|
|
28. Install main shift rail (1) bearings (2) on main shift rail. 29. Install main shift rail (1) through rail support (2) and housing, then rotate counterclockwise into 30. Install 1-2 shift fork then, install 1-2 shift rail (2) into shift fork and housing. Install shift fork roll pin 21 - 56 MANUAL TRANSMISSION-GETRAG 238 ND |