|
|
|
Content .. 1358 1359 1360 1361 ..
17. Install the generator (2). 18. Install the accessory drive belt. (Refer to 7 - COOLING/ACCESSORY DRIVE/DRIVE BELTS - 19. Install the radiator (Refer to 7 - COOLING/EN- GINE/RADIATOR - INSTALLATION). 20. Install the air cleaner assembly. (Refer to 9 - ENGINE/AIR INTAKE SYSTEM - INSTALLATION) 21. Install the battery negative cable. 22. Refill coolant. (Refer to 7 - COOLING - STAN- DARD PROCEDURE) 23. Refill engine oil. 24. Start engine and check for leaks. 9 - 2362 ENGINE - 5.7L - SERVICE INFORMATION DR/DH |