|
|
(3) Raise and support the vehicle on a hoist. sion installation. (6) Install the inspection plate. CAL/CHARGING/GENERATOR - INSTALLATION). (12) Install starter motor (Refer to 8 - ELECTRI- CAL/STARTING/STARTER MOTOR - INSTALLA- (13) Connect power steering hoses, if equipped. tem, if equipped (Refer to 24 - HEATING & AIR - STANDARD PROCEDURE). (16) Using a new gasket, install throttle body. Tighten the throttle body bolts to 23 N·m (200 in. (17) Connect the accelerator linkage. intake manifold. (22) Connect the fuel supply lines. ENGINE/RADIATOR - INSTALLATION). Connect (24) Install fan shroud in position. ENGINE - STANDARD PROCEDURE). (26) Install the air cleaner. marks. (30) Road test vehicle. SPECIFICATIONS TORQUE DESCRIPTION N·m Ft. Lbs. In. Lbs. Camshaft Sprocket—Bolt 68 50 — Camshaft Thrust Plate—Bolts 24 — 210 Chain Case Cover—Bolts 41 30 — Connecting Rod Cap—Bolts 61 45 — DESCRIPTION N·m Ft. Lbs. In. Lbs. Main Bearing Cap—Bolts 115 85 — Crankshaft Pulley—Bolts 24 — 210 Cylinder Head—Bolts Step 1 68 50 — Step 2 143 105 — Cylinder Head Cover—Bolts 11 — 95 Engine Support Bracket to 41 30 — Exhaust Manifold to Cylinder 34 25 — Flywheel—Bolts 75 55 — Front Insulator—Through 95 70 — Front Insulator to Support Stud Nut (4WD) 41 30 — Through Bolt/Nut 102 75 — Front Insulator to Block—Bolts 95 70 — Generator—Mounting Bolts 41 30 — Intake Manifold—Bolts Refer to Procedure Oil Pan—Bolts 24 — 215 Oil Pan—Drain Plug 34 25 — Oil Pump—Mounting Bolts 41 30 — Oil Pump Cover—Bolts 11 — 95 Rear Insulator to Bracket— 68 50 — Rear Insulator to Crossmember 41 30 — Rear Insulator to 68 50 — Rear Insulator to Rear Insulator Bracket—Bolts 68 50 — Rear Support Plate to Transfer Rocker Arm—Bolts 28 21 — Spark Plugs 41 30 — Starter Motor—Mounting Bolts 68 50 — Thermostat Housing—Bolts 25 — 225 Throttle Body—Bolts 23 — 200 9a - 62 ENGINE 5.2L INTERNATIONAL R1 ENGINE 5.2L INTERNATIONAL (Continued) |