|
|
MANUAL GEARBOX 3. Place straight edge across gear and check clearance between gear and straight ASSEMBLING MAINSHAFT With the first-second synchromesh hub and 2. Fit the roller bearing and bush to first gear. Fit first gear to mainshaft. First gear assembly 1 3 4. Fit the taper bearing to mainshaft using MS 47, collets 18G 47 BA and adaptor 18G 47 OVERHAUL |