Chrysler RG Voyager. Manual - part 1271

 

  Index      Chrysler     Chrysler RG Voyager - service repair manual 2005 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  1269  1270  1271  1272   ..

 

 

Chrysler RG Voyager. Manual - part 1271

 

 

Symptom:

P0841-LR PRESSURE SWITCH SENSE CIRCUIT

When Monitored and Set Condition:

P0841-LR PRESSURE SWITCH SENSE CIRCUIT

When Monitored:

Whenever the engine is running.

Set Condition:

The appropriate DTC is set if one of the Pressure Switches are open or

closed at the wrong time in a given gear .

POSSIBLE CAUSES

LOSS OF PRIME DTC P0944 PRESENT

TRANSMISSION CONTROL RELAY DTCS PRESENT

TCM AND WIRING

TRANSMISSION CONTROL RELAY OUTPUT CIRCUIT OPEN

L/R PRESSURE SWITCH SENSE CIRCUIT OPEN

L/R PRESSURE SWITCH SENSE CIRCUIT SHORT TO GROUND

L/R PRESSURE SWITCH SENSE CIRCUIT SHORT TO VOLTAGE

TRANSMISSION CONTROL MODULE

INTERMITTENT WIRING AND CONNECTORS

TEST

ACTION

APPLICABILITY

1

NOTE: Low fluid level can be the cause of many Transmission problems. If
the fluid level is low locate and repair the leak then check and adjust the
fluid level per the Service Information.
NOTE: Always perform diagnostics with a fully charged battery to avoid
false symptoms.
With the DRBIII

t, read the engine DTC’s. Check and repair all engine DTC’s prior

to performing Transmission Symptom Diagnostics.
With the DRBIII

t, read Transmission DTC’s. Record all DTC’s and 1 Trip Failures.

NOTE: Diagnose 1 Trip Failures as a fully matured DTC.
Using the wiring diagram/schematic as a guide, inspect the wiring and connectors.
Repair as necessary.
Perform the Shift Lever Position Test. If the test does not pass, refer to Symptom test
for P0706 Check Shifter Signal.
For Gear Ratio DTC’s, check and record all CVI’s.
Most DTC’s set on start up but some must be set by driving the vehicle such that all
diagnostic monitors have run.
NOTE: Verify flash level of Transmission Control Module. Some problems
are corrected by software upgrades to the Transmission Control Module.
NOTE: Check for applicable Service Bulletins related to the symptom.
Perform this procedure prior to Symptom diagnosis.

All

Continue

Go To

2

85

TRANSMISSION - EATX

TEST

ACTION

APPLICABILITY

2

With the DRBIII

t, check for other Transmission DTC’s.

Is the DTC P0944 present also?

All

Yes

→ Refer to the Transmission category and perform the appropriate

symptom.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Go To 3

3

With the DRBIII

t, read Transmission DTC’s

Are there any Transmission Control Relay related DTC’s P0888, P0890, or P0891
present?

All

Yes

→ Refer to the Transmission category and perform the appropriate

symptom.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Go To 4

4

With the DRBIII

t, Check the STARTS SINCE SET counter for P0841.

NOTE: This counter only applies to the last DTC set.
Is the STARTS SINCE SET counter 2 or less?

All

Yes

→ Go To 5

No

→ Go To 11

5

Turn the ignition off to the lock position.
Remove the Starter Relay.
CAUTION: Removal of the Starter Relay is to prevent a Transmission, NO
RESPONSE, condition and disable the starter.
Install the Transmission Simulator, Miller tool #8333 and the Electronic Transmis-
sion Adapter kit, Miller tool #8333-1A.
Note: Check connectors - Clean/repair as necessary.
Ignition on, engine not running.
On the Transmission Simulator select L/R on the Pressure Switch selector switch.
With the DRBIII

t, monitor the L/R Pressure Switch state while pressing the

Pressure Switch Test button on the Transmission Simulator.
Did the Pressure Switch state change from OPEN to CLOSED when the test button
was pressed?

All

Yes

→ Replace the Transmission Solenoid/Pressure Switch Assembly per

the Service Information.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Go To 6

86

TRANSMISSION - EATX

P0841-LR PRESSURE SWITCH SENSE CIRCUIT —

Continued

TEST

ACTION

APPLICABILITY

6

Turn the ignition off to the lock position.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and Transmission Control Relay
Output circuit in the Transmission Control Relay connector.
Using a 12-volt test light connected to ground, check the Transmission Control Relay
Output circuit in the Solenoid/Pressure Switch Assembly harness connector.
NOTE: The test light must illuminate brightly. Compare the brightness to
that of a direct connection to the battery.
Does the test light illuminate brightly?

All

Yes

→ Go To 7

No

→ Repair the Transmission Control Relay Output circuit for an open

or high resistance. If the fuse is open make sure to check for a
short to ground.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

7

Turn the ignition off to the lock position.
Disconnect the TCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Note: Check connectors - Clean/repair as necessary.
Measure the resistance of the L/R Pressure Switch Sense circuit from the TCM
harness connector to the Transmission Solenoid/Pressure Switch Assembly harness
connector.
Is the resistance above 5.0 ohms?

All

Yes

→ Repair the L/R Pressure Switch Sense circuit for an open.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Go To 8

8

Turn the ignition off to the lock position.
Disconnect the TCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Note: Check connectors - Clean/repair as necessary.
Measure the resistance between ground and the L/R Pressure Switch Sense circuit.
Is the resistance below 5.0 ohms?

All

Yes

→ Repair the L/R Pressure Switch circuit for a short to ground.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Go To 9

9

Turn the ignition off to the lock position.
Disconnect the TCM harness connector.
Disconnect the Transmission Solenoid/Pressure Switch Assembly harness connector.
Remove the Transmission Control Relay.
Note: Check connectors - Clean/repair as necessary.
Connect a jumper wire between the Fused B+ circuit and Transmission Control Relay
Output circuit in the Transmission Control Relay connector.
Ignition on, engine not running.
Measure the voltage of the L/R Pressure Switch Sense circuit.
Is the voltage above 0.5 volt?

All

Yes

→ Repair the L/R Pressure Switch Sense circuit for a short to

voltage.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Go To 10

87

TRANSMISSION - EATX

P0841-LR PRESSURE SWITCH SENSE CIRCUIT —

Continued

TEST

ACTION

APPLICABILITY

10

Using the schematics as a guide, inspect the wiring and connectors. Repair as
necessary. Pay particular attention to all power and ground circuits.
If there are no possible causes remaining, view repair

All

Repair

Replace the Transmission Control Module per the Service Infor-
mation. WITH THE DRBIII

t PERFORM QUICK LEARN AND

REPROGRAM PINION FACTOR.
Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

11

The conditions necessary to set this DTC are not present at this time.
Using the schematics as a guide, inspect the wiring and connectors specific to this
circuit.
Wiggle the wiring while checking for shorted and open circuits.
With the DRBIII

t, check the EATX EVENT DATA to help identify the conditions in

which the DTC was set.
Were there any problems found?

All

Yes

→ Repair as necessary.

Perform 41TE TRANSMISSION VERIFICATION TEST - VER 1.

No

→ Test Complete.

88

TRANSMISSION - EATX

P0841-LR PRESSURE SWITCH SENSE CIRCUIT —

Continued

 

 

 

 

 

 

 

Content   ..  1269  1270  1271  1272   ..