Isuzu N-Series. Manual - part 269

 

  Index      Isuzu     Isuzu N-Series - service repair manual

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  267  268  269  270   ..

 

 

Isuzu N-Series. Manual - part 269

 

 

5A4-50 ABS/ASR

DTC:C0245 (Flash Code 45) Solenoid Monitor Circuit Fault

Check flow B-12

Step

Action

Value

YES

NO

1

Replace the EHCU.

Is this step completed?

Go to Step2

Go to Step1

2

1. Install all the components, and check that

those are installed properly.

2. Clear the DTC.
3. Test run the vehicle.

Is this step completed?

Go to “Diagnostic 

basic flow”.

Go to Step2

ABS/ASR 5A4-51

DTC:C0251 (Flash Code 51) Speed Sensor Open/Short Circuit; FL

Check flow B-13

Step

Action

Value

YES

NO

1

1. Turn the starter switch OFF.
2. Disconnect the connector of the EHCU.
3. Measure the resistance between the J-

177 connector terminals 32 and 33.

Is the value within specified value?

1 — 2k

Go to Step2

Go to Step3

2

Measure the resistance between the J-177
connector terminals 32 and the ground.

Is the value within specified value?

1000k

Ω or 

more

Go to Step7

Go to Step4

3

1. Disconnect the FL wheel speed sensor

connector.

2. Measure the resistance between the J-75

connector terminals 1 and 2 (sensor
side).

Is the value within specified value?

1 — 2

Go to Step5

Go to Step6

4

1. Disconnect the FL wheel speed sensor

connector.

2. Measure the resistance between the J-75

connector terminal 1 (sensor side) and
the ground.

Is the value within specified value?

1000k

Ω or 

more

Go to Step5

Go to Step6

5

Repair the circuit for open/short circuit
between the control unit connector and the
sensor connector.

Is this step completed?

Go to Step8

6

Replace the FL wheel speed sensor.

Is this step completed?

Go to Step8

7

Replace the control unit.

Is this step completed?

Go to Step8

8

1. Install all the components, and check that

those are installed properly.

2. Clear the DTC.

Is this step completed?

Go to “Diagnostic 

basic flow”.

Go to Step8

5A4-52 ABS/ASR

DTC:C0252 (Flash Code 52) Speed Sensor Open/Short Circuit; FR

Check flow B-14

Step

Action

Value

YES

NO

1

1. Turn the starter switch OFF.
2. Disconnect the connector of the EHCU.
3. Measure the resistance between the J-

177 connector terminals 10 and 11.

Is the value within specified value?

1 — 2k

Go to Step2

Go to Step3

2

Measure the resistance between the J-177
connector terminals 10 and the ground.

Is the value within specified value?

1000k

Ω or 

more

Go to Step7

Go to Step4

3

1. Disconnect the FR wheel speed sensor

connector.

2. Measure the resistance between the J-74

connector terminals 1 and 2 (sensor
side).

Is the value within specified value?

1 — 2k

Go to Step5

Go to Step6

4

1. Disconnect the FR wheel speed sensor

connector.

2. Measure the resistance between the J-74

connector terminal 1 (sensor side) and
the ground.

Is the value within specified value?

1000k

Ω or 

more

Go to Step5

Go to Step6

5

Repair the circuit for open/short circuit
between the control unit connector and the
sensor connector.

Is this step completed?

Go to Step8

6

Replace the FR control unit.

Is this step completed?

Go to Step8

7

Replace the control unit.

Is this step completed?

Go to Step8

8

1. Install all the components, and check that

those are installed properly.

2. Clear the DTC.

Is this step completed?

Go to “Diagnostic 

basic flow”.

Go to Step8

ABS/ASR 5A4-53

DTC:C0253 (Flash Code 53) Speed Sensor Open/Short Circuit; RL

Check flow B-15

Step

Action

Value

YES

NO

1

1. Turn the starter switch OFF.
2. Disconnect the connector of the EHCU

and the RL wheel speed sensor connec-
tor J-149.

3. Check for continuity between the J-177

connector terminal 34 and the J-149 sen-
sor connector terminal 2.

Is there continuity?

Go to Step2

Go to Step7

2

Check for continuity between the J-177 con-
nector terminals 34 and 1.

Is there continuity?

Go to Step7

Go to Step3

3

Check for continuity between the J-177 con-
nector terminal 22 and the J-149 sensor con-
nector terminal 1.

Is there continuity?

Go to Step4

Go to Step7

4

Check for continuity between the J-177 con-
nector terminals 22 and 1.

Is there continuity?

Go to Step7

Go to Step5

5

1. Connect the connector of the EHCU.
2. Turn the starter switch ON.
3. Measure the voltage between the J-149

sensor connector terminal 1 and the
ground.

Is the value within specified value?

9 — 16V

Go to Step6

Go to Step7

6

Check the RL wheel speed sensor output.
(Refer to the check flow C-1-3.)

Is the fail corrected?

Go to Step9

Go to Step8

7

Repair the circuit for open/short circuit, and
the connector for improper connection
between the connector of EHCU and the
speed sensor connector.

Is this step completed?

Go to Step9

Go to Step7

8

Replace the control unit.

Is this step completed?

Go to Step9

Go to Step8

9

1. Install all the components, and check that

those are installed properly.

2. Clear the DTC.

Is this step completed?

Go to “Diagnostic 

basic flow”.

Go to Step9

 

 

 

 

 

 

 

Content   ..  267  268  269  270   ..