Nissan Juke F15. Manual - part 609

 

  Index      Nissan     Nissan Juke F15 (2015 year) - Service and Repair Manual

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  607  608  609  610   ..

 

 

Nissan Juke F15. Manual - part 609

 

 

NORMAL OPERATING CONDITION

EC-1249

< SYMPTOM DIAGNOSIS >

[MR EXCEPT FOR NISMO RS MODELS]

C

D

E

F

G

H

I

J

K

L

M

A

EC

N

P

O

NORMAL OPERATING CONDITION

Description

INFOID:0000000012198775

FUEL CUT CONTROL (AT NO LOAD AND HIGH ENGINE SPEED)

If the engine speed is above 1,800 rpm under no load (for example, the selector lever position is neutral and

engine speed is over 1,800 rpm) fuel will be cut off after some time. The exact time when the fuel is cut off var-

ies based on engine speed.

Fuel cut will be operated until the engine speed reaches 1,500 rpm, then fuel cut will be cancelled.

NOTE:

This function is different from deceleration control listed under direct injection gasoline system, 

EC-630,

"DIRECT INJECTION GASOLINE SYSTEM : System Description"

.

EC-1250

< PERIODIC MAINTENANCE >

[MR EXCEPT FOR NISMO RS MODELS]

IDLE SPEED

PERIODIC MAINTENANCE

IDLE SPEED

Inspection

INFOID:0000000012198776

1.

CHECK IDLE SPEED

With CONSULT

Check idle speed in “DATA MONITOR” mode with CONSULT.

>> INSPECTION END

IGNITION TIMING

EC-1251

< PERIODIC MAINTENANCE >

[MR EXCEPT FOR NISMO RS MODELS]

C

D

E

F

G

H

I

J

K

L

M

A

EC

N

P

O

IGNITION TIMING

Inspection

INFOID:0000000012198777

1.

CHECK IGNITION TIMING

1. Attach timing light to the ignition coil No.1 harness.

2. Check ignition timing.

>> INSPECTION END

1

: Timing indicator

PBIB3263E

EC-1252

< PERIODIC MAINTENANCE >

[MR EXCEPT FOR NISMO RS MODELS]

EVAPORATIVE EMISSION SYSTEM

EVAPORATIVE EMISSION SYSTEM

Inspection

INFOID:0000000012198778

1.

CHECK EVAP CANISTER

1. Block port (B).

2. Blow air into port (A) and check that it flows freely out of port (C).

3. Release blocked port (B).

4. Apply vacuum pressure to port (B) and check that vacuum pres-

sure exists at the ports (A) and (C). 

5. Block port (A) and (B).

6. Apply pressure to port (C) and check that there is no leakage.

>> INSPECTION END

PBIB1212E

 

 

 

 

 

 

 

Content   ..  607  608  609  610   ..