|
|
EXHAUST MANIFOLD EM-155 < REMOVAL AND INSTALLATION > [MR20DD] C D E F G H I J K L M A EM N P O a. Tighten nuts in the order from 1 to 8 as shown in the figure. NOTE: b. Retighten nuts in the order from 1 to 8 as shown in the figure. 4. Install exhaust manifold stay in the direction as shown in the figure. 5. Install remaining parts in the reverse order of removal. CAUTION: Prevent rust preventives from adhering to the sensor body. NOTE: Inspection INFOID:0000000010715477 INSPECTION AFTER REMOVAL Surface Distortion • Using feeler gauge (A) and straightedge (B), check the surface dis- tortion of exhaust manifold mating surface in each exhaust port • If it exceeds the limit, replace exhaust manifold. INSPECTION AFTER INSTALLATION Check the joint of parts with the engine in running state. Check that there is no leakage of exhaust gas and : Engine front JPBIA6799ZZ : Exhaust manifold : Upper mark JPBIA6835ZZ Limit : Refer to . JPBIA6800ZZ |