Index Chrysler Chrysler 300M / Concorde / Interpid / LHS, Dodge Interpid - service repair manual 2000-2004 year
|
|
(6) Tighten engine mount fastener to 61 N·m (45 ft. lbs.). (7) Align flex plate to torque converter and install mounting bolts. Tighten bolts to 75 N·m (55 ft. lbs.). (8) Install crankshaft position sensor. (Refer to 14 - FUEL SYSTEM/FUEL INJECTION/CRANKSHAFT (9) Install starter. (Refer to 8 - ELECTRICAL/ STARTING/STARTER MOTOR - INSTALLATION) (10) Install new V-Band clamp at left side exhaust manifold to catalytic converter. Tighten V-Band (11) Install left side catalytic converter down pipe support fastener at transaxle. Tighten fastener to 47 (12) Tighten the left converter down pipe band clamp. the transmission oil cooler lines bracket to engine. (14) Install structural collar/cover. (Refer to 9 - ENGINE/ENGINE BLOCK/STRUCTURAL COVER - (15) Lower vehicle. tighten to 102 N·m (75 ft. lbs.). (18) Install water pipe and retaining fasteners to the transaxle/cylinder block double-ended bolts. (19) Install rear throttle body support bracket. ENGINE/MANIFOLDS/INTAKE MANIFOLD - INSTALLATION) (22) Connect ground straps at both cylinder heads. pressure container. (25) Connect throttle and speed control cables to bracket and throttle arm. (Refer to 14 - FUEL SYS- INJECTION/THROTTLE CONTROL CABLE - INSTALLATION) (26) Connect fuel line. (Refer to 14 - FUEL SYS- TEM/FUEL DELIVERY/FUEL LINES - STANDARD (27) Install new V-Band clamp at right exhaust man- ifold. Tighten V-Band clamp to 11 N·m (100 in. lbs.). (28) Install and tighten right side catalytic con- verter down pipe support bracket fastener at trans- (29) Install air conditioning compressor and tighten fasteners to 28 N·m (250 in. lbs.). (30) Install power steering pump and tighten fas- teners to 28 N·m (250 in. lbs.). (31) Install generator. (Refer to 8 - ELECTRICAL/ CHARGING/GENERATOR - INSTALLATION) (32) Install radiator. (Refer to 7 - COOLING/EN- GINE/RADIATOR - INSTALLATION) (33) Attach air conditioning condenser to radiator. lines to radiator. (36) Install lower radiator hose. COOLING/ACCESSORY DRIVE/DRIVE BELTS - INSTALLATION) . (39) Install radiator fan. (Refer to 7 - COOLING/ ENGINE/RADIATOR FAN - INSTALLATION) (40) Fill cooling system. (Refer to 7 - COOLING - STANDARD PROCEDURE) (41) Fill engine with proper amount of oil. install upper radiator crossmember. (Refer to 23 - (43) Install air cleaner and air inlet hose. EXTERIOR/FRONT STRUT TOWER TO TOWER (45) Install both cowl covers. (Refer to 23 - BODY/ EXTERIOR/COWL GRILLE AND SCREEN - INSTALLATION) (46) Install both wiper arms. (Refer to 8 - ELEC- TRICAL/WIPERS/WASHERS/WIPER ARMS - INSTALLATION) (47) Install hood. (Refer to 23 - BODY/HOOD/ HOOD - INSTALLATION) (48) Connect negative cable. SPECIFICATIONS 3.5L ENGINE DESCRIPTION SPECIFICATION Type 60° SOHC V-6 24-Valve Displacement 3.5 Liters (214 Cubic Inches) Bore and Stroke 96.0 x 81.0 mm (3.780 x 3.189 in.) Compression Ratio 9.9:1 Lead Cylinder #1 Right Bank Firing Order 1-2-3-4-5-6 Cylinder Block Cylinder Bore Diameter 96.0 mm ±0.0076 (3.780 in. ±0.0003 in.) Out-of-Round (Max.) 0.076 mm (0.003 in.) Taper (Max.) 0.051 mm (0.002 in.) LH ENGINE 9 - 15 ENGINE 3.5L (Continued) |