000
-
transferred to capital
Investment Income
837
47
-
-
fund as received to
46,069
47,770
25,000
-
support Capital
-
-
-
Program
Expenditures
Transfer - Water Capital Fund
46,069
47,770
25,000
-
46,069
47,770
25,000
-
-
-
-
Net Annual Activity
-
-
-
-
Ending Fund Balance
$
-
$
-
$
-
$
-
Balance Sheet
Cash
$
-
$
-
Available Fund Balance
$
-
$
-
Proposed Budget June 14, 2022
168
City of Calexico
2022-23 Budget
Public Works
Water Capital Improvement Program
Fund #516
Purpose of Fund
This fund tracks capital investment in the City's Water System. Bonds were issued in 2020 to finance the 5-year CIP program including
treatment plant improvements.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$ 11,727,595
$ 13,728,494
$ 19,872,618
$ 21,021,581
Annual Activity
Revenues- Transfers from Other Funds
515
Water Development Fees
46,069
47,770
25,000
-
513
Water Operating Fund
2,310,403
1,963,358
1,387,704
1,042,684
514
Water Debt Fund - Vehicle Leases
24,118
-
-
-
514
Water Debt Fund - 2020 Bond, net
-
6,521,055
-
-
Investment Income
205,691
3,520
-
-
2,586,281
8,535,703
1,412,704
1,042,684
Expenditures
-
-
924
Water System Master Plan
2,788
-
-
927
Chlorine Analyzer
-
-
75,000
960
New Clarifier and Filter System
-
16,340
-
6,000,000
961
Storage Tank Baffle Repairs
-
-
150,000
962
Raw Water Reservoir Improvements
-
66,412
1,151,000
964
Eastside Storage Tank
12,682
232,178
-
300,000
965
Treatment/Vehicles
2,300
-
-
966
Water Pipeline Replacement
103,024
1,844,117
139,750
2,086,000
975
Distibution/Vehicles
-
-
-
977
Water Rate study
-
-
-
45,000
984
Urban Water Management Study
-
301
17,578
-
985
Water Distribution Expansion
-
-
3,500,000
987
Switch to Hypochlorine
-
-
85,000
988
Prelim Engineering/Treatment Plant
31,220
37,680
-
-
992
Water Equipment
433,369
260,965
40,000
700,000
91-919
Replacement of VFD
-
-
-
300,000
91-920
Repair Pumps at WTP, Raw and
Eastside Raw Water Reservoir
-
-
-
350,000
585,382
2,391,580
263,740
14,742,000
-
-
Net Annual Activity
2,000,899
6,144,123
1,148,964
(13,699,316)
Ending Fund Balance
$ 13,728,494
$ 19,872,618
$ 21,021,581
$
7,322,266
-
Balance Sheet
5-Year Capital Improvement Program
Cash
$ 13,735,595
$ 20,109,366
2023-24
$
2,611,000
Accounts Payable
(7,100)
(236,749)
2024-25
2,262,000
Available Fund Balance
$ 13,728,494
$ 19,872,618
2025-26
2,211,000
-
-
2026-27
2,211,000
$
9,295,000
Funding Source
-
2023 Fund Balance
$
7,322,266
Future user fees
1,972,734
$
9,295,000
Proposed Budget June 14, 2022
169
City of Calexico
2022-23 Budget
Public Works
Airport
Operating Fund #522
Purpose of Fund
The City operates an international airport. Primary revenue sources include fuel sales and hangar rentals.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Available Fund Balance
$
215,354
$ 161,664
$
163,005
$
23,317
Annual Activity
Revenues
Fees and Charges
186,471
166,339
184,113
250,211
Rents and Concessions
90,894
86,513
99,000
109,696
Other
23
676
26
54
Operating Grant - Federal Covid Relief
-
39,000
22,000
-
Covid Relief Grants
Operating Grant - State
10,000
10,000
10,000
Aid to Airport Program
Investment Income
2,461
78
-
-
279,849
302,606
315,139
369,961
-
-
-
-
Expenditures
Salaries and Benefits
76,796
98,143
95,427
180,792
Proposed 2 PT FTEs/Fuel
Linemen
Materials/Supplies
154,621
130,392
230,600
175,208
Increase in Fuel Cost
Repairs/Maintenance
15,880
11,742
16,500
12,600
Contracts/Professional Services
77,043
50,984
101,000
14,300
Moved Temporary Staff
to 2 PT FTEs
Administration/Office Costs
9,199
9,725
11,300
10,064
Transfer out to Capital Fund #525
-
279
-
-
333,539
301,265
454,827
392,964
-
-
-
Net Annual Activity
(53,690)
1,341
(139,688)
(23,003)
Ending Available Fund Balance
$
161,664
$ 163,005
$
23,317
$
314
Balance Sheet
Cash
$
147,472
$
90,490
Receivables
214
39,000
Prepaid/Inventory
20,417
39,141
Payables
(6,440)
(5,626)
Available Fund Balance
$
161,664
$ 163,005
-
-
Proposed Budget June 14, 2022
170
City of Calexico
2022-23 Budget
Public Works
Airport
Capital Fund #525
Purpose of Fund
This fund tracks capital investment in the City's Airport Infrastructure. Runway and Taxiway capital improvements are typically funded with
Federal and State grants.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Available Fund Balance
$
-
$
-
$
-
$
-
Annual Activity
Revenues
Grants - Federal
150,572
7,501
165,000
4,212,565
Grants - State
528
6,814
-
-
Transfer from Operating Fund #522
-
-
-
-
Transfer from Local Capital Fund #411
9,999
279
-
-
Local Match
161,099
14,594
165,000
4,212,565
-
-
-
Expenditures
Capital Outlay
983 Taxiway Rehabilitation
161,099
14,594
165,000
4,212,565
161,099
14,594
165,000
4,212,565
Net Annual Activity
-
-
-
-
Ending Available Fund Balance
$
-
$
-
$
-
$
-
Balance Sheet
Cash/Due to Other Funds
$
-
$
(11,836)
Grants Receivable
-
12,510
Accounts Payable
-
(674)
Available Fund Balance
$
-
$
(0)
Proposed Budget June 14, 2022
171
City of Calexico
2022-23 Budget
Public Works Department
Wastewater Operations
Funds #544
Purpose of Fund
The Wastewater Fund provides service to 8,000 residential and commercial customers. A user fee study was prepared during 2018-19 to adjust
customer service fees to meet the System's long-term requirements. Bonds were issued in 2020 that include a covenant to set user rates to provide
revenues, net of operating expenses, of 125% of annual debt service. Surplus operating revenues are transferred to the CIP fund to provide for
ongoing capital requirements.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
3,000,000
$
3,000,000
$
3,000,000
$
3,000,000
Annual Activity
Revenues
Customer Service Fees
5,729,512
5,853,033
5,970,000
6,089,000
2% Annual Rate Increase
Other Fees
-
43,537
-
-
Investment Income
120,617
3,785
10,000
10,000
5,850,129
5,900,355
5,980,000
6,099,000
Expenditures
-
-
-
-
Salaries and Benefits
1,607,769
1,694,602
1,933,309
2,132,851
Materials/Supplies
672,899
674,066
767,750
794,750
Repairs/Maintenance
126,578
150,446
343,700
318,700
Contracts/Professional Services
114,771
115,416
301,400
331,400
General Liability Insurance
68,701
67,447
93,425
102,834
Administration/Office Costs
178,982
158,917
165,800
175,800
City-wide Cost Allocation
409,721
450,294
395,799
410,800
Land Lease
129,540
132,131
134,773
77,817
Capital Outlay
-
-
-
-
Transfer/Debt Fund - Leases
35,255
33,711
33,711
33,711
Subtotal, Operating Budget
3,344,216
3,477,031
4,169,668
4,378,663
% Increase
10%
4%
20%
5%
Transfers - Debt Service/Bonds
-
1,149,388
1,152,400
1,150,700
Transfer/Capital Fund
2,505,914
1,273,936
657,932
569,637
5,850,129
5,900,355
5,980,000
6,099,000
-
-
-
Net Annual Activity
-
-
-
-
Ending Fund Balance
$
3,000,000
$
3,000,000
$
3,000,000
$
3,000,000
Operating Reserve
Balance Sheet
Debt Service Coverage Ratio
Cash
$
3,070,372
3,074,230
6,099,000
Revenues
Current Receivables/Prepaid
5,661
(4,378,663)
Operating Expenditures
Advance to General Fund
-
1,720,337
Net
Current Payables
(76,033)
(74,230)
1,150,700
Debt Service Transfer
Available Fund Balance
$
3,000,000
$
3,000,000
150% Coverage Ratio
-
-
Proposed Budget June 14, 2022
172
City of Calexico
2022-23 Budget
Public Works Department
Wastewater Debt Service
Funds #545
Purpose of Fund
This fund tracks the status of the Wastewater System's debt service obligations including vehicle leases. A new bond issue was issued in 2020
to finance the System's 5-year CIP program.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
-
$
-
$
0
$
0
Annual Activity
Revenues
Transfer In - #544 - Bonds
-
1,149,390
1,152,400
1,150,700
Transfer In - #544 - Vehicles
35,255
33,711
33,711
33,711
Debt Proceeds - 2020 Bond Issue
-
24,716,440
-
-
35,255
25,899,541
1,186,111
1,184,411
-
-
-
Expenditures
Debt Service - Bonds
-
1,147,888
1,148,400
1,146,700
Debt Service - Vehicle Leases
35,255
33,711
33,711
33,711
Trustee Fees/Disclosure Costs
-
1,500
4,000
4,000
2020 Bond Cost of Issuance
-
534,860
-
-
Transfer to Capital Fund - 2020 Bonds
-
24,181,581
-
-
35,255
25,899,541
1,186,111
1,184,411
-
-
-
Net Annual Activity
-
0
-
-
Ending Fund Balance
$
-
$
0
$
0
$
0
Balance Sheet
Cash
-
-
Available Fund Balance
$
-
$
-
Proposed Budget June 14, 2022
173
City of Calexico
2022-23 Budget
Public Works
Wastewater Impact Fees
Fund #546
Purpose of Fund
This fund reports on the status of the Wastewater Development Impact Fees. Funds are transferred to pay for Wastewater Capital Projects
when eligible capital costs are incurred.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
-
$
-
$
-
$
-
Annual Activity
Revenues
Development Fees are
Development Impact Fees
35,190
37,337
20,000
-
transferred to capital
Investment Income
651
37
-
-
fund as received to
35,841
37,374
20,000
-
support Capital Program
-
-
-
Expenditures
Transfer to Capital Fund
35,841
37,374
20,000
-
35,841
37,374
20,000
-
-
-
-
Net Annual Activity
-
-
-
-
Ending Fund Balance
$
-
$
-
$
-
$
-
Balance Sheet
Cash
$
-
$
-
Available Fund Balance
$
-
$
-
-
-
Proposed Budget June 14, 2022
174
City of Calexico
2022-23 Budget
Public Works
Wastewater Capital Improvement Program
Fund #547
Purpose of Fund
This fund tracks capital investment in the City's Wastewater System. Bonds were issued in 2020 to finance the 5-year CIP program including
plant expansion and upgrade.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$19,809,677
$
20,612,764
$ 45,685,687
$ 44,980,667
Annual Activity
Revenues
Transfer - Impact Fees
35,841
37,374
20,000
-
Transfer In - Operating Fund
2,505,914
1,273,936
748,432
569,637
Transfer In - Bond Proceeds
-
24,181,581
Investment Income
328,556
19,983
-
-
2,870,310
25,512,875
768,432
569,637
Expenditures
-
-
-
Capital Outlay
931
Wastewater Master Plan
-
-
-
-
933
Lift Station No. 9 and 11 Rehab.
53,968
184,086
80,000
6,427,217
934
Emergency Generator Replacement
-
1,025,000
936
UV Disinfection System Upgrade
66,946
24,509
-
375,000
937
Laboratory Equipment Replacement
-
6,519
15,000
70,000
938
Compactor, Bar Screen, Grit Chamber
Replacement (Headwork)
60,647
4,728
-
1,190,000
940
Sewer Manhole/Collection Rehab
142,311
87,754
1,342,653
2,330,000
972
Lift Station No. 1 Replacement
-
-
1,700,000
973
Plant Expansion and Upgrade
1,321,293
43,706
-
15,854,785
974
CCTV Inside/Sewer Collection Pipes
8,510
1,200
800
150,000
975
Distibution/Vehicles
2,300
-
-
977
Wastewater Rate study
-
-
45,000
982
Flores Stree Improvements
7,616
-
-
986
Collection System Master Plan
-
-
201,000
993 Wastewater Equipment
403,633
87,450
35,000
600,000
2,067,224
439,951
1,473,453
29,968,002
-
-
Net Annual Activity
803,087
25,072,924
(705,021)
(29,398,365)
Ending Fund Balance
$20,612,764
$
45,685,687
$ 44,980,667
$ 15,582,302
Balance Sheet
5-Year Capital Improvement Program
Cash
$ 20,665,271
$
45,697,495
2023-24
$
15,745,215
Accounts Payable
(52,507)
(11,808)
2024-25
1,600,000
Available Fund Balance
$ 20,612,764
$
45,685,687
2025-26
1,600,000
-
-
2026-27
1,600,000
$
20,545,215
Funding Source
2023 Fund Balance
$
15,582,302
Future user fees
4,962,913
$
20,545,215
Proposed Budget June 14, 2022
175
Proposed Budget June 14, 2022
176
City of Calexico
2022-23 Budget
CFD/Special District Funds
Proposed Budget June 14, 2022
177
City of Calexico
2022-23 Budget
CFD/Special District Funds
Bravo Victoria
Fund #261
Purpose of Fund
This district was established in June 2003 to support ongoing maintenance within the district including parks, landscaping, lighting and
regional storm water/drainage retention system facilities.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
910,787
$
1,042,345
$
1,056,713
$
789,651
Annual Activity
Revenues
District Assessments
152,188
221,954
219,000
219,000
Reserve for Delinquencies
(19,000)
(19,000)
Investment Income
17,840
1,132
-
-
170,028
223,085
200,000
200,000
Expenditures
-
-
-
-
Professional Services
4,631
6,250
30,000
30,000
Materials and Supplies
413
11,686
25,000
25,000
Temporary Staffing
24,715
27,727
75,000
75,000
Repairs & Maintenance
3,374
382
15,000
15,000
Capital
5,337
162,672
322,062
740,000
#978 Cordova Park
38,470
208,717
467,062
885,000
-
-
-
-
Net Annual Activity
131,558
14,368
(267,062)
(685,000)
Ending Fund Balance
$
1,042,345
$
1,056,713
$
789,651
$
104,651
Balance Sheet
Fund Balance Reserve
Cash/Due from Other Funds
$
982,311
$
1,093,056
Six Months Operating Revenue
100,000
Accounts Receivable
63,196
6,004
5-Year CIP Program
-
Accounts Payable
(3,161)
(42,347)
Available Fund Balance
4,651
Available Fund Balance
$
1,042,345
$
1,056,713
104,651
Proposed Budget June 14, 2022
178
City of Calexico
2022-23 Budget
CFD/Special District Funds
Hearthstone
Funds #903
Purpose of Fund
Community Facilities District #2005-01 (Hearthstone) provides revenue from annual assessments on property within the District.
Assessment revenues pay for debt service on a bond issued to finance public facilities and capital impact fees relating to a residential
development within the District. An additional assessment is levied to provide for Public Safety services within the District. District
assessment revenue collections are short of debt service requirements due to undeveloped parcels and delinquencies.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$ 499,109
$
446,563
$
647,534
$
509,827
Annual Activity
Revenues
Assessments - Debt
615,967
560,376
1,037,293
1,038,545
Reserve for delinquencies
-
(475,000)
(475,000)
615,967
560,376
562,293
563,545
Assessments - Special Services
118,647
131,753
133,951
145,930
Investment Income
3,407
252
-
-
738,021
692,381
696,244
709,475
Expenditures
-
-
-
-
Debt Service
Debt Service - Principal
-
-
-
460,000
Sept 2022
Debt Service - Interest
650,088
325,044
650,000
650,000
Sept 2022, Mar 2023
Debt Service - Shortfall
-
-
-
(85,000)
650,088
325,044
650,000
1,025,000
Special Services
Public Safety - General Fund
118,647
131,753
133,951
141,617
118,647
131,753
133,951
141,617
Administration
Administration
25
24,262
25,000
23,000
Rate Consultant
3,806
5,164
6,000
6,000
Bond Disclosure
6,538
1,500
2,000
2,000
Bond Trustee
-
-
2,000
2,000
Arbitrage Calculation
-
-
-
2,000
Attorney
11,464
3,688
15,000
15,000
Foreclosure
21,833
34,613
50,000
50,000
proceedings on
delinquent
Total Expenditures
790,568
491,410
833,951
1,216,617
assessements
-
-
-
-
Net Annual Activity
(52,546)
200,971
(137,707)
(507,142)
Ending Fund Balance
$ 446,563
$
647,534
$
509,827
$
2,685
Balance Sheet
Cash in City Pool
$
57,046
$
226,041
$
-
$
-
Cash with Fiscal Agent - Debt Reserve
138,581
137,432
137,432
2,685
Cash with Fiscal Agent - Other
56,518
274,360
372,395
-
Accounts Receivable
197,260
13,487
-
-
Accounts Payable
(2,842)
(3,786)
-
-
Available Fund Balance
$ 446,563
$
647,534
$
509,827
$
2,685
Proposed Budget June 14, 2022
179
City of Calexico
2022-23 Budget
CFD/Special District Funds
Gran Plaza
Fund #906
Purpose of Fund
This district was established to finance certain public facilities at the outlet mall project located at West Second Street across from Calexico
Airport. The fund tracks the tax and assessment revenues collected to pay debt service on bonds.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
1,076,777
$
1,089,238
728,305
1,051,231
Annual Activity
Revenues
District Assessments
248,978
179,983
721,956
363,846
Annual Rate Report
Taxes
381,281
-
142,052
142,052
Gross Tax Projection
$
442,052
Less City Retention
(300,000)
$
142,052
Investment Income
14,851
346
-
-
645,110
180,329
864,008
505,898
-
-
-
-
Expenditures
Debt Service
Principal
145,000
150,000
155,000
165,000
Interest
371,475
366,400
360,581
353,975
Redemption
-
-
-
130,000
Development
Professional Services
Agreement Step 4
Rate Consultant
4,134
4,137
4,200
5,200
Attorney
234
22
-
Trustee
1,750
1,750
1,800
2,000
Bond Disclosure
1,525
1,500
1,500
2,000
Arbitrage Calculation
-
-
-
2,000
Administration
17,008
17,453
18,000
16,954
Costs of Issuance
91,524
-
-
-
Delinquency/Other
-
-
-
7,277
632,649
541,262
541,081
684,406
-
-
-
-
Net Annual Activity
12,461
(360,934)
322,927
(178,508)
Ending Fund Balance
$
1,089,238
728,305
1,051,231
872,723
Balance Sheet
Projected
Projected
Cash in City Pool
$
195,576
51,595
53,921
3,920
Cash with Fiscal Agent - Reserve
547,023
365,385
522,827
522,827
Cash with Fiscal Agent - P& I
137
90,007
343,741
345,234
Sept 2023 Payment
Cash with Fiscal Agent - COI
91,524
91,560
-
-
Redemption Fund
130,703
130,742
130,742
742
Accounts Receivable
124,489
-
-
-
Accounts Payable
(213)
(985)
-
-
Available Fund Balance
$
1,089,238
728,305
1,051,231
872,723
Proposed Budget June 14, 2022
180
City of Calexico
2022-23 Budget
Internal Service Funds
Self Insurance Programs
Proposed Budget June 14, 2022
181
Page 13 of 129
City of Calexico
2022-23 Budget
Internal Service Funds
Employee Medical Benefits
Fund #601
Purpose of Fund
The City administers a medical insurance program for the benefit of active employees. Program costs are estimated by the City's insurance
broker. Beginning in FY 2020-21, the City purchases third party medical insurance on behalf of employees and continues to pay certain out-
of pocket costs through a third party administrator. Estimated program costs for current employees are contributed by City departments
through a bi-weekly payroll allocation.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
167,421
$
131,691
$
277,091
$
327,091
Annual Activity
Revenues
Department Payroll Contributions
Budget assumes
General Fund
2,410,509
all positions are
Water Fund
594,203
filled; Actual
Wastewater Fund
373,436
results based on
Other Funds
126,450
filled positions
1,582,786
2,115,107
2,500,000
3,504,597
Employee Cost Share
315,756
366,559
450,000
662,554
1,898,542
2,481,665
2,950,000
4,167,152
Department Admin Contributions
General Fund
43,360
29,304
33,971
33,971
Water Fund
8,847
5,194
7,344
7,344
Wastewater Fund
6,092
3,802
4,685
4,685
58,300
38,300
46,000
46,000
Other Sources
Reimbursements, COBRA
14,411
5,362
-
-
Interest
8,251
383
-
-
Transfer from other ISF program
-
-
-
-
1,979,504
2,525,711
2,996,000
4,213,152
Expenditures
-
-
-
Includes insurance
Active Employees
premiums, claims,
Benefits/Premiums paid
1,979,495
2,337,646
2,900,000
4,167,152
and administrator
Broker Services
27,600
27,600
30,000
30,000
Employee Assistance Program
8,139
8,445
9,000
9,000
Other program costs
-
6,621
7,000
7,000
2,015,234
2,380,311
2,946,000
4,213,152
Transfer to other ISF Programs
-
-
-
-
2,015,234
2,380,311
2,946,000
4,213,152
-
-
-
Net Annual Activity
(35,730)
145,400
50,000
-
Ending Fund Balance
$
131,691
$
277,091
$
327,091
$
327,091
Target Reserve
% Annual Expenditures
11%
8%
8% = 1 month
Balance Sheet
Cash/Due from Other Funds
$
214,339
$
397,161
Current Receivables
11,629
-
Current Payables
(94,277)
(120,070)
Available Fund Balance
$
131,691
$
277,091
Proposed Budget June 14, 2022
182
City of Calexico
2022-23 Budget
Internal Service Funds
Retiree Medical Benefits
Fund #602
Purpose of Fund
The City administers a medical insurance program for the benefit of certain eligible retirees. Program costs are estimated by the City's
actuary. Beginning in FY 2020-21, the City purchases third party medical insurance on behalf of eligible retirees and continues to pay
certain out-of pocket costs through a third party administrator. Program costs for retirees are allocated to City departments based upon
the number of authorized employee positions. Starting in 2021, the City has started prefunding its retiree medical obligations with the
intent to amortize the unfunded liability over 30 years.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
113,302
$
74,764
$
313,135
$
113,135
Annual Activity
Revenues
Department Benefit Contributions
General Fund
654,146
719,292
Water Fund
128,750
155,501
Wastewater Fund
87,105
99,207
805,000
942,000
870,000
974,000
Retiree Share
57,604
56,620
60,000
60,000
862,604
998,620
930,000
1,034,000
Admin/Premium Contributions
General Fund
137,593
137,719
232,583
-
Merged into Benefit
Water Fund
28,075
24,412
45,580
-
Contribution above
Wastewater Fund
19,332
17,869
30,837
-
185,000
180,000
309,000
-
Other Sources
Program Contributions to OPEB
135,000
242,000
Interest
2,271
561
-
-
1,049,875
1,179,181
1,374,000
1,276,000
Expenditures
-
-
Benefits paid
885,704
549,299
930,000
1,370,000
Actuary Projection
-
(320,000)
Claims Trend
Claims Administration/Premiums
194,309
265,111
300,000
-
Combined
Other program costs
8,400
8,400
9,000
9,000
1,088,412
822,810
1,239,000
1,059,000
OPEB Trust Contribution
135,000
242,000
Supplemental OPEB Trust Contribution
200,000
-
Transfer to other ISF Programs
-
118,000
-
-
1,088,412
940,810
1,574,000
1,301,000
-
Net Annual Activity
(38,537)
238,371
(200,000)
(25,000)
Ending Fund Balance
$
74,764
$
313,135
$
113,135
$
88,135
Target Reserve
% Annual Expenditures
8%
8% = 1 month
Current Benefits
Balance Sheet
Cash/Due from Other Funds
$
100,073
$
347,498
$
313,135
$
288,135
Current Receivables
34,068
-
-
-
Current Payables
(59,377)
(34,363)
-
-
Available Fund Balance
74,764
313,135
313,135
288,135
OPEB Prefunding Reserve
-
135,000
470,000
712,000
Total Fund Balance
$
74,764
$
448,135
$
783,134
$ 1,000,134
Proposed Budget June 14, 2022
183
City of Calexico
2022-23 Budget
Internal Service Funds
Workers Compensation
Fund #603
Purpose of Fund
The City administers its Workers Compensation Program through this Internal Service Fund. Program costs are estimated by
a third party broker and actuary. City departments contribute premiums through payroll contributions as a percentage of salary.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
(922,308)
$
(165,178)
$
2,628
$
27,649
Annual Activity
Revenues
Department Payroll Contributions
General Fund
955,949
1,055,231
Water Fund
225,665
250,404
Wastewater Fund
125,510
134,875
Other Funds
64,897
66,002
Vacancy
(150,000)
(150,000)
1,200,760
1,289,486
1,222,020
1,356,512
General Fund - JPIA
227,647
-
-
-
Investment Income
28,137
2,244
-
-
Transfer from Other ISF Funds
513,000
-
-
-
1,969,544
1,291,730
1,222,020
1,356,512
Expenditures
-
-
(0.00)
-
Claims
Claim payments
556,375
432,046
811,000
852,000
Actuarial Projection
Actuarial Loss reserves
339,000
133,000
(75,000)
(75,000)
Claims Trend
895,375
565,046
736,000
777,000
Other Costs
CSAC/Excess Insurance
172,543
224,041
335,000
375,000
CSAC/Broker
17,197
16,432
20,000
20,000
CSAC/Administration
-
19,515
20,000
20,000
Claims Administrator
56,677
45,227
25,000
25,000
Actuary
2,250
2,250
3,000
3,000
State Fees
21,141
17,993
23,000
23,000
Loss Control Programs
2,785
33,420
35,000
35,000
JPIA Payment Plan
44,446
-
-
-
317,039
358,878
461,000
501,000
Transfer out to Other ISFs
200,000
1,212,414
1,123,924
1,197,000
1,278,000
-
-
-
-
Net Annual Activity
757,130
167,806
25,020
78,512
Target Reserve
Ending Fund Balance
$
(165,178)
$
2,628
$
27,649
$
106,161
8% = 1 month
% Annual Expenditures
2%
8%
Balance Sheet
Cash/Due from Other Funds
$ 2,062,316
$ 2,018,398
Receivables/Deposits
136,074
125,000
Current Payables/Claim Reserve
(727,311)
(690,770)
Actuarial Long-term Claim Reserve
(1,343,000)
(1,450,000)
JPIA Retrospective Charges
(293,257)
-
Fund Balance (Long-term)
$
(165,178)
$
2,628
Proposed Budget June 14, 2022
184
City of Calexico
2022-23 Budget
Internal Service Funds
Unemployment Insurance
Fund #604
Purpose of Fund
The City administers its Unemployment Self Insurance Program through this Internal Service Fund. The State of California bills the City for
unemployment insurance claims. City departments contribute an allocation of estimated program costs through bi-weekly payroll
contributions as a percentage of salary.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
952
$
784
$
4,112
$
4,279
Annual Activity
Revenues
Department Payroll Contributions
Payroll charges
General Fund
39,831
43,968
reduced in 2022
Water Fund
9,403
10,434
due to favorable
Wastewater Fund
5,230
5,620
claims trend.
Other Funds
2,704
2,750
Investment Income
-
-
75,969
79,754
57,168
62,771
Expenditures
Claims
18,137
11,426
57,000
62,271
Transfers - Other ISF Programs
58,000
65,000
-
-
76,137
76,426
57,000
62,271
Net Annual Activity
(168)
3,328
168
500
Target Reserve
Ending Fund Balance
$
784
$
4,112
$
4,279
$
4,779
8% = 1 month
% Annual Expenditures
8%
8%
Balance Sheet
Cash/Due from Other Funs
$
2,333
$
5,508
Current Receivables
182
-
Current Payables
(1,731)
(1,327)
Available Fund Balance
$
784
$
4,182
Proposed Budget June 14, 2022
185
City of Calexico
2022-23 Budget
Internal Service Funds
General Liability
Fund #605
Purpose of Fund
The City administers its General Liability Insurance Program through this Internal Service Fund. Program costs are estimated by a third
party broker and actuary. City departments contribute an allocation of estimated program costs. Allocations are based 50% upon the
number of budgeted employees and 50% based upon capitalized assets.
2019-20
2020-21
2021-22
2022-23
Actual
Actual
Projected
Budget
Notes
Beginning Fund Balance
$
(228,906)
$
21,101
$
292
$
83,170
Annual Activity
Revenues
Department Contributions
Methodology
General Fund
441,572
713,838
591,998
670,181
50% Program FTEs
Water Fund
182,733
166,015
214,577
241,986
50% Capital Assets
Wastewater Fund
69,695
67,447
93,425
102,834
694,000
947,300
900,000
1,015,000
General Fund/JPIA Installment
406,131
-
-
-
Transfer from Other ISFs
383,000
-
-
Investment Income
31,398
915
-
-
1,131,529
1,331,215
900,000
1,015,000
Expenditures
-
-
Claim Payments
104,130
629,332
150,000
218,000
Actuary Projection
Actuarial Loss Reserves
121,000
201,496
-
-
225,130
830,828
150,000
218,000
Excess Insurance
General Liability
228,356
229,640
304,106
360,000
Excess Liability
25,913
40,505
55,742
70,000
Property Program
82,189
173,018
225,413
280,000
Earthquake, Vehicles,
Boiler/Machinery
Crime
3,717
4,417
2,000
4,400
Cyber
1,600
2,550
4,183
6,000
Underground Storage
2,104
2,104
4,000
2,300
Pollution
1,339
1,339
2,178
10,000
345,218
453,573
597,622
732,700
Third Party Administrator
32,250
31,500
31,500
31,500
Other Service Providers/Actuary
31,891
36,123
38,000
38,000
JPIA Interest and Credits
(207,967)
-
-
-
426,522
1,352,024
817,122
1,020,200
Transfer to Other ISF Program
455,000
-
-
-
To Workers Comp
881,522
1,352,024
817,122
1,020,200
Net Annual Activity
250,007
(20,809)
82,879
(5,200)
Ending Fund Balance
$
21,101
$
292
$
83,170
$
77,970
Target Reserve
% Annual Expenditures
-
-
8%
8% = 1 month
Balance Sheet
Cash/Due from Other Funds
$
1,273,859
$ 1,565,411
Prepaid and Deposit with TPA
172,729
220,513
Current Payables/Claim Reserve
(1,063,603)
(1,267,632)
Actuarial Long-term Claim Reserve
(231,000)
(518,000)
JPIA Retrospective Charges
(130,883)
-
Fund Balance (Long-term)
$
21,101
$
292
Proposed Budget June 14, 2022
186
|