|
|
P0205-FUEL INJECTOR 5 CIRCUIT (CONTINUED) 5. (K38) INJECTOR CONTROL NO.5 CIRCUIT OPEN Turn the ignition off. Disconnect the C2 PCM harness connector. CAUTION: Do not probe the PCM harness connectors. Probing Is the resistance below 5.0 ohms? Yes >> Go To 6 No >> Repair the open in the (K38) Injector Control No.5 circuit. Perform POWERTRAIN VERIFICATION TEST. (Refer to 9 6. PCM NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal Were there any problems found? Yes >> Repair as necessary. Perform POWERTRAIN VERIFICATION TEST. (Refer to 9 - ENGINE - STANDARD PROCEDURE) No >> Replace and program the Powertrain Control Module per Service Information. Perform POWERTRAIN VERIFICATION TEST. (Refer to 9 - ENGINE - STANDARD PROCEDURE) 9 - 250 ENGINE ELECTRICAL DIAGNOSTICS ND |