|
|
INTAKE MANIFOLD TSB Revision INTAKE AND EXHAUST 15-15 INTAKE MANIFOLD REMOVAL AND INSTALLATION M1151003003920 Pre-removal operation tion System − Ignition Coil ). • Air By-pass Valve, Air By-pass Hose, Charge Air Cooler Intake Hose B Removal (Refer to ). • Air Cleaner Assembly Removal (Refer to ). • Drive Belt Removal (Refer to GROUP 11A, Crankshaft Pulley ). • Throttle Body Removal (Refer to GROUP 13A, Throttle • Fuel Delivery Pipe and Fuel Injector Assembly Removal (Refer to GROUP 13A, Injector ). Post-installation operation (Refer to GROUP 13A, Injector • Throttle Body Installation (Refer to GROUP 13A, Throttle Body • Air Cleaner Assembly Installation (Refer to ). • Drive Belt Installation (Refer to GROUP 11A, Crankshaft Pulley ). • Air By-pass Valve, Air By-pass Hose, Charge Air Cooler Intake Hose B Installation (Refer to ) • Engine Upper Cover Installation (Refer to GROUP 16, Ignition System − Ignition Coil AC902501 5 3 2 6 19 16 1 20 N 10 18 21 8 13 12 N 9 (Engine oil) 22 21 AB 21 20 ± 2 N·m 10 ± 2 N·m 20 ± 2 N·m 23 ± 6 N·m 23 ± 6 N·m 8.0 ± 2.0 N·m 9.5 ± 2.5 N·m 5.0 ± 1.0 N·m 10 ± 2 N·m 10 ± 2 N·m 14 ± 1 N·m 10 ± 2 N·m 7 15 23 ± 6 N·m 17 N 11 N (Engine oil) 4 14 |