ALL
Page 05-11
PERIODIC INSPECTIONS
05-11
REPLACEMENT SCHEDULE
The first replacement must be performed no later than the recommended period.
The condition of the item at the end of the first period can be used as a criterion
for de-termining subsequent periods.
Items NOT listed in Tab. 05-2 are to be replaced "ON CONDITION".
If "ON CONDITIONS" items are worn, inoperative, inaccurate, and intermittent
and are not repairable through normal maintenance practices, they must be replaced.
Requirements on replacement of aircraft parts and equipment are given in Tab. 05-2.
CAUTION
ONLY ORIGINAL PARTS PROVIDED WITH EASA FORM 1 PURCHASED
FROM THE AIRCRAFT OR ORIGINAL EQUIPMENT MANUFACTURERS
SHALL BE INSTALLED ON THE WT9 DYNAMIC LSA AIRCRAFT.
CHPT. ITEM
REPLACEMENT
24
Battery
5 years or capacity drop bellow 80% or expi-
ration date on battery whichever comes first.
24
SV-BAT-320 battery
When test duration is less than 45 min.
25
EPS Magnum 601 S-LSA
18 years;
Every 6 years rocket inspection and para-
chute repacking.
25
Safety harness Schroth
12 years
25
ELT Kannad 406 AF-COMPACT
main unit battery
6 years or expiration date on battery.
25
ELT Kannad AF INTEGRA main
unit battery
7 years or expiration date on battery.
28
Fuel system rubber hoses
5 years
32
Rubber damper, rubber support
and rubber ropes of nose gear leg
5 years
32
Rubber supports of main gear
legs
5 years
71
Engine rubber parts
5 years;
For more information, refer to Line Mainte-
nance Manual for Rotax Engine Type 912
Series (Ref. No. MML-912).
71
Engine mount shocks
5 years
73
Engine fuel pump
5 years;
For more information, refer to Line Mainte-
nance Manual for Rotax Engine Type 912
Series (Ref. No. MML-912).
75
Cooling system rubber hoses
5 years
79
Oil system rubber hoses
5 years
Tab.
05-2
Replacement of Aircraft Parts