|
|
100 . Attach the left-hand HO2S wiring harness.
Install the retaining bolt.
Tighten to 10 Nm.
101 . Connect the CKP sensor electrical connector.
102 . NOTE:
Install a new O-ring seal.
Install the oil level indicator and tube. |