|
|
MULTIPORT FUEL INJECTION (MFI) DIAGNOSIS TSB Revision MULTIPORT FUEL INJECTION (MFI) 13A-805 STEP 20. Check harness connector B-109 at starter YES : Go to Step 21. Connector Inspection . Then confirm that the malfunction symptom is eliminated. STEP 21. Measure the power supply voltage at starter harness side. (2) Turn the ignition switch to the "START" position. • Voltage should be battery positive voltage (4) Turn the ignition switch to the "LOCK" (OFF) position. present? STEP 22. Measure the power supply voltage at starter relay harness side. (2) Measure the voltage between terminal No. 4 and ground. • Voltage should be battery positive voltage Q: Is battery positive voltage (approximately 12 volts) present? starter relay connector A-28X (terminal No. 4) STEP 23. Check for open circuit and short circuit to . Then check that the malfunction is eliminated. Q: Is the harness wire in good condition? YES : Go to Step 24. is eliminated. AK704593 1 B-109 harness AB 2 1 3 AK700519AC A-28X harness |