|
|
|
(c) Install the hose clamp. (1) PS air hose to No. 4 timing belt cover (e) Connect the volume air flow meter connector. 18. CONNECT CONTROL CABLES TO THROTTLE BODY Connect the following cables: (1) Accelerator cables (2) (A/T) Throttle control cable (3) Cruise control actuator cable 19. INSTALL BATTERY 20. FILL ENGINE WITH COOLANT (See page CO–5) Capacity (w/Heater): M/T 8.5 liters (9.0 US qts, 7.5 lmp. qts) A/T 8.4 liters (8.9 US qts, 7.4 lmp. qts) 21. START ENGINE AND CHECK FOR LEAKS 22. (A/T) CHECK AUTOMATIC TRANSMISSION FLUID LEVEL 23. CHECK IGNITION TIMING (See page IG–14) Ignition timing: 10 ° BTDC @ idle (w/ Terminals TE1 and E1 connected) 24. INSTALL ENGINE UNDER COVER 25. INSTALL HOOD 26. PERFORM ROAD TEST Check for abnormal noise, shock, slippage, correct shift 27. RECHECK ENGINE COOLANT AND ENGINE OIL LEVELS EM–112 – ENGINE MECHANICAL Cylinder Block |