|
|
4. Application of adhesive. • Apply adhesive all over the melt-sheet. NOTE:Use epoxy resin adhesive designed to harden quickly at ambient temperature. Follow the adhesive manufacturer's instructions. 6. Application of dust sealant. • Apply dust sealer all the way around the floors. NOTE: It is essential to make the floor completely imper- vious to water as seepage into honeycomb construction will adversely affect its performance. Use sufficient dust sealant to seal the floor. • Using a bristle brush or spatula, spread the dust sealant all over the surface until it becomes smooth and flat. • Check that the dust sealant is applied to the seat brackets thoroughly. 5. Installation of new honeycomb floors. • Install the new honeycomb floors. • Clamp the floor in place using a clamp at the front and two clamps at the rear as shown. NOTE: Place weights on the floor for 30-60 minutes until the adhesive hardens. 7. Apply the paint (body color). • See Paint Repair Manual. • Ventilate when spraying paint. Most paint contains substances that are harmful if inhaled or swallowed. Read the paint label before opening paint container. • Avoid contact with skin. Wear an approved respirator, gloves, eye protection and appropriate clothing when painting. • Paint is flammable. Store in a safe place, and keep it away from sparks, flames or cigarettes. 8. Install the related parts. 9. Check and clean. Check the electrical parts for proper operation. Main Menu Table of Contents |