TEST
ACTION
APPLICABILITY
10
Turn the ignition off.
Disconnect the ECM harness connectors.
Disconnect the Generator Field harness connector.
Measure the resistance of the Generator Field Control circuit.
Is the resistance below 5.0 ohms?
All
Yes
→ Go To 11
No
→ Repair the Generator Field Control circuit for an open.
Perform CHARGING VERIFICATION - VER-3.
11
Turn the ignition off.
Disconnect the generator harness connector.
Turn the ignition on.
Measure the voltage of the ASD Relay Output circuit.
Is the voltage above 10.0 volts?
All
Yes
→ Go To 12
No
→ Repair the ASD Relay Output circuit for an open.
Perform CHARGING VERIFICATION - VER-3.
12
Turn the ignition off.
Disconnect the ECM harness connectors.
Remove Fuse 13 from the PDC.
Measure the resistance of the Fused B+ circuit at ECM harness connector cavity
C1-19.
Is the resistance below 5.0 ohms?
All
Yes
→ Go To 13
No
→ Repair the Fused B+ circuit for high resistance.
Perform CHARGING VERIFICATION - VER-3.
13
Turn the ignition off.
Disconnect the ECM harness connectors.
Using a 12-volt test light connected to 12-volts, check the Ground circuit at ECM
harness connector cavity C1-20.
Does the test light illuminate brightly?
All
Yes
→ Replace and program the Engine Control Module in accordance
with the Service Information.
Perform CHARGING VERIFICATION - VER-3.
No
→ Repair the Ground circuit for high resistance.
Perform CHARGING VERIFICATION - VER-3.
116
DRIVEABILITY - DIESEL
P0560-SYSTEM VOLTAGE TOO LOW —
Continued