Renault Wind Roadster (2012 year). Instruction - part 11

 

  Index      Renault     Renault Wind Roadster - instruction 2012 year in english

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  9  10  11 

 

 

 

Renault Wind Roadster (2012 year). Instruction - part 11

 

 

6.13

ENG_UD10910_1

Justificatif d’entretien (X06 - X35 - X44 - X45 - X65 - X73 - X81 - X84 - X85 - X90 - X70 - X76 - X83 - X61 - X24 - X77 ph2 - L38 - L43 - L47 - X61 BUp - X33 - Renault)

ENG_NU_865-6_E33_Renault_6

seRVice sheets 

(6/6)

Vin: ..................................................................................

Date: 

 

  Miles (km): 

 

    Invoice number:

Comments/miscellaneous

type of operation:

stamp

Service   

 

  □

.......................................     □
anticorrosion check:
OK  □    Not OK*  □

*See specific page

Date: 

 

  Miles (km): 

 

    Invoice number:

Comments/miscellaneous

type of operation:

stamp

Service   

 

  □

.......................................     □
anticorrosion check:
OK  □    Not OK*  □

*See specific page

Date: 

 

  Miles (km): 

 

    Invoice number:

Comments/miscellaneous

type of operation:

stamp

Service   

 

  □

.......................................     □
anticorrosion check:
OK  □    Not OK*  □

*See specific page

anti-corrosion check .............................(up to the end of the DU)

6.14

ENG_UD10911_1

Contrôle anticorrosion (X35 - X44 - X45 - X65 - X73 - X81 - X84 - X85 - X90 - X91 - X70 - X76 - X83 - X61 - X24 - X77 ph2 - X95 - X61 BUp - X33 - X47 - X43 - X38 - 

ENG_NU_865-6_E33_Renault_6

Anticorrosion check

anticoRRosion check 

(1/5)

If the continuation of the warranty is subject to repair, it is indicated below.

Vin: ..........................................................

Corrosion repair operation to be carried 

out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

6.15

ENG_UD10911_1

Contrôle anticorrosion (X35 - X44 - X45 - X65 - X73 - X81 - X84 - X85 - X90 - X91 - X70 - X76 - X83 - X61 - X24 - X77 ph2 - X95 - X61 BUp - X33 - X47 - X43 - X38 - 

ENG_NU_865-6_E33_Renault_6

anticoRRosion check 

(2/5)

If the continuation of the warranty is subject to repair, it is indicated below.

Vin: ..........................................................

Corrosion repair operation to be carried 

out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

6.16

ENG_UD10911_1

Contrôle anticorrosion (X35 - X44 - X45 - X65 - X73 - X81 - X84 - X85 - X90 - X91 - X70 - X76 - X83 - X61 - X24 - X77 ph2 - X95 - X61 BUp - X33 - X47 - X43 - X38 - 

ENG_NU_865-6_E33_Renault_6

anticoRRosion check 

(3/5)

If the continuation of the warranty is subject to repair, it is indicated below.

Vin: ..........................................................

Corrosion repair operation to be carried 

out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

6.17

ENG_UD10911_1

Contrôle anticorrosion (X35 - X44 - X45 - X65 - X73 - X81 - X84 - X85 - X90 - X91 - X70 - X76 - X83 - X61 - X24 - X77 ph2 - X95 - X61 BUp - X33 - X47 - X43 - X38 - 

ENG_NU_865-6_E33_Renault_6

anticoRRosion check 

(4/5)

If the continuation of the warranty is subject to repair, it is indicated below.

Vin: ..........................................................

Corrosion repair operation to be carried 

out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

6.18

ENG_UD10911_1

Contrôle anticorrosion (X35 - X44 - X45 - X65 - X73 - X81 - X84 - X85 - X90 - X91 - X70 - X76 - X83 - X61 - X24 - X77 ph2 - X95 - X61 BUp - X33 - X47 - X43 - X38 - 

ENG_NU_865-6_E33_Renault_6

anticoRRosion check 

(5/5)

If the continuation of the warranty is subject to repair, it is indicated below.

Vin: ..........................................................

Corrosion repair operation to be carried 

out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

Repair to be carried out:

stamp

Date of repair:

 

 

 

 

 

 

 

Content   ..  9  10  11