Chrysler PT Cruiser. Manual - part 169

 

  Index      Chrysler     Chrysler PT Cruiser - service repair manual 2005 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  167  168  169  170   ..

 

 

Chrysler PT Cruiser. Manual - part 169

 

 

TEST

ACTION

APPLICABILITY

3

Turn the ignition off.
Install a substitute relay in place of the ASD Relay.
Turn the ignition on.
With the DRBIII

t, erase DTCs.

Perform several ignition key cycles, pausing for at least 10 seconds between each
cycle.
Turn the ignition on.
With the DRB, read ECM DTCs.
Did this DTC set again?

All

Yes

→ Go To 4

No

→ Replace the ASD Relay.

Perform ROAD TEST VERIFICATION - VER-2.

4

Turn the ignition off.
Remove the ASD Relay from the PDC.
Disconnect the ECM harness connectors.
Measure the resistance between ground and the ASD Relay Control circuit while
wiggling the wiring harness and connectors.
Was the resistance below 1000 ohms at any time while wiggling the wiring harness
and connectors?

All

Yes

→ Repair the ASD Relay Control circuit for an intermittent short to

ground.
Perform ROAD TEST VERIFICATION - VER-2.

No

→ Go To 5

5

Turn the ignition off.
Remove the ASD Relay from the PDC.
Turn the ignition on.
Measure the voltage of the ASD Relay Output circuit.
Is the voltage below 0.5 volt?

All

Yes

→ Replace and program the Engine Control Module in accordance

with the Service Information.
Perform ROAD TEST VERIFICATION - VER-2.

No

→ Repair the ASD Relay Output circuit for a short to voltage.

Perform ROAD TEST VERIFICATION - VER-2.

156

DRIVEABILITY - DIESEL

P0685-ASD RELAY CONTROL CIRCUIT SHUTS OFF TOO LATE —

Continued

TEST

ACTION

APPLICABILITY

6

WARNING: WHEN THE ENGINE IS OPERATING, DO NOT STAND IN A
DIRECT LINE WITH THE FAN. DO NOT PUT YOUR HANDS NEAR THE
PULLEYS, BELTS OR FAN. DO NOT WEAR LOOSE CLOTHING.
NOTE: The conditions that set the DTC are not present at this time. The
following list may help in identifying the intermittent condition.
With the engine running at normal operating temperature, monitor the DRB
parameters related to the DTC while wiggling the wiring harness. Look for param-
eter values to change and/or a DTC to set.
Review the DTC When Monitored and Set Conditions. If possible, try to duplicate the
conditions under which the DTC was set.
Refer to any Technical Service Bulletins (TSB) that may apply.
Visually inspect the related wiring harness. Look for any chafed, pierced, pinched, or
partially broken wires.
Visually inspect the related wiring harness connectors. Look for broken, bent, pushed
out, or corroded terminals.
Were any of the above conditions present?

All

Yes

→ Repair as necessary.

Perform ROAD TEST VERIFICATION - VER-2.

No

→ Test Complete.

157

DRIVEABILITY - DIESEL

P0685-ASD RELAY CONTROL CIRCUIT SHUTS OFF TOO LATE —

Continued

Symptom List:

P0703-BRAKE SWITCH SIGNAL CIRCUITS PLAUSIBILITY WITH
REDUNDANT CONTACT
P0703-BRAKE SWITCH SIGNAL CKTS PLAUS W/REDUNDANT
CONTACT AFTER INITIALIZATION

Test Note:

All symptoms listed above are diagnosed using the same tests.

The title for the tests will be P0703-BRAKE SWITCH SIGNAL
CIRCUITS PLAUSIBILITY WITH REDUNDANT CONTACT.

When Monitored and Set Condition:

P0703-BRAKE SWITCH SIGNAL CIRCUITS PLAUSIBILITY WITH REDUNDANT
CONTACT

When Monitored:

With the ignition on.

Set Condition:

The ECM detects the Primary Brake Switch Signal circuit and Secondary

Brake Switch Signal circuit inputs to the ECM do not agree.

P0703-BRAKE SWITCH SIGNAL CKTS PLAUS W/REDUNDANT CONTACT AF-
TER INITIALIZATION

When Monitored:

With the ignition on.

Set Condition:

The ECM detects the Primary Brake Switch Signal circuit and Secondary

Brake Switch Signal circuit inputs to the ECM do not agree.

POSSIBLE CAUSES

INTERMITTENT CONDITION

BRAKE LAMP SWITCH - SECONDARY OPEN

BRAKE LAMP SWITCH FUSED B+ CIRCUIT OPEN

SECONDARY BRAKE SWITCH SIGNAL CIRCUIT SHORTED TO GROUND

BRAKE LAMP SWITCH - PRIMARY OPEN

SECONDARY BRAKE SWITCH GROUND CIRCUIT OPEN

SECONDARY BRAKE SWITCH SIGNAL CIRCUIT OPEN

PRIMARY BRAKE SWITCH SIGNAL CIRCUIT SHORTED TO VOLTAGE

PRIMARY BRAKE SWITCH SIGNAL CIRCUIT OPEN

ENGINE CONTROL MODULE - INTERNAL

ENGINE CONTROL MODULE - PRIMARY BRAKE SIGNAL

ENGINE CONTROL MODULE - SECONDARY BRAKE SIGNAL

158

DRIVEABILITY - DIESEL

TEST

ACTION

APPLICABILITY

1

NOTE: If the ECM detects and stores a DTC, the ECM also stores the
engine/vehicle operating conditions under which the DTC was set. Some of
these conditions are displayed on the DRB at the same time the DTC is
displayed.
NOTE: Before erasing stored DTCs, record these conditions. Attempting to
duplicate these conditions may assist when checking for an active DTC.
Turn the ignition on.
While observing the PRIM BRAKE SWITCH status on the DRB display, press and
release the brake pedal several times.
Does the DRB display PRIM BRAKE SWITCH: PRESSED and RELEASED for the
appropriate pedal position?

All

Yes

→ Go To 2

No

→ Go To 11

2

Turn the ignition on.
While observing the SEC BRAKE SWITCH status on the DRB display, press and
release the brake pedal several times.
Does the DRB display SEC BRAKE SWITCH: PRESSED and RELEASED for the
appropriate pedal position?

All

Yes

→ Go To 3

No

→ Go To 4

3

WARNING: WHEN THE ENGINE IS OPERATING, DO NOT STAND IN A
DIRECT LINE WITH THE FAN. DO NOT PUT YOUR HANDS NEAR THE
PULLEYS, BELTS OR FAN. DO NOT WEAR LOOSE CLOTHING.
NOTE: The conditions that set the DTC are not present at this time. The
following list may help in identifying the intermittent condition.
With the engine running at normal operating temperature, monitor the DRB
parameters related to the DTC while wiggling the wiring harness. Look for param-
eter values to change and/or a DTC to set.
Review the DTC When Monitored and Set Conditions. If possible, try to duplicate the
conditions under which the DTC was set.
Refer to any Technical Service Bulletins (TSB) that may apply.
Visually inspect the related wiring harness. Look for any chafed, pierced, pinched, or
partially broken wires.
Visually inspect the related wiring harness connectors. Look for broken, bent, pushed
out, or corroded terminals.
Were any of the above conditions present?

All

Yes

→ Repair as necessary.

Perform ROAD TEST VERIFICATION - VER-2.

No

→ Test Complete.

4

Turn the ignition off.
Disconnect the Brake Lamp Switch harness connector.
Turn the ignition on.
Measure the voltage between the Secondary Brake Switch Signal circuit and ground.
Is the voltage above 9.0 volts?

All

Yes

→ Go To 5

No

→ Go To 8

159

DRIVEABILITY - DIESEL

P0703-BRAKE SWITCH SIGNAL CIRCUITS PLAUSIBILITY WITH RE-
DUNDANT CONTACT —

Continued

 

 

 

 

 

 

 

Content   ..  167  168  169  170   ..