|
|
5. Install a new O-ring to the heater hose coolant return tube. Coat the new O-ring with antifreeze 6. Install coolant return tube and its mounting bolt to engine. 7. Connect throttle body control cables. 8. Install oil dipstick mounting bolt. 9. Install idler pulley. Tighten bolt to 54 N·m (40 ft. lbs.) torque. 10. Install drive belt (Refer to 7 - COOLING/ACCES- SORY DRIVE/DRIVE BELTS - INSTALLATION). 11. Install air cleaner assembly. 12. Install upper radiator hose to radiator. 13. Connect wiring harness to A/C compressor. 14. Connect battery negative cable. 15. Fill cooling system (Refer to 7 - COOLING - STANDARD PROCEDURE). 16. Start and warm the engine. Check for leaks. 7 - 48 ENGINE ND |