|
|
TEST ACTION APPLICABILITY 2 Test the Power Top fuse in the PDC. All Yes → Replace the fuse and operate the power top several times. If the fuse blows again, use the wiring diagram/schematic as a guide to No → Go To 3 3 Disconnect the Convertible Top Relay (at the Pump assembly). All Yes → Go To 4 No → Repair the Fused B+ circuit for an open. Perform BODY VERIFICATION TEST - VER 1. 4 Turn the ignition off. All Yes → Repair the Top Down Relay Control circuit for a short to ground. Perform BODY VERIFICATION TEST - VER 1. No → Go To 5 5 Turn the ignition off. All Yes → Repair the Top Up Relay Control circuit for a short to ground. Perform BODY VERIFICATION TEST - VER 1. No → Go To 6 6 Disconnect the Convertible Top Relay (at the Pump assembly). All Yes → Repair the Top Down Relay Control circuit for a short to voltage. Perform BODY VERIFICATION TEST - VER 1. No → Go To 7 7 Disconnect the Convertible Top Relay (at the Pump assembly). All Yes → Repair the Top Up Relay Control circuit for a short to voltage. Perform BODY VERIFICATION TEST - VER 1. No → Go To 8 287 POWER TOP POWER TOP RELAY CONTROL CIRCUIT OPEN — Continued |