Mazda 6. Manual - part 386

 

  Index      Mazda     Mazda 6 - service repair manual 2002 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  384  385  386  387   ..

 

 

Mazda 6. Manual - part 386

 

 

U–48

CONTROL SYSTEM 

1C

Blower motor 
control signal

Power MOS FET

Fan switch is OFF

Below 1.0

• Inspect terminal voltage of 

climate control unit (1A)

Fan switch is at manual 
LO

4.1

Fan switch is at manual 
HI

7.9

1D

1E

Rear window 
defroster SW 
signal

Rear window 
defroster relay

Rear window defroster 
switch is off

12

• Inspect for continuity or 

short circuit (Climate control 
unit—rear window defroster 
relay: 1E—E)

• Inspect rear window 

defroster relay

Rear window defroster 
switch is on

Below 1.0

• Inspect terminal voltage of 

climate control unit (1H, 1L)

• Inspect audio switch panel

1F

On-board 
diagnostic signal

A/C check 
connector

Terminal A of A/C check 
connector is shorted.

Below 1.0

• Inspect for continuity 

(Climate control unit—A/C 
check connector: 1F—A)

Other

5.4

• Inspect short circuit (Climate 

control unit—A/C check 
connector: 1F—A)

• Inspect terminal voltage of 

climate control unit (2H, 2L)

1G

1H

1I

GND

• Cabin 

temperature 
sensor

• Evaporator 

temperature 
sensor

• Ambient 

temperature 
sensor

• Water 

temperature 
sensor

• Air mix actuator

• Airflow mode 

actuator

Under any condition

Below 1.0

• Inspect terminal voltage of 

climate control unit (2L)

1J

1K

Ambient 
temperature 
sensor input

Ambient 
temperature sensor

Depends on temperature 
surrounding sensor

See  Figure 

2

• Inspect for continuity 

(Climate control unit— 
ambient temperature 
sensor: 1K—B, 1I—A)

• Inspect for short circuit 

(Climate control unit— 
ambient temperature 
sensor: 1K—B)

• Inspect ambient 

temperature sensor

• Inspect terminal voltage of 

climate control unit (2H, 2L)

1L

1M

Cabin 
temperature 
sensor input

Cabin temperature 
sensor

Depends on temperature 
surrounding sensor

See  Figure 

3

• Inspect for continuity 

(Climate control unit— cabin 
temperature sensor: 1M—B, 
1I—A)

• Inspect for short circuit 

(Climate control unit— cabin 
temperature sensor: 1M—B)

• Inspect cabin temperature 

sensor

• Inspect terminal voltage of 

climate control unit (2H, 2L)

1N

Terminal

Signal

Connected to 

Test condition

Voltage (V)

Action

CONTROL SYSTEM 

U–49

U

1O

Water 
temperature 
sensor input

Water temperature 
sensor

Depends on temperature 
surrounding sensor

See  Figure 

4

• Inspect for continuity 

(Climate control unit—water 
temperature sensor: 1O—A, 
1I—B)

• Inspect for short circuit 

(Climate control unit—water 
temperature sensor: 1O—A)

• Inspect water temperature 

sensor

• Inspect terminal voltage of 

climate control unit (2H, 2L)

1P

A/C Refrigerant 

pressure switch

Fan switch at OFF

12

• Inspect for continuity or 

short circuit (Climate control 
unit—refrigerant pressure 
switch: 1P—A (Dual-
pressure type), 1P—C 
(Triple-pressure type)) 
(Refrigerant pressure 
switch—PCM: B—1AC)

• Inspect refrigerant pressure 

switch

• Inspect PCM terminal 

voltage (1AC)
(See 

F–45 PCM 

INSPECTION

 )

Fan switch at 1st 
position, A/C switch ON

Below 1.0

• Inspect terminal voltage of 

climate control unit (2H, 2L)

1Q

Evaporator 
temperature 
sensor input 
signal

Evaporator 
temperature sensor

Depends on temperature 
surrounding sensor

See  Figure 

1

• Inspect for continuity 

(Climate control unit— 
evaporator temperature 
sensor: 1Q—A, 1I—B)

• Inspect for short circuit 

(Climate control unit— 
evaporator temperature 
sensor: 1Q—A)

• Inspect evaporator 

temperature sensor

• Inspect terminal voltage of 

climate control unit (2H, 2L)

1R

1S

Solar radiation 
sensor input

Solar radiation 
sensor

Incandescent light (60W
shining on solar 
radiation sensor from 
distance of approx. 
100mm {3.9 in}

4.0

• Inspect for continuity or 

short circuit (Climate control 
unit—solar radiation sensor: 
1S—B, 1B—A)

• Inspect terminal voltage of 

climate control unit (1B)

• Inspect solar radiation 

sensor

Light to solar radiation 
sensor block

Below 1.0

1T

GND

Ground

Under any condition

Below 1.0

• Inspect for continuity 

(Climate control unit—
ground: 1T—GND)

• Inspect center panel

1U

Potentiometer 
signal

Air mix actuator

Set temperature at MAX 
COLD

0.6

• Inspect for continuity or 

short circuit (Climate control 
unit—air mix actuator: 1U—
C)

• Inspect air mix actuator

• Inspect terminal voltage of 

climate control unit (1B)

Set temperature at MAX 
HOT

4.3

1V

Terminal

Signal

Connected to 

Test condition

Voltage (V)

Action

U–50

CONTROL SYSTEM 

1W

Potentiometer 
signal

Airflow mode 
actuator

VENT mode

4.3

• Inspect for continuity or 

short circuit (Climate control 
unit—airflow mode actuator: 
1W—C)

• Inspect airflow mode 

actuator

• Inspect terminal voltage of 

climate control unit (1B)

BI-LEVEL mode

3.3

HEAT mode

2.3

HEAT/DEF mode

1.5

DEFROSTER mode

0.6

1X

Hazard warning 
SW signal

Hazard warning 
switch

Hazard warning switch is 
off

12

• Inspect for continuity or 

short circuit (Climate control 
unit—flasher unit: 1X—H)

• Inspect flasher unit

Hazard warning switch is 
on

Below 1.0

• Inspect terminal voltage of 

climate control unit (1T)

• Inspect center panel

2A

Panel light control 
signal

Panel light control 
switch

Headlight switch ON and 
panel light control switch 
at max. illumination

0.2

• Inspect for continuity 

(Climate control unit— panel 
light control switch: 2A—C) 
(Panel light control switch—
ground: C—GND)

• Inspect panel light control 

switch

Headlight switch ON and 
panel light control switch 
at min. illumination

10.2

• Inspect for short circuit 

(Climate control unit— panel 
light control switch: 2A—C)

2B

TNS signal

TNS relay

Headlight switch OFF

Below 1.0

• Inspect for short circuit 

(Climate control unit—TNS 
relay: 2B—D)

• Inspect TNS relay

• Inspect headlight switch

Headlight switch ON

12

• Inspect for continuity or 

short circuit (Climate control 
unit—TNS relay: 2B—D)

• Inspect TNS relay

• Inspect headlight switch

2C

Motor drive signal

Air mix actuator

Moving to COLD

12

• Inspect for continuity or 

short circuit (Climate control 
unit—air mix actuator: 2D—
D, 2C—F)

• Inspect air mix actuator

Moving to HOT

Below 1.0

2D

Motor drive signal

Air mix actuator

Moving to HOT

12

• Inspect for continuity or 

short circuit (Climate control 
unit—air mix actuator: 2C—
F, 2D—D)

• Inspect air mix actuator

Moving to COLD

Below 1.0

2E

Motor drive signal

Airflow mode 
actuator

Moving to DEFROSTER

12

• Inspect for continuity or 

short circuit (Climate control 
unit—airflow mode actuator: 
2E—F, 2G—D)

• Inspect airflow mode 

actuator

Moving to VENT

Below 1.0

2F

Backup power 
supply

 ROOM 15 A fuse

Under any condition

B+

• Inspect for continuity or 

short circuit (Climate control 
unit—fuse: 2F— ROOM 15 
A fuse)

• Inspect ROOM 15 A fuse

2G

Motor drive signal

Airflow mode 
actuator

Moving to VENT

12

• Inspect for continuity or 

short circuit (Climate control 
unit—airflow mode actuator: 
2G—D, 2E—F)

• Inspect airflow mode 

actuator

Moving to DEFROSTER

Below 1.0

Terminal

Signal

Connected to 

Test condition

Voltage (V)

Action

CONTROL SYSTEM 

U–51

U

End Of Sie

2H

IG2

A/C 15 A fuse

Ignition switch at ON 
position

B+

• Inspect for continuity or 

short circuit (Climate control 
unit—fuse: 2H—A/C 15 A 
fuse)

• Inspect A/C 15 A fuse

Ignition switch at LOCK 
position

Below 1.0

• Inspect for short circuit 

(Climate control unit—fuse: 
2H—A/C 15 A fuse)

2I

Motor drive signal

Air intake actuator

Moving to 
RECIRCULATE

12

• Inspect for continuity or 

short circuit (Climate control 
unit—air intake actuator: 
2I—F, 2K—D)

• Inspect air intake actuator

Moving to FRESH

Below 1.0

2J

2K

Motor drive signal

Air intake actuator

Moving to FRESH

12

• Inspect for continuity or 

short circuit (Climate control 
unit—air intake actuator: 
2K—D, 2I—F)

• Inspect air intake actuator

Moving to 
RECIRCULATE

Below 1.0

2L

GND

Ground

Under any condition

Below 1.0

• Inspect for continuity 

(Climate control unit—
ground: 2L—GND)

Terminal

Signal

Connected to 

Test condition

Voltage (V)

Action

 

 

 

 

 

 

 

Content   ..  384  385  386  387   ..